GTR 81736423

Tenders Are Invited For Construction And Modernization Of Cultural And Sports Infrastructure In The Ułęż Commune

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
81736423
Tendering Authority
Subscribe to view
Tender No
ZP.271.7.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction And Modernization Of Cultural And Sports Infrastructure In The Ułęż Commune
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
02-07-2024 Closed
Work Detail
The Subject Of The Order Is The Implementation Of An Investment Task Titled: Construction And Modernization Of Cultural And Sports Infrastructure In The Ułęż Commune. The Investment Is Covered By Co-Financing From The Polish Government Fund: Strategic Investment Program. The Subject Of The Investment Includes The Implementation Of 3 Tasks1) Task No. 1: Construction Of A Stage For Entertainment And A Multi-Purpose Square Along With Development Of The Area Around: Stage Omax. External Dimensions: 9.0 M X 13.6 M. L-Shaped Retaining Wall, Length: 13.1 M + 14.0 M. The Smallest Distance Of The External Stage From The Existing Gok Building (Municipal Cultural Center) Is 13.6 M. The Smallest Distance Of The Retaining Wall From The Border With The Neighboring Building Plot Is 19.3 M. The Multi-Functional Square With Dimensions: 13.0 M X 30.0 M Was Designed In The Western Part Of Plot No. 285/2. The Smallest Square Distance Of The Existing Gok (Municipal Cultural Center) Building Is 15.9 M.2) Task No. 2: Construction Of Sanitary And Locker Room Facilities For Athletes At The Municipal Sports Facility In Ułęż At The General Education School Complex In Sobieszyn: A) Construction Industry: - Foundation Strips Reinforced Concrete Cast On A Lean Concrete Base, - Foundation Walls Made Of Concrete Blocks With Cement Mortar, - Load-Bearing Walls Made Of Aerated Concrete Blocks. 24 Cm On Cement And Lime Mortar, - Insulation Of External Walls With Styrofoam Thickness. 18 Cm, - Monolithic Reinforced Concrete Pins, - Lintels Made Of Prefabricated L-19 Beams, - Monolithic Reinforced Concrete Ring Beams, - Partition Walls Made Of Aerated Concrete Blocks, Thickness. 6 And 12 Cm On Cement And Lime Mortar, - Monolithic Ceiling Thickness. 18 Cm, - Wooden Roof Structure, Covered With Metal Tiles, - Gutters And Downpipes Made Of Coated Steel Elements, - Internal Cement-Lime Plasters Painted With Acrylic And Ceramic Paints, Tiles In Sanitary Rooms, - Poured Concrete Floors Reinforced With Steel Mesh, Floor Finishing With Stoneware Tiles ,- Window Joinery Made Of Pvc Profiles, Internal Doors Made Of Hpl-Naminated, External Doors Made Of Aluminum Profiles. B) Electrical Industry: - Lighting Installation, - Power Supply Installation, - Installation Of Plug Sockets, - Installation Of Equipotential Bonding, - Anti-Shock And Overvoltage Installation, - Installation Photovoltaic, C) Sanitary Industry: - Water Supply System Made Of Polypropylene Pipes, - Domestic Hot Water From Instantaneous Heaters And Electric Boilers, - Power Supply Via W.D. 40 Mm. - Sewage System Made Of Polyethylene Pipes, - Sewage Disposal To A Septic Tank With A Capacity Of 10 M3.3) Task No. 3: Reconstruction And Thermal Modernization Of The Volunteer Fire Department In Sarny: The Scope Of Works Includes The Construction Of A Suspended Ceiling Made Of Waterproof Plasterboards For The Entire Building, And Walls Made Of Plasterboard Mounted On A Steel Structure. Construction Of A Partition Wall In The Kitchen. Carving Out A New Door Opening And Bricking It In The Wall Of The Hall. Construction Of A Technical Floor In The Attic With Thick Osb Boards. 18Mm. Enabling Passage. Installation Of Wooden And Metal Door Frames And Interior Doors. Installation Of Internal Window Sills. Replacement Of The Electrical Installation With The Switchgear And Installation Of Led Fixtures And Sockets. Installation Of An Attic Hatch In The Garage. Insulating The Ceiling With Mineral Wool, Painting Internal Walls And Ceilings, Laying Stoneware Tiles With A Plinth. Laying The Cubes At The Back Of The Building. Cubes, Investors Material. The Order Should Be Made In Particular In Accordance With The Design Documentation, Technical Specification For The Execution And Acceptance Of Construction Works Constituting Annex No. 12 To The Swz, Taking Into Account The Provisions Of The Swz And The Contract (Annex No. 10 To The Swz).
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
cc7386a2-8c85-413a-8b71-35606593bc75.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders