GTR 84910109
Tenders Are Invited For Gas Storage Services – Btu Brandenburgische Technibtu Cottbus-Senftenberg: Awarded The Development Of A Metallic Hydrogen Storage Facility
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
84910109
Tendering Authority
Subscribe to view
Tender No
514218-2024
Financer Name
European Union (EU)
Work Title
Tenders Are Invited For Gas Storage Services – Btu Brandenburgische Technibtu Cottbus-Senftenberg: Awarded The Development Of A Metallic Hydrogen Storage Facility
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
18-09-2024
Closed
Work Detail
Gas Storage Services – Btu Brandenburgische Technibtu Cottbus-Senftenberg: Awarded The Development Of A Metallic Hydrogen Storage Facility. The Research Project Plans To Develop Spherical High-Pressure Accumulators And Corresponding Material-Friendly Manufacturing Technologies. Two Variants Of The Tanks Are Considered. In The First Type, Hydrogen-Tight Metallic Liners Are Wrapped In A Load-Bearing Shell Made Of Carbon Fiber-Reinforced Plastic. The Department Is Conducting Comparative Studies On The Production Of This Sheathing Using Automated Laying Technologies, Here Automated Fiber Placement And Fiber Winding. Following An Extensive Screening Of Suitable Materials, Their Production Technology-Dependent Properties Are Determined. The Manufacturing Strategy Is Developed In A Parameter Study. A Particular Challenge Is The Implementation Of The Complex, Numerically Optimized Layer Structures. The Trial Operation Planned In The Network Is To Be Achieved By Developing A Mobile Solution In The Form Of A Tank Frame With Appropriate Connection Points That Meets The Requirements Of Logistics And End Users. The Second Tank Variant Is A Mass-Optimized Steel Tank. Due To Its Low Weight, This Should Be Suitable For Transporting Hydrogen By Rail And Road. The Metal Alloys Previously Used To Store This Gas Have Insufficient Strength. Therefore, A High-Strength Yet Tough Alloy Should Be Developed. Following The Design And Calculation Of The Tank, A Manufacturing Strategy Is Developed And Validated On Demonstrators.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
d983373b-68ac-424b-91be-aaff8977a2c0.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.