GTR 83584285

Tenders Are Invited For Plant Engineering Design Services – Planning Services For The Renewal Of The Hkw Sandreuth Saturated Steam Boiler Plant In Nuremberg

ICB — International Competitive Bid Closed Western Europe
Tender Information
GTR Reference
83584285
Tendering Authority
Subscribe to view
Tender No
449234-2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Plant Engineering Design Services – Planning Services For The Renewal Of The Hkw Sandreuth Saturated Steam Boiler Plant In Nuremberg
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
26-08-2024 Closed
Work Detail
Plant Engineering Design Services – Planning Services For The Renewal Of The Hkw Sandreuth Saturated Steam Boiler Plant In Nuremberg. The Saturated Steam Boiler System Is An Integrated Part Of The Hkw Sandreuth And Is Located At The Hkw Sandreuth Site In Nuremberg. There Are Extensive And Complex Systems At The Hkw Sandreuth Site. The Operation Of The Systems Always Has Priority. The Systems Belong To The Critical Infrastructures (Kritis). 1 Main Technical Data Of The Existing Saturated Steam Boilers 1 And 2: Number Of Units 2; Fuel (Used Primarily): Natural Gas Group E Or H-Gas Fuel (Used Secondary): El Heating Oil; Thermal Output Per Boiler 18.75 Mw; Steam Output Per Boiler 25 T/;, Design: Two-Flame Tube Smoke Tube Boiler; Working Pressure Po 11 ... 12 Bar (G). 2 Preliminary Main Technical Data Of The New Saturated Steam Boilers 1 And 2: Number Of Units 2, Energy Source For Steam Generation: Natural Gas Group E Or H Gas (80 ... 100 Vol%) With Admixture Of Hydrogen (0 ... 20 Vol%) , Heating Oil El, Liquid Synthetic Climate-Neutral Fuel, Comparable In Its Combustion Properties To Heating Oil El, Possible Other Energy Sources At The Suggestion Of The Contractor; Thermal Output Per Boiler 18.75 Mw; Steam Output Per Boiler Approx. 25 T/H; Type: Two-Flame Tube Smoke Tube Boiler; Working Pressure Po 11 ... 12 Bar (G). 3. Optimal System Design: The Optimal System Design, Taking Into Account The General Conditions, Must Be Determined By The Contractor. Scope Of Services: The Contractor Must Provide All Planning Services Required For The Turnkey Renewal Of The Saturated Steam Boiler System At The Sandreuth Hkw. Due To The Turnkey Design And Complexity Of Replacing The Saturated Steam Boiler System, All Hoai Service Models Must Generally Be Applied. The Following Description Of The Contractors Scope Of Services Is Based On The Technical Equipment Service Profile. At This Point, Other Possible Service Profiles Of The Hoai Should Be Mentioned Without Claiming To Be Complete: Property Planning, Buildings And Interiors, Open Spaces, Engineering Structures, Traffic Systems, Structural Planning, Specialist Planning. The Contractors Scope Of Services Includes The Required Basic Services As Well As Selected Special Services For Each Service Profile. Dates: Start Of Planning From December 2024. Framework Dates For Construction: Non-Availability Of The Saturated Steam Boiler System: Start March 16, 2026, End (At The Latest) October 16, 2026, Duration (Maximum) Weeks 31. Formal Acceptance Of The Turnkey Renewal Of The Saturated Steam Boiler System (At The Latest) December 11. 2026.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
25c02372-8e06-49bd-b353-4df2153e7ec9.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders