GTR 84869978
Tenders Are Invited For Switching Station Installation Work – Blb Nrw Ac/ Aachen/ Rwth / Spok / Msr_005-24-00715_I
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
84869978
Tendering Authority
Subscribe to view
Tender No
510980-2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Switching Station Installation Work – Blb Nrw Ac/ Aachen/ Rwth / Spok / Msr_005-24-00715_I
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
25-09-2024
Closed
Work Detail
Switching Station Installation Work – Blb Nrw Ac/ Aachen/ Rwth / Spok / Msr_005-24-00715_I. The Blb Nrw Intends To Build The New Königshügel Sports Hall On The Grounds Of The Rwth Aachen Campus. The Building Essentially Consists Of A Three-Field Sports Hall And 3 Attached Multifunctional Halls On The Upper Floor. On The Ground Floor There Are A Number Of Social And Ancillary Rooms As Well As Technical Rooms And Changing And Shower Areas. The Ventilation Technical Room Is Located On The 1St Floor. The Building Will Be Equipped With Extensive Ventilation Technology. In Addition To Pure Sports, The Three-Field Hall Also Serves As An Event Hall. The Ventilation System 1 Supplies The Three-Field Sports Hall The Ventilation System 2 Supplies The Multifunctional Halls The Ventilation System 3 Supplies The Sanitary And Social Rooms Structure Topology The System For Controlling And Regulating The Systems Installed In The Hall Is Carried Out Via Two Isps. These Isps Are Connected To Each Other Via A System Bus, So That Each System Can Be Operated From One Of These Isps. The Isps Are Located In The Technical Rooms On The Ground Floor And Upper Floor. In Addition, A Remote Touch Control Module Is Installed In The Back Office Room, On Which Different Functions Can Be Implemented With Different Access Rights. The Building Automation System To Be Offered Consists Of: - Autonomous, Freely Programmable And Communication-Capable Automation Devices For The Control, Regulation And Process-Related Optimization Of Operational Systems With A High Degree Of Hardware And Software Flexibility - Communication Interfaces And Facilities For The Exchange Of Information With Standardized Transmission Protocols - Facilities At The Control And Management Level For The Operation, Monitoring And Management Of All Directly And Remotely Connected Operational Systems. The Work On The Construction Site Begins 12 Working Days After The Clients Request (§ 5 Paragraph 2 Sentence 2 Vob/B). The Request To Start Work On The Construction Site Will Probably Be Sent To You By January 13, 2025. Regardless Of When Work Begins On The Construction Site, The Factory And Assembly Planning Must Be Submitted To The Construction Management For Review And Approval 4 Weeks After The Order Was Awarded. The Service Must Be Completed (Ready For Acceptance) Within 86 Working Days After The Above-Mentioned Deadline For The Start Of Implementation.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
5f1fcc1c-aa62-40c9-b292-82f6f72ac6b0.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.