GTR 85829531

Tenders Are Invited For Architectural And Related Services – New Construction Of A 4-Group Daycare Center In The Pielweichs District In Plattling - Architect

ICB — International Competitive Bid Closed Western Europe
Tender Information
GTR Reference
85829531
Tendering Authority
Subscribe to view
Tender No
553252-2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Architectural And Related Services – New Construction Of A 4-Group Daycare Center In The Pielweichs District In Plattling - Architect
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
18-10-2024 Closed
Work Detail
Architectural And Related Services – New Construction Of A 4-Group Daycare Center In The Pielweichs District In Plattling - Architect. The City Of Plattling Intends To Build A Four-Group Kindergarten (3 Kindergarten Groups With A Crèche) In The Eastern Area Of ​​The Plattlinger Mühlbach On Steinfeldstrasse. The Result Of The Feasibility Study Commissioned For This Was Discussed At The Meeting On May 13, 2024 And The Preferred Solution Was Determined. All Variants Of The Attempted Solutions Presented In The Meeting Show An Exemplary Structure For The New Construction Of The Kindergarten Building. A Two-Story Building Was Presented That Would Adapt Well To The Existing Development Structure Of The Adjacent Residential Area. A Tailor-Made Architectural Concept Could Be Developed In Dialogue With The Client And The Educational Staff Available In Plattling. Architecture Should Complement Education And Provide Children With Creative Development Support. It Should Welcome The Children, Give Them Security And Help Promote The Development Of Their Personalities. The Aim Is To Create A Distinctive Place For Playing, Discovering, Running Around, Meditating, Learning, Eating And Sleeping. The Construction Of The Building Will Meet The Needs Of 3 Kindergarten Groups And 1 Group For A Daycare Center. At The City Council Meeting On May 13, 2024, The Property Was Named Flno. 2351 In The Plattling District Was Unanimously Determined As A Suitable Location. During The Realization, There Should Not Be Too Much Interference With Nature. There Are Trees In The Park-Like Area That Should Be Protected. The Aim Is To Preserve As Many Trees As Possible, As Large Trees Are Very Positive For The Kindergarten. Awnings And Umbrellas Are Not An Equivalent Replacement For Trees. The Building Should Fit Optimally Into The Existing Planting - To Achieve This, The Trees Should Be Recorded And Measured In Advance. It Is Important To Explore How A Structure Can Be Inserted Into The Area As A Scheme Without Interfering Too Much. First Of All, A Spatial Program Must Be Drawn Up Together With The Planners In Coordination With The Client And The Potential Sponsor. During Stage 1, The Economic Viability Of Different Variants/Construction Methods (Solid, Wooden Construction) Will Be Examined. The Cost Framework Is €4,053,465.00 Gross. Basically, In Performance Phase 3, The Planner Should Examine The Three Variants Presented At The City Council Meeting And Present Them To The City Council For Decision-Making. The Building Is To Be Connected To The Planned Heating Center On Steinfeldstrasse. The Measure Should Be Carried Out In One Section.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
77de8cf4-ea78-47fe-a259-6ff0b1bae0dc.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders