GTR 87872545
Tenders Are Invited For Expansion Of The Water Treatment Plant With The Necessary Accompanying Infrastructure In The Town Of Polańczyk
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
87872545
Tendering Authority
Subscribe to view
Tender No
WI.271.11.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Expansion Of The Water Treatment Plant With The Necessary Accompanying Infrastructure In The Town Of Polańczyk
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
15-11-2024
Closed
Work Detail
The Subject Of The Order Is The Performance Of Construction Works Entitled: Expansion Of The Water Treatment Plant With The Necessary Accompanying Infrastructure In The Town Of Polańczyk As A Partial Task Carried Out In A Separate Procedure As Part Of The Task Entitled: Construction Of The Water Supply Network In The Town Of Berezka-Wola Matiaszowa, Reconstruction Of The Water Supply Network In Bukowiec, Metering Of The Water Supply In Polańczyk And Expansion Of The Wwtp And Construction Of A Water Intake From Lake Solina. The Subject Of The Investment Is The Expansion Of The Building Of The Water Treatment Station In Polańczyk Along With The Accompanying Infrastructure: Expansion Of Treated Water Retention Tanks, Construction Of A Water Facility, I.E. A Floating Pontoon. Water Intake With Water Pipelines And Power Cable On Plots No.: 99, 98/21, 186/2. The Task Also Includes The Expansion Of Drinking Water Retention Reservoirs With A Two-Chamber Retention Reservoir With An Entrance Building And A Technical Building, As Well As The Reconstruction And Expansion Of Water Supply Networks With A Gate Valve Chamber, Stormwater Sewage And Electricity Networks On Plots No.: 120/1, 128/1, 128/3. Another Element Of The Investment Is The Installation Of Metering On The Existing Water Supply Network In The Polańczyk Spa. The Tasks Will Include, Among Others: - Expansion Of The Existing Suw Building With A New Facility, - Installation Of A New Technological Line In The Designed Part Of The Building, - Installation Of Automation Devices, Control Fittings - Measurement, Technological Monitoring In The Designed Part Of The Building, - Reconstruction Of Water And Sewage Pipelines, Electric Cables And Road Elements On The Suw Plot, - Expansion Of The Treated Water Retention Tanks On The Suw Plot With A New Tank, - Construction Of A Water Facility, I.E. A Floating Pontoon Raw Water Intake From The Solina Water Reservoir, - Construction Of A Raw Water Network And Cable Electricity Network From The Water Intake To The Suw Building, - Construction Of A Photovoltaic Installation, - Expansion Of The Existing Drinking Water Retention Tanks With A Two-Chamber Reinforced Concrete Treated Water Retention Tank With A Working Capacity Of Approx. 220 M3 Along With The Entrance Building And Technical Building, - Installation Of Devices And Fittings In The Technical Building, - Reconstruction And Expansion Of Water Pipelines With Gate Valves, Storm Sewage And Electricity. - Installation Of Metering On The Existing Water Supply Network. A Detailed Description Of The Subject Of The Order Is Included In Annex No. 3 To The Swz - Design Documentation And Technical Specification For The Execution And Acceptance Of Construction Works.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
025a59a6-9317-45cf-bb86-c62d5ea1c5c4.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.