Cremators – K2406/2 Procurement Of Pet Cremation Equipment. Ii.2.4) Description Of The Public Procurement: The Burial (Bti) Division Of Bkm Nonprofit Zrt. Plans To Expand Its Range Of Services With Pet Cremation. According To The Plans, The New Location Will Serve This Type Of Demand In 8-Hour Shifts 3 Days A Week During The Start-Up Period. The Bidders Task Is To Deliver The Three Pieces Of Equipment Included In The Technical Description To The Bidders Premises, Put Them Into Operation, Provide Training And Carry Out A Trial Run. The Requested Cremation Technology Equipment: 1 Pet Cremation Device 1 Bone Grinding Mill 1 Roller Cart The Pet Cremation Device Must Comply With Regulation 142/2011/Eu On Incinerators And Regulation 45/2012 On The Establishment Of Animal Health Rules For Animal By-Products Intended For Non-Human Consumption ( V. 8.) To Vm Decree. The Exact Description Of The Equipment To Be Delivered By The Bidder, The Technical And Equipment Requirements And The Tasks To Be Performed During The Delivery Can Be Found In The Technical Description, The Draft Contract, The 1/A. No. Annex (Offer Sheet) And 1/B. Included In The Annex (Professional Offer). Within 132 Days After The Entry Into Force Of The Contract, The Bidder Is Obliged To Deliver The Equipment To The Place Of Performance, Install It, Commission It, Conduct A Trial Run, Hold Training And Hand Over The Necessary Documentation To The Bidder. Bidder Accepts Prepayment. The Winning Bidder Is Not Entitled To Partial Performance. Method Of Execution: Delivery Of The Equipment: Within 100 Days After The Contract Enters Into Force. At The Same Time As The Delivery, The Winning Bidder Is Obliged To Hand Over All The Documentation Related To The Equipment. Installation And Commissioning: Within 10 Days Of Signing The Document Certifying The Delivery Of The Incinerator Equipment, The Winning Tenderer Must Complete The Installation And Commissioning Of The Equipment, And Then Report The Commissioning As Complete. Test Operation: A Test Operation Must Be Carried Out Within 3 Days After The Commissioning Is Reported Ready. The Test Run Lasts 1 Day. The Draft Contract, Which Is Part Of The Public Procurement Document, Contains The Detailed Rules In The Event That The Test Operation Has To Be Interrupted. Training: Within 10 Days After The Issuance Of The Successful Trial Operation Report, The Successful Tenderer Must Conduct A One-Time Operation Training At The Place Of Performance For Ak Employees (Minimum Of 2 People), For A Duration Of Approximately 4 Hours. A Record Of The Training Must Be Prepared. After Training, The Final Technical Handover Procedure Will Take Place Immediately. The Winning Bidder Undertakes A 12-Month Warranty For The Devices It Delivers, Starting From The Trial Run. The Following Separate, Partially Or Fully Integrated Documents Are Required For Receiving The Equipment: 1. Handling And Maintenance Instructions In Hungarian 2. Installation Instructions 3. Cleaning Instructions
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.