GTR 87913504
Tenders Are Invited For Construction Work For Swimming Pool – Siebentäler Therme Badewasser
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
87913504
Tendering Authority
Subscribe to view
Tender No
662052-2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work For Swimming Pool – Siebentäler Therme Badewasser
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
29-11-2024
Closed
Work Detail
Construction Work For Swimming Pool – Siebentäler Therme Badewasser. Measures In The 1St Construction Phase - New Outdoor Pool The Current Outdoor Pool Will Be Demolished And A New Pool Will Be Concreted In Its Place. In The First Construction Phase, The Outdoor Pool Will Be Temporarily Connected To The Pool Water Treatment System 1. Only In The Second Construction Phase Will The Outdoor Pool Receive A Separate Treatment Plant. Pool: The New Pool Will Be Concreted And Tiled. For The Pool Hydraulics, Appropriate Built-In Parts Are Built Into The Concrete Structure. Massage Jets, Neck Showers, Bubble Loungers And A Bubble Grotto Will Be Installed As Water Attractions. The Piping Takes Place In The Ground. Outdoor Pool (Ab) Water Area: 186 M² Pool Temperature: 30 - 32 °C Treatment: Provisional Connection To The Existing Circuit 1 Circulation Capacity: Ab 95 M³/H In The 2Nd Construction Phase (Approx. 2028), The Outdoor Pool Will Receive A Separate Treatment System (3 Stages With Ultrafiltration), However, This Is Not Part Of This Tender. The Pool Hydraulics And The Piping System Of The New Pool Are Already Dimensioned For The Future Treatment System. Processing: 3 Stages With Ultrafiltration, According To Din 19643-2 Circulation Capacity: 160 M³/H Water Feature And Attraction Systems The Outdoor Pool Will Have The Following Attraction Systems: - 4 Neck Showers - 15 Wall Massage Jets - 4 Neck Showers - 9 Bubble Loungers - 3 Floor Bubble Plates The Attraction Systems Are Completely Controlled Via A Freely Programmable Timer System. However, It Is Possible To Switch Or Switch Off All Attractions Manually Using The Swimming And Lifeguard Panels. For This Purpose, Suctions Are Provided In The Respective Pools, Through Which The Water Is Sucked In Via Attraction Pumps And Conveyed To The Attractions. Aerial Attractions Are Powered By Fans. The Air Is Sucked In In The Technical Rooms And Routed To The Attractions Via Air Loops. The Air Loops Are Guided Once Above The Water Level To Prevent The Pool Water From Pushing Back. For Cost Reasons, Each Attraction Does Not Have Its Own Pump Or Blower. Attraction Groups Are Formed, Which Are Switched One After The Other Via Automatic Flaps. Measures In The 1St Construction Phase - New Sauna Diving Pool. A New Sauna Diving Pool Is Being Built In The New Part Of The Sauna. This Basin Will Receive A Separate Treatment Plant. Circuit 5: Sauna Diving Pool (Stb) Water Area: 5 M² Pool Temperature: 15 - 18 °C Processing: 3 Stages, According To Din 19643-2 Circulation Capacity: 14 M³/H Pool: The Inserts For The Pool Hydraulics Are Concreted Into The New Diving Pool. The Pipes Are Laid In The Pool Structure. A Waterfall Is Arranged In The Diving Pool As An Attraction. Raw Water Tank (New): The New Raw Water Tank (Usable Capacity 6 M³) Is Made Of Plastic And Will Be Installed In The New Sauna Basement. Filter Container (New): A New One Is Also Available
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
05896d22-41b5-46e5-a592-33b7aa3cd281.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.