GTR 85340372

Quotation Are Invited For Hydrotest Preparation For Mfo Fuel Storage Tank

ICB — International Competitive Bid Closed Asia
Tender Information
GTR Reference
85340372
Tendering Authority
Subscribe to view
Tender No
2412401258
Financer Name
Self-Funded
Work Title
Quotation Are Invited For Hydrotest Preparation For Mfo Fuel Storage Tank
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
Last Date of Bid Submission
10-09-2024 Closed
Work Detail
Quotation are invited for Hydrotest preparation for MFO fuel storage tank 18,000M3. D-STATIONSCOPE OF WORK FOR HYDRO TEST PREPATORY WORKTANK- MFO-1ATANK CAPACITY # 18000 M3DIAMETER # 45.5 METERSHEIGHT # 12.5 METERSCO NTRACTOR#S SCOPE:##A HYDROSTATIC TEST (OR HYDROTEST) IS A WAY TO CHECK THE INTEGRITY OFA FUEL TANK BY FILLING IT WITH WATER AND PRES SURIZING IT TO DETECTLEAKS, DEFORMATIONS, OR WEAKNESSES.## THE CONTRACTOR MUST DO THE SITE VISIT TO UNDERSTAND THE SITECONDITION AND ACTUAL REQUIREMENT OF WATER FILLING AND ITS HYDRO TESTWITH REQUIRED NECESSARY EQUIPMENTS AND TOOLS.## AFTER SITE VISIT AND SITE DIS CUSSION, CONTRACTOR MUST SUBMIT ITCOMPETE ACTION PLAN WITH TOOLS AND EQUIPMENT#S WITH REQUIRED DURATIONFOR WATER FILLING AND WATER D RAINING.##THE CONTRACTOR MUST ARRANGE ALL NECESSARY SITE REQUIREMENTS FOR THEWATER FILLING AND DRAINING.EQUIPMENT#S NEEDED:# STORAG E CONTAINER AS PER SITE REQUIREMENT WITH CERTIFICATION## PRESSURE GAUGE & LEVEL GAUGES## PUMPS WITH SKID (CAPABLE OF REACHING THE RE QUIRED PRESSURE)## PRESSURE RELIEF VALVE (FOR SAFETY)## PIPING AND FITTINGS## SEALANT OR PLUGS TO SEAL TANK OPENINGS## HOSES, CLAMPS , BOLTS, GASKETS, SUPPORTS## ELECTRIC PANELS ETC.## SPARES PUMPS FOR INTERCHANGEABLE IF NOT WORKING## SAFETY GEAR (GOGGLES, GLOVES, ETC.)##AFTER HYDRO, FILLED WATER TO BE DRAINED AS PER THE DEWA MANAGEMENTAPPROVAL.PREPARATION AND PLANNING:##DOCUMENTATION REVIEW:## REVIEW TANK SPECIFICATIONS, DESIGN DOCUMENTS, AND ANY RELEVANT CODESOR STANDARDS (E.G., API, ASME).##PERMITS AND APPROVALS:##OBTAIN NECESSARY PERMITS AND APPROVALS FROM DEWASAFETY PLAN:##DEVELOP A SAFETY PLAN COVERING POTENTIAL HAZARD, EMERGENCYPROCEDURES, AND PER SONAL PROTECTIVE EQUIPMENT (PPE) REQUIREMENTS.TEST PLAN:##DETAIL THE TEST PARAMETERS, INCLUDING PRESSURE LEVELS, DURATION, ANDTHE ME DIUM TO BE USED (USUALLY WATER). PRE-TEST ACTIVITIES:INSPECTION:##CONDUCT A VISUAL INSPECTION OF THE TANK AND ASSOCIATED PIPING TOEN SURE THEY ARE IN GOOD CONDITION.CLEANING:##CLEAN THE TANK TO REMOVE ANY CONTAMINANTS OR RESIDUES THAT COULDAFFECT THE TEST RESULTS.P REPARATION:##ISOLATE THE TANK FROM OTHER SYSTEMS.##ENSURE THAT ALL CONNECTIONS, VALVES, AND FITTINGS ARE PROPERLYSECURED AND IN GOOD CONDITION.HYDROTEST ARRANGEMENT:EQUIPMENT SETUP:FILLING:##FILL THE TANK WITH WATER OR ANOTHER TEST MEDIUM, ENSURING IT IS FREEOF AI R POCKETS.##PRESSURE TESTING EQUIPMENT:##SET UP PRESSURE GAUGES, PUMPS, AND ANY OTHER REQUIRED TESTINGEQUIPMENT.TESTING:##GRADUALLY INCREASE THE PRESSURE TO THE SPECIFIED TEST LEVEL.##MONITOR THE PRESSURE GAUGES AND INSPECT THE TANK FOR LEAKS ORDEFORMATIONS.DURATI ON:##MAINTAIN THE TEST PRESSURE FOR THE REQUIRED DURATION, AS SPECIFIED INTHE TEST PLAN.POST-TEST ACTIVITIES:DRAINAGE:##SAFELY DRAIN THE TEST MEDIUM FROM THE TANK.INSPECTION AND DOCUMENTATION:##CONDUCT A FINAL INSPECTION TO ENSURE NO DAMAGE OCCURRED DURINGTESTING. ##DOCUMENT THE TEST RESULTS, INCLUDING PRESSURE READINGS AND ANYOBSERVED ISSUES.REPAIRS AND RE-TESTING:##IF ANY ISSUES WERE IDENTIFI ED, PERFORM NECESSARY REPAIRS AND RE-TESTAS REQUIRED.RESTORATION:##RESTORE THE TANK TO ITS OPERATIONAL STATE, INCLUDING RECONNECTING ITTO OTHER SYSTEMS. REPORTING AND CLOSEOUT:REPORT:##PREPARE A DETAILED REPORT OF THE TEST, INCLUDING RESULTS,OBSERVATIONS, AND ANY CORRECTIVE ACTIONS TAKEN.REVIEW:##REVIEW THE TEST RESULTS WITH RELEVANT STAKEHOLDERS AND ENSURE ALLDOCUMENTATION IS COMPLETE.CLOSEOU T:##FINALIZE ANY ADMINISTRATIVE TASKS AND FILE THE TEST DOCUMENTATION FORFUTURE REFERENCE. SAFETY CONSIDERATIONSTRAINING:##ENSURE AL L PERSONNEL INVOLVED ARE TRAINED AND FAMILIAR WITH HYDROTESTPROCEDURES AND SAFETY PROTOCOLS.EMERGENCY PREPAREDNESS:##HAVE AN EMERGEN CY RESPONSE PLAN IN PLACE, INCLUDING FIRST AID ANDSPILL RESPONSE MEASURES.##BY FOLLOWING THIS FRAMEWORK, YOU CAN ENSURE THAT THE HYD ROTEST ISCONDUCTED SYSTEMATICALLY, SAFELY, AND IN COMPLIANCE WITH APPLICABLESTANDARDS. Qty: 1 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2412401258)/$value
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
47a866d1-cd4f-40d9-8597-0f25c5384fd8.pdf
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders