GTR 86498145

Tenders Are Invited For Mechanical Engineering Installation Works – Renewal Of Compressor B50

ICB — International Competitive Bid Closed Western Europe
Tender Information
GTR Reference
86498145
Tendering Authority
Subscribe to view
Tender No
586752-2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Mechanical Engineering Installation Works – Renewal Of Compressor B50
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
04-11-2024 Closed
Work Detail
Mechanical Engineering Installation Works – Renewal Of Compressor B50. 1. Description Of The Initial Situation (Current State): The Nuremberg Urban Drainage And Environmental Analysis (Sun) Operates Sewage Treatment Plant 1 And Sewage Treatment Plant 2 To Treat The Resulting Wastewater. The 2-Stage Biological Purification Stage Of Sewage Treatment Plant 1 Consists Of A High-Load Aeration With Oxygen And A Conventionally Aerated Low-Load Aeration (Slb). Oxygen Is Introduced Into The Slb Via Membrane Aerators. The Aeration Of The Aeration Tanks 1 To 4 (Bb 1 To Bb 4) Is Carried Out Via 10 Turbo Compressors (Make Linde, Built In 1972). The 10 Compressors Are Connected To The Dn 900 Collecting Line, Which Leads To The Aeration Tanks Bb 1 To Bb 4, Via A Supply Line On Which The Start-Up Relief Is Also Mounted. A Butterfly Valve Is Installed At The Transition To The Manifold. The 10 Compressors Each Stand On A Concrete Foundation. The Supply Air Is Drawn In From An Intake Duct Under The Compressors In The Basement. The Compressors Are Also Equipped With Oil Cooling. 2. Description Of The Task (Target Condition): The Plan Is To Install 8 New, Energy-Efficient Compressors (Make Sulzer, Type Hst 30-58-8-300) In The Blower Station In The Area Where The Existing Existing Compressors (Linde Compressors) Are Parked. In Addition, The Respective Pipe Connection To The Existing Manifold And The Supply Air Ducts For The Compressors Must Be Replaced. The Interface For Connecting The Pressure Line To The Manifold Is The Dn 350 Butterfly Valve, Which Also Needs To Be Replaced. The Supply Air Interface For All Compressors Is The Intake Filter, Which Is Located In The Intake Duct On The First Basement Floor And Is Connected To The Compressors Via A Pipe Running Through The Ceiling. The Intake Filter And The Intake Silencer Installed In The Intake Pipe On The First Basement Floor Must Also Be Replaced. Furthermore, The Waste Heat From The Compressor Motor Is Dissipated To The Outside Via A Newly Constructed Exhaust Air Duct. 3. Schedule: The Compressors Must Be Replaced One After The Other So That The Biology Of The Wastewater Treatment Plant Must Always Remain In Operation. Accordingly, The Dismantling And Assembly Of The Compressors Is Carried Out In 4 Stages, So That Three Compressors Per Side Are Always Available To Operate The System During The Complete Renovation Phase (See General Schedule - Planned Construction Phase May 2025 To June 2026). 4. Offer Evaluation: The Offers Are Evaluated Based On The Lowest Offer. 5. References: When Submitting The Offer, The Bidder Must Name At Least 3 References With A Comparable Machine Size And Performance That Can Be Viewed.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
1823dbf1-597d-44d6-b8a9-bef93d571b79.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders