GTR 81933031

Tenders Are Invited For Construction Of A New Multi-Purpose Sports Field With A Replacement Playing Field Of 20M X 40M Along With A Roof With A Permanent Structure

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
81933031
Tendering Authority
Subscribe to view
Tender No
IZ.271.1.3.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of A New Multi-Purpose Sports Field With A Replacement Playing Field Of 20M X 40M Along With A Roof With A Permanent Structure
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
12-07-2024 Closed
Work Detail
1. The Subject Of The Order Is The Preparation Of Design Documentation And Construction Works As Part Of The Investment Task Construction Of A New Multi-Purpose Sports Field With Replacement Playing Field 20M X 40M With A Roof Of A Permanent Structure In The Design And Build System.2. The Task Is Co-Financed From The State Budget Under The Olympia Program - A Program For The Construction Of School Sports Halls For The 100Th Anniversary Of The First Participation Of The Polish Team At The Olympic Games. 3. The Investment Implementation Must Be Consistent With The Assumptions Of The Competition Olympia Program - Program For The Construction Of School Sports Halls, Available At The Link Https://Www.Gov.Pl/Web/Sport/Program-Olimpia--Program-Budowy-Przyszkolnych-Hal -Sports 4. In Accordance With The Functional And Utility Program, The Implementation Of The Order Includes: 1) Development Of Design Documentation, Obtaining Appropriate Decisions, Arrangements, Opinions, Preparation Of Technical Specifications For The Execution And Acceptance Of Construction Works, Cost Estimates For Bills Of Quantities Of Works And Other Documents And Studies Necessary To Implement The Intention Along With Obtaining Appropriate Decisions (Including Building Permits). The Developed Documentation Must Be Preceded By The Preparation Of A Concept Based On The Ordering Partys Guidelines (Pfu) And Obtaining A Positive Opinion From The Ordering Party. All Costs Resulting From The Obtained Opinions And Arrangements Are Borne By The Contractor.2) Execution Of Construction Works Based On The Design Documentation Prepared By The Contractor Together With Obtaining An Occupancy Permit Decision, Including: A) Construction Of An Arched Hall Made Of Glued Wood With Membrane Covering And Social And Cloakroom Facilities And Installations, And A Gas Tank B) Construction Multi-Purpose Sports Field With The Following Fields: - Volleyball Court - Full Size 9.00 X 18.00 M - Tennis Court - Full Size 10.97 X 23.78 M - Basketball Court - Full Size 15.00 X 28.00 M - Handball Pitch - Full Size 20.00 X 40.00 Mc) Sports Equipment And Ball Catchersd) Land Development, Surface Under The Stands And Access) Stationary Stands And Gymnastic Benchesf) Laser Shooting Rangeg) Stage With Carpet Protective Covering For A Multi-Purpose Sports Field) Information Boardi) Obtaining An Occupancy Permit Or Submitting A Notification Of Works3) The Scope Of The Order Also Includes, If Necessary, The Exercise Of Authors Supervision To The Extent Specified In The Act Of July 7, 1994, Construction Law. (Consolidated Text: Journal Of Laws Of 2023, Item 682, As Amended)
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
e6c3282a-06f1-4783-bdb0-ee3b5f51f16f.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders