GTR 86086095
Tenders Are Invited For Reconstruction Of The Pedestrian Bridge Over The Railway Station And Rejtana Street In The Design And Build Mode
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
86086095
Tendering Authority
Subscribe to view
Tender No
MZD.ZP.26.1.70.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Of The Pedestrian Bridge Over The Railway Station And Rejtana Street In The Design And Build Mode
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
07-10-2024
Closed
Work Detail
The Subject Of The Order Is The Design And Reconstruction Of: - Footbridge Over The Railway Station, Ul. Rejtana And Ul. Bardowskiego;- Stairs Connecting Aleja Wojska Polskiego With Ul. Bardowskiego; - Slope Stairs (2 Pcs.) And A Sidewalk Located At The Northern Support Of The Viaduct Over The Railway Tracks Along Aleja Wojska Polskiego. Footbridge Over The Pkp Area, Ul. Rejtana And Ul. Bardowskiego: - Demolition Of The Load-Bearing Structure, Balustrades, Anti-Shock Covers, Gutters And Downpipes; - Abutments, Supports Unchanged Compared To Their Current State, Any Damage To The Supports Should Be Protected With Pcc Mortar; - Construction Of New Bearing Blocks Together With The Installation Of New Bearings; - Construction Of New Spans Of The Footbridges Supporting Structure; - Installation Of New Aluminum Balustrades And Anti-Shock Covers; - Construction Of An Epoxy-Polyurethane Resin Surface With A Minimum Thickness Of 5 Mm; - Applying Protective Coatings To The Support Surfaces; - Lighting The Footbridge, The Power Supply For The Lighting Circuit Will Be The Existing Lighting Circuits; - Drainage And Drainage Of Rainwater From The Bridge Slab To The Existing Rainwater Drainage System Under The Facility. Stairs Connecting Aleja Wojska Polskiego With Ul. Bardowskiego, Slope Stairs (2 Pcs) And A Located Walk At The Northern Support Of The Viaduct Over The Pkp Tracks During Wojska Polskiego Avenue: - Demolition Of Existing Handrails And Stairs; - Construction Of New Stairs; - Renovation Of The Existing Sidewalk With A Surface Of Paving Tiles. The Space Should Be Designed In Accordance With The Guidelines For The Design Of Public Space In Order To Eliminate Barriers Architectural (Including Make Equipment Elements For The Visually Impaired And Aluminum Guides For Strollers And Bicycles, As Well As Attention Areas Made Of Integrated Paving Stones). Staged Works: The Contractor Is Obliged To Carry Out Construction Works In Two Stages (Which Are To Enable Pedestrians To Use The Passage Under The Viaduct Along Wojska Avenue Polskiego): Stage I - Reconstruction Of The Footbridge With Slope Stairs At Ul. Bardowskiego; Stage Ii - Reconstruction Of The Sidewalk Under The Viaduct Along Aleja Wojska Polskiego Along With The Accompanying Slope Stairs. The Ordering Party Requires A Minimum Of 60 Months And A Maximum Of 96 Months Of Warranty And Guarantee For The Subject Of The Order.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
44ca9bc8-98de-4834-b635-d316abf217d9.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.