GTR 86612080

Tenders Are Invited For Fve Administration And Fve Operation – Esko-T S.R.O.

ICB — International Competitive Bid Closed Eastern Europe
Tender Information
GTR Reference
86612080
Tendering Authority
Subscribe to view
Tender No
P24V00009873
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Fve Administration And Fve Operation – Esko-T S.R.O.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Eastern Europe
Political Region
European Union
Last Date of Bid Submission
06-11-2024 Closed
Work Detail
The Subject Of The Public Contract Is: Delivery Of A Complete Turnkey Photovoltaic Power Plant System (Hereinafter Also Pve). The Subject Of The Performance Is The Supply Of New, Unused Photovoltaic Power Plant Technology, Including Complete Assembly At The Place Of Implementation, I.E. On The Roofs Of Existing Buildings Parc.No.St. 7847 (Fve Administration), Parc. No. St. 5589 And Parc. No. St. 7281 (Fve Operation), Including A Battery System, A New Kiosk For Fve Operation Technology, All On The Premises Of Esko-T S.R.O., Hrotovická 232, 674 01 Třebíč. The Proposed Solution, According To The Attached Project Documentation, Is The Installation Of 86 Pv Panels With A Nominal Output Of 455 Wp And A Total Output Of 39,130 ​​Kwp, Including A Battery System With A Capacity Of 34.8 Kwh For The Administrative Building, I.E. Pve Administrativa, And The Installation Of 288 Pv Panels With A Nominal With A Power Of 455 Wp And A Total Power Of 131,040 Kwp Including A Battery System With A Capacity Of 34.8 Kwh For The Operation Building, I.E. Pve Operation. Photovoltaic Panels Will Be Installed At A 10° Slope On The Roof Sheathing And Will Be Attached To The Roof With A Structural System, Or Self-Supporting Aluminum Supporting Structures Will Be Used. The Above Solution Is Only A Suggestion. Due To Preservation Of Economic Competition, The Contractor Does Not Prescribe A Specific Technical Solution. It Is Completely Up To The Supplier What Solution He Proposes. However, The Output Of The Newly Installed Pve Must Be 39,130 ​​Kwp For Pve 1 With A Tolerance Of +-2% And The Corresponding Accumulation. The Client Requires That The Maximum Capacity Of The Battery Storage Is 34.8 Kwh With A Tolerance Of 0% - 2%, The Accumulation Capacity In Kwh Must Not Exceed The Installed Fve Power Expressed In Kwp. However, The Output Of The Newly Installed Pve Must Be 131,040 Kwp For Pve 2 With A Tolerance Of +-2% And The Corresponding Accumulation. The Client Requires That The Maximum Capacity Of The Battery Storage Is 34.8 Kwh With A Tolerance Of 0% - 2%, The Accumulation Capacity In Kwh Must Not Exceed The Installed Fve Power Expressed In Kwp. The Contracting Authority Does Not Prescribe A Specific Technical Solution, But Prescribes Minimum Requirements For The Subject Of The Contract. These Minimum Requirements Are Defined By Technical (Project Documentation), Commercial And Other Contractual Conditions, Which Are Part Of The Tender Documentation Annexes. The Subject Of The Contract Mainly Consists Of: A) Pv Panels With The Required Total Output Specified Above And Their Installation On The Roof Structure Of Buildings On The Premises Of The Company Esko-T S.R.O., Hrotovická 232, 674 01 Třebíč, The Pv System Will Include A Battery Storage With The Capacity Specified Above B) Complete Dc And Ac Wiring, Grounding And Lightning Protection, Surge Arresters, Network Protection, C) Connection To The Electrical Distribution, D) Dc/Ac Converters, E) Default Revision, F) Ensuring The Process Of Enabling Continuous Operation (Utp) According To The Requirements Of The Distributor And All Other Necessary Permits Connected With The Commissioning And Operation Of The Pv Plant, On The Basis Of Which The Final Operational Notice Is Issued, G) Supporting Structure Of Photovoltaic Panels, H) Testing Of Pv Plants And Training Of Pv Plant Operators At The Place Of Implementation, I) Remote Monitoring Equipment, See Appendix 5 Draft Service Contract Part Of The Subject Of The Performance Of The Vz Will Be Files Of Photo Documentation Taken On The Initial State, Course And Progress Of Individual Works. The Work Will Also Include The Provision Of All Other Necessary Permits Associated With The Commissioning And Operation Of The Pv Plant, The Processing Of A License For The Production Of Electricity. Energy (Erú), As Well As Documentation Of The Actual Execution Of The Construction Incl. Fire Safety Solution And Static Assessment And Other Documents Required For Approval Of The Work In Accordance With The Requirements Of Act No. 283/2021 Coll., Building Act The Subject Of The Contract Is Also The Suppliers Commitment To Perform Pv Service, While The Start Of Performance According To The Service Contract, Which Regulates The Commitment To Perform Pv Service, Will Begin On The Date Of The Final Operational Notice. Fulfillment According To The Service Contract Will Be Implemented From Its Start, As Defined Above, For A Period Of 10 Years. The Contracting Authority Points Out That If There Is Any Change To The Project Compared To The Project Documentation For The Building Permit (E.G. Different Pv Panels Than The Proposed Ones Will Be Used), The Provision Of Construction Changes Before Completion Is Also Part Of The Subject Of The Public Contract. The Public Contract Also Includes All Other Services, Supplies And Construction Work Related To The Subject Of The Public Contract Defined In This Procurement Documentation.
Key Value
Tender Value
6,600,000 - CZK
Tender Documents
Global Tender Document
85e6c5aa-205b-4a27-8fc9-892b576112e6.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders