GTR 86940375

Tenders Are Invited For Building Installation Work – Ms Gars_Msr

ICB — International Competitive Bid Closed Western Europe
Tender Information
GTR Reference
86940375
Tendering Authority
Subscribe to view
Tender No
607404-2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Building Installation Work – Ms Gars_Msr
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
08-11-2024 Closed
Work Detail
Building Installation Work – Ms Gars_Msr. ---1St Construction Phase Middle School Part 1 Nov 2024 - Create Cable List 1St Construction Phase Start Of W+M Planning 1St Ba July 2025 - Commissioning, Acceptance & Handover System 1. Ba 2Nd Construction Phase Gymnasium And Swimming Pool From March 2025 - Create Cable List 2 . Construction Phase Start W+M Planning 2Nd Ba January 2026 - Commissioning, Acceptance & Handover System 2Nd Ba 3Rd Construction Phase Middle School Part 2 From July 25 - Create Or Revise Cable List 3Rd Construction Phase Start W+M Planning 3Rd Ba May 2026 – Commissioning, Acceptance & Handover Of System 3. Ba Conversion And Renovation Measure Building Automation • Two Isps With 4 Fields Each (1800X800x500 + 200 Base) • Isp01 - Middle School • Isp02 - Sports Hall/Swimming Pool • Incl. Touch Control Panel And Local Priority Control Level In The Control Cabinet Door Isp01: • Approx. 260 Physical Data Points • Approx. 450 Communicative Data Points (Modbus, M-Bus) • Room Automation Via Modbus With Approx. 145 Participants (Room Operating Devices, Room Temperature Sensors, • Actuators, Compact Air Conditioning Units) Isp02: • Approx. 250 Physical Data Points • Approx. 350 Communicative Data Points (Modbus, M-Bus) • Connection Of Swimming Pool Technology Via Modbus • Room Automation Via Modbus With Approx. 100 Participants (Room Operating Devices, Room Temperature Sensors, • Actuators, Compact Rlt Devices) • The Cabling Is Carried Out By The Elt Trade, The Connection Work By The Trade • Building Automation! The New Building Control System Is Based On The Middle Schools Existing Control System. There Is Currently A Higher-Level Management Control Level (Mbe), Formerly Building Control Technology (Bms), For The Elementary School, Middle School, Sports Hall And Swimming Pool. Since The Building Renovation Is Being Implemented In A Total Of Three Construction Phases And The Elementary School Is Not Part Of This Measure, The Mbe Must Remain In Operation During The Construction Work. Furthermore, The Substation For The Gym And Swimming Pool (Construction Phase 2) Must Continue To Be Operated During The First Measure. The Control Technology Is Connected To The Existing Control Technology From Neuberger Prografnt. For Economic Reasons, There Is A Specification For Neuberger Pmc Automation Stations. This Product Specification Was Intensively Coordinated In Advance With The Bavarian Awarding Authority And, Due To The Economic And Business Reasons Explained, The Dependence On The Primary School (Which Is Not Part Of The Measure), And The Need To Maintain The Subsequent Facilities In Construction Phases 2 And 3, Be Advertised On A Product-Specific Basis. In Addition, Some Areas Were Already Renovated In 2007/2008 And Do Not Fall Under The Scope Of The Current Renovation Measure. Short Text---
Key Value
Tender Value
349,726 - EUR
Tender Documents
Global Tender Document
8422805b-432e-4bb0-a666-91d7ff13ab59.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders