GTR 87920475

Tenders Are Invited For Construction-Site Supervision Services - Selection Of A Contractor For The Exercise Of Construction Supervision During The Implementation Of Cmr Of A Site: Major Repair Of Edelvais Street, Tulovo Village, Maglizh Municipality From O.T. 6 (Through Pt. ​​15-Pt. 16-Pt. 198-Pt. 53-Pt. 69-Pt. 68-Pt. 131-Pt. 132 - O.T.133-O.T.134-O.T.155-O.T.156-O.T.158-O.T.158-O.T.157-O.T.162-O .Item 163A-Item 163-Item 164-Item 165-Item 184A-Item 184-185) To Item 186

ICB — International Competitive Bid Closed Eastern Europe
Tender Information
GTR Reference
87920475
Tendering Authority
Subscribe to view
Tender No
660467-2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction-Site Supervision Services - Selection Of A Contractor For The Exercise Of Construction Supervision During The Implementation Of Cmr Of A Site: Major Repair Of Edelvais Street, Tulovo Village, Maglizh Municipality From O.T. 6 (Through Pt. ​​15-Pt. 16-Pt. 198-Pt. 53-Pt. 69-Pt. 68-Pt. 131-Pt. 132 - O.T.133-O.T.134-O.T.155-O.T.156-O.T.158-O.T.158-O.T.157-O.T.162-O .Item 163A-Item 163-Item 164-Item 165-Item 184A-Item 184-185) To Item 186
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Eastern Europe
Political Region
Balkans,European Union,G20
Last Date of Bid Submission
28-11-2024 Closed
Work Detail
Construction-Site Supervision Services - Selection Of A Contractor For The Exercise Of Construction Supervision During The Implementation Of Cmr Of A Site: Major Repair Of Edelvais Street, Tulovo Village, Maglizh Municipality From O.T. 6 (Through Pt. ​​15-Pt. 16-Pt. 198-Pt. 53-Pt. 69-Pt. 68-Pt. 131-Pt. 132 - O.T.133-O.T.134-O.T.155-O.T.156-O.T.158-O.T.158-O.T.157-O.T.162-O .Item 163A-Item 163-Item 164-Item 165-Item 184A-Item 184-185) To Item 186. Continuation Of Section: Description (Bt-24-Procedure): • Drawing Up Of Findings, After Completion Of The Construction And Installation Works, Together With The Contracting Authority And The Executors Of The Design And Construction And Installation Activities, With Which It Certifies That The Construction Was Carried Out In Accordance With The Approved Projects, The Certified Executive Documentation, The Construction Requirements And The Terms Of The Concluded Contract. With This Act, The Construction Is Handed Over By The Contractor Of The Construction And Assembly Activities To The Contracting Authority; • Assistance Of The Contracting Authority, After The Completion Of The Construction And Assembly Works And Completion Of The Acceptance Tests, To Make A Request For The Commissioning Of The Object, By Presenting Final Reports And Others, According To The Requirements Of The Zut; • Preparation Of A Technical Passport Of The Construction, According To The Requirements Of Ordinance No. 5/28.12.2006. The Technical Passport Is Handed Over To The Contracting Authority On Paper In 4 (Four) Copies, Each Of Which Is Accompanied By An Electronic Medium In Doc And Pdf Format , Corresponding To The Papers. The Electronic Copy Is Presented On A Cd Medium; • Prepares A Final Report To The Contracting Authority, According To The Requirements Of Zut, After Completion Of The Construction And Installation Works. The Report Is Submitted On Paper In 3 (Three) Copies, Each Of Which Is Accompanied By An Electronic Medium In Pdf And Doc Format, Corresponding To The Paper Ones. The Electronic Copy Of The Report Is Presented On A Cd Medium; • Controls The Quality Of The Performed Smrs And Prevents, With Its Competent Actions, The Violation Of Their Technological Consistency, By Issuing Prescriptions And Orders, Which It Enters In The Construction Order Book; • Attends All Meetings Between Participants In The Investment Process, Regardless Of Whose Request Or Work Schedule They Are Held, Each Time Reporting On The Main Activities (Types Of Works) Of The Construction, For Which Ongoing Construction Supervision Has Been Exercised Up To That Point, The Compiled Documents (Acts), As Well As For Problems That Have Arisen (If Any) And, Accordingly, The Necessary Measures To Solve Them; • Controls The Mandatory Execution Of The Construction Designers Orders, Entered In The Construction Order Book, Related To His Copyright And Does Not Allow Actions On The Part Of The Builder That Would Lead To Non-Compliance With The Agreed And Approved Investment Project Made By The Designer. • Makes Decisions To Stop And Start Construction, Agreed With The Contracting Authority • Prepares Written Findings, Which He Submits To The Contracting Authority, If There Is A Need For Changes In The Types Of Works On The Site, In Connection With Circumstances That Could Not Be Foreseen During The Process Of Design, But Necessarily Before These Changes Have Been Carried Out By The Builder. The Findings Include A Detailed Description Of The Reasons For And The Need For The Changes That Occurred, An Appendix To The Main Findings File Containing Photographic Evidence - Hard Copy Montage In Places
Key Value
Tender Value
40,000 - BGN
Tender Documents
Global Tender Document
1bd0cd73-54f6-4f42-9117-b67ec88457f9.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders