GTR 86610258
Tenders Are Invited For New Brambauer Fire Station - Interior Plastering Work
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
86610258
Tendering Authority
Subscribe to view
Tender No
CXPSYYVDSAM
Financer Name
Self-Funded
Work Title
Tenders Are Invited For New Brambauer Fire Station - Interior Plastering Work
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
29-10-2024
Closed
Work Detail
The Contractor Always Prepares Uneven Walls For A Flawless Cleaning Job. All Projecting And Recessed Edges And Corners Must Be Aligned And Plumb. The Quality Levels Of The Plaster Surfaces In The Interior Area Must Be Carried Out In Accordance With Appendix B To Din V18550 And In Accordance With The Above Information Sheet From The Federal Association Of The Gypsum Industry E.V. The Required Quality Level Is Specified In The Individual Items. Unless There Is A Quality Level Is Specified, The Standard Level Q2 Applies. If Interior Wall Plasters Border Wooden Components (E.G. Purlins, Edge Timbers, Roof Boarding) Which Remain Visible And Should Not Be Plastered Over, These Wooden Components Must Be Protected From Contamination And The Plastered Surfaces Must Be Connected To These Components With A Clean Trowel Cut. The Loose Covering And Hanging Of Doors, Windows, Steel And Wooden Structures And Other Components, The Daily Washing Up And The Removal And Disposal Of Waste In Accordance With Atv Din 18299, Sections 4.1.11 And 4.1.12, Must Be Carried Out Immediately, At The Latest Daily, At The End Of The Respective Period Work To Be Done. This Is Covered As An Ancillary Service With The Standard Prices. Masking As A Protective Measure Is Carried Out In Accordance With A Separate Item. Any Construction Waste Must Be Disposed Of By The Contractor. Electrical Sockets And Slots All Electrical Sockets And Built-In Parts That Are To Be Exposed Later Must Be Marked Before Plastering. Installed Parts That Become Dirty With Mortar Must Be Cleaned Immediately. Closing Pipe Slots And Recesses Is Covered By The Standard Prices Unless Otherwise Stated. Plastering Window Sills Window Sills Must Be Plastered In Such A Way That Temperature-Related Changes In Length Cannot Cause Damage To The Plaster. Use Of Plaster Profiles Plaster Profiles Must Be Attached To All Openings, Corners, Projecting Edges, Etc. Of The External And Internal Plaster. Selection Of Rails And Profiles Rails And Profiles Such As Corner Protection Rails, End Rails, Expansion Joint Profiles, Edge Angles And Metal Edging Profiles Must Be Galvanized Or Corrosion-Resistant Depending On The Intended Use. Problematic Substrates All Places, Where Cracks In The Plaster Base Are Visible Or To Be Expected Must Be Inspected And Determined With The Client Before Work Begins. Covers And Protective Measures Windows, Window Frames, Doors, Door Linings, Door Frames, Door Frames, Glazing, Exposed Concrete Elements, Adjacent Components, Etc. Must Be Carefully Covered Before Work Begins. Scaffolding Required For The Work Must Be Included In The Ep And Will Not Be Paid For Separately. When The Plastering Work Is Accepted, The Cleaned Rooms Must Be Handed Over Swept Clean. Other Services That Must Be Included In The Standard Prices. , Dismantling, Provision Of Scaffolding: All Work, Surface And Protective Scaffolding Indoors, Including Work Platform Heights Over 2.00 M, As Well As Special Lifting Devices That Are Necessary For Carrying Out The Individual Services, Must Be Provided By The Contractor And Included In The Standard Prices. The Individual Working Heights Are Specified In The Main Positions. Unless Otherwise Described In The Service Positions, The Service Consists Of The Delivery And Professional Execution Of The Materials Described And Required In The Positions. Before Starting The Work, The Processor Must Ensure That The Structural Subsurface Or Advance Work Corresponds To The Requirements For His Trade. Possibly. Concerns Must Be Communicated To The Client In Writing Before Execution. Inspection Of The Plaster Base The Inspection Of The Plaster Base Must Be Carried Out In Accordance With Vob, Part C, Din 18350 As Part Of The Contractors Fulfillment Of The Inspection And Information Obligation. Hardening Times Unless Otherwise Described, The Minimum Service Times (Hardening Times) For Plaster Layers Must Be Adhered To According To The Manufacturers Specifications. Execution Of The Plaster Surfaces All Plaster Surfaces On Walls Must Be Carried Out In A Plumb And Aligned Manner Within The Permitted Tolerances In Construction/Building Construction In Accordance With Din Din 18202. Materials To Be Offered Materials Are To Be Offered In Accordance With The Qualities And Requirements Or Types Specified In The List Of Services. Regarding The Equivalence, Different Ones Vob Part A, Paragraph 13, No. 2 Applies To Technical Specifications.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
4030b572-5141-4875-9a1d-96e60e177c61.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.