GTR 81736276
Tenders Are Invited For Supervision Of Post-Consolidation Development Works Within The Scope Of The Project Entitled Consolidation Of Land Located In The Area Of The Village Of Boratyn, Chłopice Commune Under The Rural Development Program For 2014-2020
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
81736276
Tendering Authority
Subscribe to view
Tender No
ZP.272.18.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Supervision Of Post-Consolidation Development Works Within The Scope Of The Project Entitled Consolidation Of Land Located In The Area Of The Village Of Boratyn, Chłopice Commune Under The Rural Development Program For 2014-2020
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
25-06-2024
Closed
Work Detail
1. The Subject Of The Contract Are Services Consisting In Performing The Duties Of A Construction Supervision Inspector As Part Of Investor Supervision Within The Meaning Of The Act Of July 7, 1994, Construction Law (Consolidated Text: Journal Of Laws Of 2024, Item 725) Over Construction Works Performed In As Part Of Post-Consolidation Development Works In The Scope Covered By The Project Entitled Consolidation Of Land Located In The Area Of The Village Of Boratyn, Chłopice Commune Under The Rural Development Program For 2014-2020.2. Construction Works Subject To Supervision Under This Order Include: 1) Construction And Reconstruction Of Post-Consolidation Roads (Agricultural Transport) 2) Construction Of Culverts Under Roads With Reinforcements Of Inlets And Exits To Plots; 3) Construction, Renovation And Correction Of Water Drainage Facilities, I.E. Drainage Ditches And Drainage And Water Drainage Systems, As Well As Improvement Of Their Technical Parameters; 4) Land Reclamation, Including The Removal Of High And Unnecessary Margins, Slopes And Fallow Land, Ravines And Old Roads By Fertilizing Soil, Plowing And Harrowing, Anti-Erosion Protection And Removal Trees And Bushes; 5) Other Works, Including: Reconstruction Of A Metal Wire Mesh Fence On Concrete Or Metal Posts, Construction Of An Inspection Well, Bringing In Soil And Strengthening The Slope, Leveling The Plot/Removal Of The Old Ditch, Clearing/Leveling The Area, Correcting The Course Of The Slope Along With With Its Strengthening.3. Subject A Detailed Description Of The Subject Of The Order, I.E. The Scope Of Construction Works Subject To Supervision Under This Order Is Specified In The Design And Technical Documentation, Constituting Annex No. 1 To The Swz, Which Includes: 1) Construction Design: Reconstruction Of Roads, Construction Of Ditches And Recultivation As Part Of The Task: Post-Consolidation Development Of Land In The Area Of The Village Of Boratyn, Chłopice Commune, In The Scope Of The Project Regarding Land Consolidation Under The Rural Development Program For 2014-2020: A) Land Development Design, B) Architectural And Construction Design, C) Technical Design; 2) Detailed Design Reconstruction Of Roads , Construction Of Ditches And Recultivation As Part Of The Task: Post-Consolidation Development Of Land In The Area Of The Village Of Boratyn, Chłopice Commune, In The Scope Of The Project On Consolidation Of Land Under The Rural Development Program For 2014-2020;3) Decisions, Opinions, Arrangements, Technical Conditions;4) Maps ;5) Geotechnical Documentation;6) Bioz;7) Bills Of Quantities Prepared For Individual Industries/Works.8) Technical Specifications For The Execution And Acceptance Of Construction Works.4. The Ordering Party Informs That The Terms Of Reference Along With Annexes And Other Documents Regarding The Contract Award Procedure For The Performance Of Construction Works Subject To Supervision, Reference Number Zp.272.14.2024, Are Available On The Website Https://Platformazakupowa.Pl/Transakcja/924890. 5. The Contractor / Supervision Inspector Will Be Obliged To: 1) Represent The Ordering Party On The Construction Site By Controlling The Compliance Of The Works With The Design And Technical Documentation, The Contract Concluded With The Contractor, Occupational Health And Safety Regulations, Applicable Technical Standards And The Principles Of Technical Knowledge And Construction Practice;2 ) Checking The Quality Of Performed Works And Built-In Products, And In Particular Preventing The Use Of Defective And Unauthorized Products And Their Use In The Construction Of Post-Consolidation Roads; 3) Checking And Accepting All Construction Works On Behalf Of The Ordering Party, Including Those That Are Covered Or Disappearing, Participating In And Accepting Completed Structures And Putting Them Into Use; 4) Participating In Committees, Meetings And Construction Meetings Regarding The Implementation Of The Investment In Question; 5) Keeping Photographic Documentation Of The Investment (State Before, During And After The Implementation Of A Given Element Of The Task), In Particular Works That Are Covered (E.G. Subgrade Or Road Substructure), Performed Incorrectly Or With Delay;6) Submitting Monthly Reports On The Progress Of Construction Works Subject To Supervision Under The Contract, Together With Photographic Documentation, By The 10Th Day Of The Month Following The Month For Which The Contractor Is Obliged To Submit A Report To The Ordering Party;7) Correct Checking And Confirmation Of Actually Performed Works, Removal Of Defects And Control Of Construction Settlements, Approval For Payment Of Bills And Invoices Submitted By The Contractor Of Construction Works; 8) Complete The Final Acceptance Of Construction Works Subject To Supervision Under This Order Within The Time Specified In The Contract With The Construction Contractor, And Also Check And Prepare An Appropriate Report And Submit It To The Ordering Party; 9) Complete And Present To The Ordering Party Documents Allowing For The Assessment Of The Correct Execution Of The Subject Of Acceptance, And In In Particular, Providing: A) Construction Log, B) As-Built Documentation, C) Technical, Partial And Inter-Operation Protocols, D) Test Protocols, E) Guarantees, F) Technical Approvals, G) Quality Approvals And Certificates, H) Declaration Of Performance And Compliance With Pn,I) Technical Documentation With Changes Made During The Execution Of The Subject Of The Contract, If Any; 10) Checking And Accepting, On Behalf Of The Ordering Party, Replacement And Additional Design And Construction Documentation Prepared In The Event Of Additional Works Not Covered By The Basic Design; 11) Participating In Post-Acceptance Defect Commissions And Inspections During The Warranty And Guarantee Period;12) Final Settlement Of Construction Works, Subject To Supervision Under The Subject Order, With The Participation Of The Construction Works Contractor.6. The Contractor Will Be Obliged To Perform The Subject Of The Order In Accordance With Applicable Law, The Provisions Of The Swz, The Provisions Of Its Own Offer And The Conditions Specified In Detail In The Provisions Of The Draft Agreement, Constituting Annex No. 7 To The Swz.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
7859567d-7e0b-4c6b-8f8f-60e8662ba22d.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.