GTR 81648265
Tenders Are Invited For Renovation Of The Boiler Room And Bathroom In The Building Of The Village Community Center In Stróża Along With Drying The Eastern Wall In The Building Of The Village Community Center In Stróża
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
81648265
Tendering Authority
Subscribe to view
Tender No
RO.271.5.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Renovation Of The Boiler Room And Bathroom In The Building Of The Village Community Center In Stróża Along With Drying The Eastern Wall In The Building Of The Village Community Center In Stróża
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
02-07-2024
Closed
Work Detail
Part No. 1 (Task No. 1) Renovation Of The Boiler Room And Bathroom In The Building Of The Village Community Center In Stróża. A) As Part Of The Building Elements: - Dismantling The Existing Door, Marked Rd1; - Dismantling 2 X Toilet Bowls, 1 X Washbasin In Room 0/4; - Demolition Of Partition Walls In Room 0/4; - Dismantling Floor Tiles In Room 0/4 ;- Stripping Tiles On The Walls In Room 0/4;- Scraping And Washing Off Old Paint On The Ceilings In Rooms 0/1, 0/2, 0/3, 0/4;- Scraping And Washing Old Paint On The Walls In Room 0/ 1, 0/2, 0/3;- Dismantling The Plinth In Rooms 0/1, 0/3;- Chipping Away The Plaster In Rooms 0/1, 0/3;- Chipping Off Loose Plaster On The Walls In Rooms 0/7, 0/ 8;- Chipping Off Loose Plaster On The Ceilings In Rooms 0/7, 0/8;- Digging Grooves In The Floor In Room 0/7;- Dismantling The Cast-Iron Sewage System Under The Floor In Room 0/7;- Dismantling The Risers Of The Cast-Iron Sewage System In Room 0 /7;- Installation Of Internal Doors 80X200cm Marked D1;- Repair And Filling Of Gaps In The Cement Floor In The Room. 0/2, 0/4, 0/7, 0/8;- Priming The Cement Floor In Rooms 0/2, 0/4, 0/7, 0/8;- Priming The Walls In The Room. 0/1, 0/2, 0/3, 0/4, 0/7, 0/8; - Priming Ceilings In Rooms. 0/1, 0/2, 0/3, 0/4, 0/7, 0/8;- Installation Of Vertical Waterproofing In Rooms 0/1, 0/3;- Plastering Of Walls With Cement-Lime Plaster. In The Room 0/1, 0/3, 0/7, 0/8;- Plastering Ceilings With Plaster. – Vape. In Rooms 0/7, 0/8; - Laying Floor Tiles With Glue In Rooms 0/4; - Laying Ceramic Tiles On The Walls In Room 0/4;-Painting The Ceilings With Emulsion Paints Twice In Rooms 0/1, 0/2, 0/3, 0/4, 0/7, 0/8;-Painting The Walls With Emulsion Paints Twice In Rooms 0/1, 0/ 2, 0/3, 0/7, 0/8; - Construction Of A Floor Plinth Made Of Tiles With A Minimum Height Of 10 Cm In The Room. 0/1, 0/2, 0/3; - Construction Of Pvc 160 Sewage System Under The Floor With A Sewage Grate In Room 0/7; - Construction Of Risers For Pvc 160 Sewage System In Room 0/7; - Laying Of Construction Foil Thickness 0.3Mm In Rooms 0/7, 0/8; - Laying Eps 100 Polystyrene On The Floor. 5Cm In Rooms 0/7, 0/8; - Making Cement Screed, Thickness. 5Cm In Rooms 0/7, 0/8; - Installation Of Sliding Doors Made Of Mdf Boards In The Room. 0/1; B) As Part Of Electrical Elements: - Construction Of Switchboards And Their Power Supply; - Construction Of General And Emergency Lighting In The Renovated Rooms; - Construction Of Socket Installations And Installations Supplying Individual Receivers; - Construction Of Equipotential Bonding Installations; - Implementation Of Surge Protection; - Implementation Of Electric Shock Protection. The Detailed Scope Of The Order Regarding The Implementation Of The Subject Of The Contract Is Specified In The Documentation Attached To The Swz, I.E. Bill Of Quantities, Contract Template, Construction Design, Technical Descriptions Constituting Annexes To The Swz. However, The Ordering Party Indicates That The Bills Of Quantities Are Only Of Auxiliary Nature For The Contractor And Do Not Constitute The Basis For The Valuation Of The Offer. Providing The Bills Of Quantities Does Not Release The Contractor From The Obligation To Calculate The Offer Price Based On Technical Specifications And From The Obligation To Take Into Account All Works And Costs, Including Those Not Provided For In The Bill Of Quantities. The Contractor Is Obliged To Check The Completeness Of The Bill Of Quantities And Treat It As Auxiliary To The Above-Mentioned Documents, Which Have Priority When Determining The Actual Scope Of Works Included In The Subject Of The Order.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
a8bfb315-0049-40bc-a2d9-4c30c46ef9ab.html
Attachments
Additional Details Available on Click