GTR 81595730
Tenders Are Invited For Renovation Of The Historic Building Of The Youth Sociotherapy Center In Biała - Stage I
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
81595730
Tendering Authority
Subscribe to view
Tender No
IZ.272.5.2024.PS
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Renovation Of The Historic Building Of The Youth Sociotherapy Center In Biała - Stage I
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
03-07-2024
Closed
Work Detail
Renovation Of The Historic Building Of The Youth Sociotherapy Center In Biała - Stage I The Investment Task Is Co-Financed By The Government Fund For Polish Order: Monument Reconstruction Program And The Budget Of The Czarnków-Trzcianecki District. Subject Matter Of The Order - Pursuant To Art. 103(1) Of The Public Procurement Law. - Is The Design And Execution Of Construction Works Within The Meaning Of The Act Of July 7, 1994 - Construction Law. The Subject Of The Order Is To Carry Out Investment Works Related To The Execution Of Necessary Design Works, Carrying Out Formal And Legal Activities And Carrying Out Construction Works, Including Thermal Modernization, Covering The Structure And Covering Roof Within The Usable And Non-Usable Attic According To The Description And Guidelines Contained In The Functional And Utility Program (Ffu) Of The Project: Renovation Of The Historic Building Of The Youth Sociotherapy Center In Biała - Stage I. The Contractors Tasks Will Also Include Obtaining A Building Permit On Behalf Of The Investor Or Reporting Construction Works Of The Facility To The Appropriate Institutions, Obtaining The Required Consents And Permits Related To The Implementation Of Individual Scopes Of Work (If Applicable), Preparing As-Built Documentation And Obtaining The Required Occupancy Permits (If Applicable) And Providing Warranty Services. As Part Of The Subject Of The Order, The Contractor Should Perform A Complete And Functional Layout Consistent With The Presented Concept And Consistent With The Assumptions It Is Intended To Serve. Scope Of Works Required To Be Performed By The Contractor Selected In The Basic Procurement Procedure In The Design-Build Formula: 1. Design Work And Formal And Legal Support For The Investment Formal And Documentation Activities: - Execution In Maps For Design Purposes, If Necessary, - Technical Inventory Of The Facility And Structural Elements To The Extent Necessary For The Investment, - Technical Assessment Of The Existing Condition Of The Structure, Including Recommendations And Conclusions Regarding Renovation, Replacement Of Necessary Elements, - Inventory Of Chimneys And Chimney Sweepers Opinion, - Design Construction And Technical (Architecture + Structure) Roof Renovation, Including The Selection Of The Type And Thickness Of Insulating Materials For Walls And Roofs That Meet The Currently Applicable Requirements Of The Regulation Of The Minister Of Infrastructure On The Technical Conditions To Be Met By Buildings And Their Location, - Calculation Cards For The Selection And Type Of Thermal Insulation, - A Report On The Performance Of Conservation Research And Stratigraphic Outcrops Along With Their Description Agreed With The Provincial Office For The Protection Of Monuments In Poznań, Branch Office In Piła, Prepared By An Authorized Conservator Of Monuments, - Technical Assessment Of The Infection By Fungi And Insects Destroying Wood In The Attics Of Buildings, Prepared By A Mycological And Entomological Expert, - Technical Design Of The Attic Lighting Installation And The Buildings Lightning Protection System, - Technical Design Of Adapting The Building To The Applicable Fire Protection And Evacuation Regulations Based, If Necessary, On The Prepared Technical Expertise And Consultation With The Provincial Commander Of The State Fire Service In Poznań, - Approval Of The Designs With The Relevant Public Administration Services, Including Fire Protection, Conservator Of Monuments, Sanitary Inspectorate, Etc., - Carrying Out Formal Activities - Building Permit, - Preparing Approval Documentation, Carrying Out Acceptances Required By Law By Public Administration Bodies.2. Construction Works:A. Construction Works: - Carrying Out Cleaning Works In The Attic, Removal And Disposal Of Equipment Stored In The Attic Of The Building, Removal And Disposal Of Rubble And Waste From The Construction Site; 1 Set, - Reconstruction Of Existing Chimneys To The Necessary Extent And Reconstruction Of Chimneys Demolished After The Fire; Approx. 9.6 M3, - Replacement Of The Roof Covering With Insulation Of Roof Slopes Made Of Plain Tiles Laid Alternately (Randomly - Melange Effect, As In The Example Photo In Pfu) From Different Production Grades; Approx. 630 M2, - Replacement Of The Roof Covering With Insulation With Roofing Rock Wool, Covering With Two Layers Of Thermally Weldable Felt - Roofs Of Single-Story Annexes; Approx. 40 M2, - Replacement Of Excessively Corroded And Carbonized Roof Truss Elements, Reconstruction Of Existing Elements According To The Prepared Technical Expertise Using Dedicated Technology; 1 Set, - Removal Of Pests From Wooden Elements Of The Ceiling And Roof Trusses In The Scope And Technology Consistent With The Prepared Mycological And Entomological Expertise; 1 Set - Fireproof Impregnation And Roof Truss Reinforcement; 1 Set, - Installation Of Fanlights, Roof Hatches, Smoke Exhaust Flap According To Arrangements With Wuoz; 1 Set, - Replacement Of Corroded And Carbonized Structural Elements Of The Ceiling, Replacement Of The Ceiling Formwork According To The Prepared Technical Expertise; Approx. 150 M2, - Construction Of Technical Platforms For Servicing Chimneys In The Unused Attic Or Construction Of A New Wooden Floor, If Such A Requirement Is Imposed By Wouz, Approx. 150 M2, - Renovation Of Wooden Window Joinery Taking Into Account Wuoz Guidelines With Replacement Of Glazing, Installation Of Additional Elements From The Inside Thermally Insulating Windows Or Additional Glazing With Thermally Insulating Glass; 14 Pieces, - Thermal Modernization Of Vertical And Horizontal Partitions Within The Last Usable Floor Of The Building Using Rock Wool With A Thickness Resulting From Thermal Studies/Calculations; Approx. 650 M2, - Demolition And Reconstruction From The Inside To The Necessary Extent (In The Attic, Existing Rooms, Etc.) Of Roof Slopes And Partition Walls Necessary For Roof Reconstruction And Thermal Modernization To The Extent Agreed With Wuoz; Approx. 430 M2, - Adapting The Facility Within The Rebuilt Floors To The Applicable Fire Protection Regulations. And Evacuation, Taking Into Account The Need To Implement Alternative Solutions Agreed With The District Commander Of The State Fire Service Based On A Prepared Expert Opinion Or Other Study Allowing For Determining The Scope Of Construction Works Necessary For This Stage; 1 Set, - Performance Of Other Necessary Accompanying Works; 1 Set, B. Installation Works - Electrical: - Installation Works To The Extent Necessary To Adapt The Building Within The Rebuilt Floors To The Applicable Fire Protection And Evacuation Regulations, Taking Into Account The Need To Implement Substitute Solutions Agreed With The District Commander Of The State Fire Service Based On The Prepared Expert Opinion Or Other Study Allowing For Determining The Scope Of Works. Delivery And Installation Of A Smoke Exhaust Flap In The Roof; 1 Set, - Execution Of A Lighting Installation In The Unused Attic With A Separate Power Supply From The Existing Electrical Switchboard On The Ground Floor; 1 Set, - Execution Of Emergency And Evacuation Lighting Installation; 1 Set, - Execution Of A Complete Lightning Protection Installation; 1 Set, - Execution Of Building Grounding Consisting Of Reconstruction/Modernization Of The Existing Ring Earthing, Taking Into Account Necessary Earthworks, Reconstruction Of The Surface, Etc.; 1 Set, - Performance Of Other Necessary Accompanying Works; 1 Set, C. Installation Works - Sanitary: - Reconstruction Of Sanitary Installations Within The Rebuilt Floors, Including Reconstruction Of The Central Heating Installation - Change To A Closed System, Removal Of The Existing Expansion Vessel; 1 Set, - Performance Of Other Necessary Accompanying Works; 1 Set. Place Of Implementation Of The Investment Task: Youth Sociotherapy Center In Biała, Ul. Parkowa 1, Located On Plot No. 908, Biała Registration District, Trzcianka Commune. A Detailed Description Of The Subject Of The Order And A Description Of The Employers Requirements Regarding The Implementation And Acceptance Of The Works Are Specified In The Functional And Utility Program (Ffu), Constituting Annex No. 11 To The Swz.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
08f8ea24-e569-4827-8ad0-5f1a885028cf.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.