GTR 82543897
Tenders Are Invited For Repair Of Compressed Air Stations With Eko 75 Compressors
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
82543897
Tendering Authority
Subscribe to view
Tender No
ZP5/2024/PBN/BLZ
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Repair Of Compressed Air Stations With Eko 75 Compressors
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
12-07-2024
Closed
Work Detail
The Subject Of The Order Is: 1) Repair Of 1 Piece Of The Eko 75 Compressor, Including: A) Repair Of The Screw Block, B) Replacement Of The Drive Belt, C) Replacement Of High-Pressure Pneumatic Hoses, D) Replacement Of Oil And Oil Filter, E ) Replacement Of The Temperature Sensor, F) Replacement Of The Air Filter, G) Replacement Of The Mats, H) Replacement Of The O-Ring, I) Replacement Of The Network Pressure Sensor, J) Replacement Of The Vent Solenoid Valves, K) Replacement Of The Suction Regulator, L) Replacement Of The Cyclone Solenoid Valve, M ) Replacement Of Contactors Of The Star-Delta System, N) Replacement Of The Main Engine Thermal, O) Replacement Of The Fan Thermal; 2) Installation Of A Cyclone Separator With An Automatic Condensate Drain In Front Of The Adsorption Dryer. 3) Replacement Of The Cold Regenerated Adsorption Dryer With A New Hot Regenerated Adsorption Dryer With An Inlet Flow Rate Of Min. 540 M3/H. Pressure Dew Point Temperature From – 25O C To 70O C Depending On The Version. Working Pressure Min. 8 Bar, Maximum Working Pressure Min. 11 Bar. Installed Power: Heater Max 4.6 Kw, Vacuum Pump Max 1.5 Kw. Tanks And Supporting Structure Protected Against Corrosion. Fully Automatic Dehumidifier, Designed For Continuous Operation, Equipped With A Pre-Filter, Post-Filter, Dew Point Control, Thermal Insulation Of The Tank Jacket. Regeneration Using A Vacuum Pump Without The Loss Of Compressed Air For Regeneration. Two-Layer Filling Of Two Silica Gel Sorbents Ws And N. Sorbent Produced By Basf. Sieve Supporting The Sorbent Made Of Stainless Steel Min. 304. 4/2-Way Pneumatic Ball Valves, Connected By A Joint Shaft. Microprocessor Controller Equipped With A Color Display Min. 5.5. Information About The Operation Of The Dehumidifier Must Be Displayed On The Screen In Graphical Form (Flow Diagram) Along With Text Messages. All Work Data Must Be Read At Least Every Minute With Saving In The Controller Memory (Data Archiving For At Least 2 Months). It Is Required To Be Able To Copy Data To A Regular Usb Memory Stick. Ip65 Protection Class. Wince 5.0.4 Operating System Required) Installation Of A Dry Air Tank With A Capacity Of Min. 2000 L Equipped With The Necessary Fittings With A Safety Valve, Working Pressure Min. 10 Bar.5) Replacement Of Complete Automatic Condensate Drains For The Wet Air Tank And 3 Filters.6) Tanks And Supporting Structures Protected Against Corrosion - Surface Cleanliness Class Min. Sa 2.5.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
a5171d3c-5f9f-4097-8365-6a60c6ab1e1a.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.