GTR 84095122

Bids Are Invited For Rabun County Wsa Package Water Treatment System Replacement

ICB — International Competitive Bid Closed Northern America
Tender Information
GTR Reference
84095122
Tendering Authority
Subscribe to view
Tender No
PE-98850-NONST-2025-000000006
Financer Name
Self-Funded
Work Title
Bids Are Invited For Rabun County Wsa Package Water Treatment System Replacement
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Northern America
Political Region
Asia-Pacific Economic Cooperation, APEC,APAC (Asia Pacific)
Last Date of Bid Submission
08-10-2024 Closed
Work Detail
Advertisement For Bids: Package Water Treatment System Replacementlake Rabun Water Treatment Plant Rabun County Water And Sewer Authoritysealed Bids Will Be Received By The Rabun County Water And Sewer Authority, Georgia For Furnishing Materials, Labor, Tools, Equipment, And Any Other Miscellaneous Items Necessary For The Construction Of Package Water Treatment System Replacement- Lake Rabun Water Treatment Plant.Bids Will Be Received At Rabun County Water And Sewer Authority, 137 Hiawassee Street, Clayton, Ga 30525 Until 1:00 P.M. On October 8, 2024. Any Bid Received After Said Time And Date Of Bid Opening Will Not Be Considered By Owner. The Project Consists Of, But Is Not Limited To The Following Major Elements: Enhancements To Existing 2.0 Mgd Water Treatment Facility. Major Components Include Restoration Of 2 Each 1.0 Mgd Package Filter Units And Associated Controls With New Filter Media And Associated Internal Components Of Each Filter Unit. Each Filter Unit Will Be Converted From A Roberts System To A Trident System, Manufactured By Westech Engineering, Inc.. All Controls Shall Be Upgraded As Well. And Existing Blowers Shall Be Replaced As Well With New Air Piping. Work Also Includes Repairing Any Interior Coating Failures In Each Filter. Note: The Filter Equipment Package By Westech Engineering, Inc For The 2 Each 1.0 Mgd Package Filter Units Shall Be Furnished By The Authority And Is Already In Storage At A Facility Near The Water Treatment Plant Site. Time Of Completion For All Work Associated With This Project Shall Be Ninety (90) Consecutive Calendar Days To Achieve Substantial Completion And 150 Consecutive Calendar Days To Achieve Final Completion. It Is The Intention Of The Authority That The Contractor Begin Work And Have Initial, Necessary Work Completed To Be Prepared To Take The First Filter Off-Line For Upgrades In Early Jan. 2025For Documents Regarding This Project Contact Russ Brink At 770-361-6090 [email protected]
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
88fe1aeb-a101-458f-8a7b-43b3b07ebb53.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders