GTR 88158349

Tenders Are Invited For Heating, Ventilation And Air-Conditioning Installation Work – Municipality Of Pleidelsheim - New Construction Of Neckarbande Daycare Center: Heating Trade

ICB — International Competitive Bid Closed Western Europe
Tender Information
GTR Reference
88158349
Tendering Authority
Subscribe to view
Tender No
665333-2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Heating, Ventilation And Air-Conditioning Installation Work – Municipality Of Pleidelsheim - New Construction Of Neckarbande Daycare Center: Heating Trade
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
03-12-2024 Closed
Work Detail
Heating, Ventilation And Air-Conditioning Installation Work – Municipality Of Pleidelsheim - New Construction Of Neckarbande Daycare Center: Heating Trade. The Municipality Of Pleidelsheim Is Planning To Build A New 5-Class Daycare Center On The Northwestern Outskirts Of Pleidelsheim. The Construction Site Extends Along The Dam Structure On The Neckar Canal And Is Currently Used As A Public Playground And Barbecue Area. The Two-Story Building, Which Does Not Have A Basement, Is To Be Built As A Hybrid Construction With Reinforced Concrete Walls And Ceilings, As Well As Wooden Stud Walls With Stacked Board Ceilings. On The Ground Floor, In Addition To A Cooking Kitchen And Various Technical And Storage Rooms, There Is A Multi-Purpose Room, As Well As Rooms For Two Groups And A Multi-Room. On The Upper Floor There Are Rooms For Three Additional Groups, As Well As For The Kindergarten Management And Staff. As A Second Escape Route On The Upper Floor, An Escape Balcony Is Arranged On Three Sides Around The Building. The Escape Balcony Leads Via Stairs To The Ground Floor Of The Outdoor Facilities. Implementation And Scheduling Of The New Building: The Start Of The Construction Work For The New Building Is Planned For The 8Th Week Of 2025. The Daycare Center Must Be Ready For Occupancy By The End Of August 2026. Accordingly, The Construction Site Equipment Must Be Available For The Shell Construction Work From The Beginning Of The 8Th Week Of 2025. Four Months Of Construction Time Are Planned For The Completion Of The Shell Construction Work, I.E. The Shell Construction Work Must Be Completed In Week 25/2025 So That The Wooden Structure Can Be Erected From Week 26/2025. The Performance Includes The Following Main Dimensions (Approximate Information): - Brine/Water Heat Pump 33 Kw - Buffer Storage 720 L - Well Pump With Connection To On-Site Well Drilling - Underfloor Heating Approx. 1,500 M² Heated Area, Approx. 8,900 Running Meters Of Pe Pipe - Piping Network Made Of Stainless Steel More Details Details Can Be Found In The Tender Documents, In Particular The List Of Services.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
2026999b-16d5-44b7-ae73-9058bffb1b6b.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders