GTR 85653914
Tenders Are Invited For Modernization Of Lighting In The Będków Commune
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
85653914
Tendering Authority
Subscribe to view
Tender No
ZP.271.4.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Modernization Of Lighting In The Będków Commune
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
11-10-2024
Closed
Work Detail
The Subject Of The Order As Part Of The Investment Task Entitled: Modernization Of Lighting In The Będków Commune Is The Delivery Of Street Lighting Fixtures And Their Installation And Commissioning In The Będków Commune.4.2. Modernization Of Street Lighting In The Będków Commune Includes: A) Delivery Of Street Lighting Fixtures, 399 Led Fixtures In The Będków Commune. B) Replacement Of Existing Light Points Consisting Of Old-Type Street Lighting Fixtures (Sodium And Mercury Lamps) With Led Fixtures, Extension Arms That Are No Longer Suitable For Further Use, Clamps, And Protection Devices And Cables Powering The Fixtures Constituting An Integral Part Of The Light Point - 399 Pcs. In The Będków Commune In Accordance With The Energy Audit Of The Efficiency Of Street Lighting In The Będków Commune Constituting Annex No. 1 To The Swz And The Guidelines For The Installation Of Lighting Fixtures Constituting Annex No. 1A To The Swz. The Replaced Luminaires Must Meet The Requirements Of The Dark Sky Directive. The Contractor Will Be Obliged To Provide A Warranty For The Entire Fixture, Including Assembly And Elements Used For Assembly (Arms, Cables, Sockets, Clamps, Etc.). C) The Current Total Annual Electricity Consumption Resulting From The Audit For 399 Luminaires Is Approximately 165,000 Kwh. The Contractor Is Obliged To Provide Luminaires Selected In Such A Way That The Expected Electricity Consumption Will Decrease By At Least 55% In Relation To The Primary Consumption Calculated In Accordance With The Methodology Provided For In The Lighting Audit. Lighting Control, Power Supply Stations And Road Lighting Linese) Obtaining All Necessary Consents, Designs, Approvals And Arrangements Is The Responsibility Of The Contractor, As Well As Obtaining Subsequent Acceptance And Approvals. The Contractor Is Also Responsible For The Possible Dismantling Of Currently Installed Faulty Fixtures And Lines And Their Disposal. A Detailed Description Of The Subject Of The Order Is Set Out In Chapter 4 Of The Swz And The Contract Template - Annex No. 8 To The Swz
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
b099f831-1648-4f90-900b-4ac9625c41e3.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.