GTR 81595726

Tenders Are Invited For Execution Of Construction Works As Part Of The Project Entitled: Thermal Modernization Of The Branch Of The Non-Local Kindergarten In Złaków Borowy - Stage I

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
81595726
Tendering Authority
Subscribe to view
Tender No
RI.ZP.272.28.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Execution Of Construction Works As Part Of The Project Entitled: Thermal Modernization Of The Branch Of The Non-Local Kindergarten In Złaków Borowy - Stage I
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
28-06-2024 Closed
Work Detail
1) The Subject Of The Order Is Performance Of Construction Works As Part Of The Project Entitled: Thermal Modernization Of The Branch Of The Kindergarten In Złaków Borowy - Stage I (Implementation In The Build Formula), Including The Construction Project: Reconstruction And Expansion Of The Kindergarten Building In Złaków Borowy Together With With The Construction Of A Gas Installation With A Liquefied Gas Tank, The Construction Of A Sewage Treatment Plant And Other Technical Infrastructure And The Demolition Of The Farm Building In The Scope Of Only Stage I, Specified In Section 6).2) The Scope Of The Investment Task Is Limited To The Employers Real Estate: Kindergarten Building In Złaków Borowy (Złaków Borowy 159, 99-440 Złaków Borowy), Złaków Borowy Commune, Plot No. 1227, District: 0023 Zduny.3) Existing Condition: The Building Which Is The Subject Of The Construction Project Serves As A Kindergarten. The Rooms Used As A Kindergarten Are Located On The Ground Floor ( Vestibule, Childrens Room, Toilets, Dining Room, Catering Kitchen, Washroom, Speech Therapy Room). The First Floor Is Not Currently In Use Due To The Poor Technical Condition Of The Stairs And Rooms. The Building Does Not Have A Basement. Existing Installations In The Building: • Electricity, • Water From The Municipal Water Supply, • Gravity Ventilation, • Rainwater Discharged Into The Area, • Sewage Discharged To The Sanitary Sewage System (Non-Outflow Tank For Liquid Waste), • Heating From An Oil Boiler Room. Building Structure:• Solid Brick Walls, Without Insulation, • Wooden Ceiling, On Wooden Joists, • Roof Structure - Wooden, Roof Covering - Felt, • Pvc Windows, • Reinforced Concrete Stairs. 4) Characteristic Parameters Of The Building After Construction Works Of Both Stages:• Usable Area 332.22 M2• Building Area 261.07 M2• Cubic Capacity 2109.15 M3• Number Of Above-Ground Floors 2• Number Of Underground Floors None• Building Height 8.03 M - Low Building5) The Scope Of The Subject Of The Order Includes In Particular: And. Purchase Of Necessary Materials And Their Delivery, B. Performance Of Construction Works, C. Performing An As-Built Surveying Inventory, D. Development Of An As-Built Conceptual Electrical Diagram Taking Into Account The Photovoltaic Micro-Installation With Connection To The Internal Installation And The Types Of Electrical Devices And Apparatus Used, E. Preparation Of As-Built Documentation (2 Copies In Paper Version And 1 Copy On An Electronic Medium In *.Pdf Format, F. Conducting Necessary Training For The Staff, G. Obtaining All Legally Required Arrangements, Opinions And Administrative Decisions Necessary For The Implementation And Completion Of Construction Works, Commissioning And Handing Over The Facility For Use To The Ordering Party, Reporting The Connection Of The Photovoltaic Micro-Installation To The Power Grid To The Local Dso After Its Construction (Excluding Obtaining A Building Permit, Which Remains The Responsibility Of The Ordering Party), H In The Event Of A Desire To Sell The Electricity Produced From A Res Source To The Distribution Network (As A Prosumer).6) The Scope Of Construction Works To Be Performed As Part Of The Entire Construction Project Includes In Particular (Only Construction Works Marked As Are Planned To Be Performed Under This Subject Of The Order). Stage I”): Demolition Works: A. Demolition Of A Farm Building With A Built-Up Area Of ​​Approx. 66.75 M2. Demolition Of The Existing Stairs And Vestibule - Stage I, C. Demolition Of The Wooden Inter-Story Ceiling – Stage I, D. Demolition Of The Existing Roof – Stage I, E. Demolition Of External Stairs And Ramps - Stage I, F. Demolition Of Allotment Walls And Parts Of Load-Bearing Walls Inside The Building - Stage I. Reconstruction And Expansion Of The Building Consisting Of: A. Expansion Of The Building With An Entrance Area With A Staircase And An Elevator, Towards The North, In Place Of The Existing Stairs Scheduled For Demolition. The Walls Are Designed To Be Made Of Silicate Blocks With A Thickness Of 24Cm. Insulated With 18 Cm Thick Styrofoam, Min. Λ = 0.034W/Mk, Finishing With Silicate Plaster And Mineral Plaster With Wood Imprint - Stage I, B. Construction Of A New Inter-Story Ceiling With A Monolithic, Reinforced Concrete Structure (In Accordance With The Technical And Executive Design), Along With Insulation With Thick Polystyrene. 8 Cm, And A Concrete Screed Thick. 5 Cm And Finishing The Floor - Stage I, C. Addition And Renovation Of Existing Fireplaces - Stage I, D. Addition Of Attic Walls – Stage I, E. Execution Of Sheet Metal Work From Galvanized, Powder-Coated Steel Sheets - Stage I, F. Construction Of A Flat Roof Over The Entire Building, Including A Boiler Room With A Reinforced Concrete Structure, With Insulation With Sloping Polystyrene, Min. 25 Cm, Min. Λ = 0.034W/Mk And Covering With Underlay And Top Covering - Stage Ig. Vertical Moisture Insulation Of Foundation Walls Together With Plinth Walls - Stage I, H. Execution Of Vertical Moisture-Proof Insulation Of Foundation Walls, Along With Insulation, Using Xps Polystyrene, Thickness 16 Cm, Min. Λ=0.033 W/Mk – Stage I,I. Horizontal Damp-Proof Insulation Of Foundation Walls By Injection - Stage I, J. Replacement And Installation Of New Windows And External Doors, Along With The Construction And Enlargement Of Openings In The Load-Bearing Walls - Stage I, K. Repair And Insulation Of External Walls - Stage I, L. Insulation Of External Plinth Walls – Stage I, M. Changing The Functional Layout Inside The Building Along With Making Openings In The Load-Bearing Walls, N. Construction Of A Floor On The Ground In The Building, Along With Insulation With 15 Cm Thick Xps Polystyrene Λ = 0.034 W/Mk, Concrete Screed And Floor Finishing. Renovation Of The Buildings Interior Consisting Of: A. Change Of The Functional Layout, Construction Of New Partition Walls Made Of 12 Cm Thick Silicate Blocks, B. Renovation And Construction Of Toilets, C. Renovation Of Walls And Ceilings, Installation Of Acoustic Suspended Ceilings And Floors, Finishing In The Added Part Of The Building, D. Installation Of New Interior Doors, E. Installation Of New Sanitary Equipment (White Assembly). Sanitary Installation Works: A. Dismantling The Existing Sanitary Installations In The Building - Stage I, B. Execution Of Water Supply Installation (Domestic And Fire Protection) - Stage I Includes Only The Construction Of Levels And Risers, C. Execution Of Sanitary And Condensate Sewage Systems - Stage I Includes Only The Construction Of Sanitary Sewage Levels And Risers, D. Execution Of A Heat Source Installation Based On A Gas Boiler For Liquefied Gas - Stage I, E. Construction Of A Heating Installation With Radiators And Control Fittings - Stage I Includes Only The Construction Of Levels And Risers, F. Installation Of Mechanical Supply And Exhaust Ventilation With Heat Recovery, G. Execution Of Air Conditioning Installation In Rooms On The First Floor Of The Building. Electrical Installation Works: A. Dismantling Existing Electrical Installations – Stage I,B. Installation Of Basic Internal Lighting, C. Installation Of Emergency Evacuation Lighting, D. Installation Of Sockets And Forces, E. Photovoltaic Installation – Stage I, F. Grounding Installation, G. Lightning Protection Installation, H. Protection Against Electric Shock. Works On The Plots: A. Construction Of An External Ramp - Stage I, B. Construction Of New External Stairs At The Main Entrance To The Building - Stage I, C. Reconstruction Of The Stairs At The Emergency Exit From The Kindergarten And The Back Entrance - Stage I, D. Construction Of A 4.0M Wide Fire Road. Paved Access To The Building, 1.5 M Wide, And Strips Around The Building Made Of Concrete Cubes, F. Construction Of New Lawns, G. Construction Of A Playing Field And Playground On A Safe Surface, H. Construction Of Two Parking Spaces, Including One For Disabled People, I. Construction Of Plot Fencing And Internal Fences, J. Construction Of An External Gas Installation With A Liquid Gas Tank With A Capacity Of 2700 L – Stage I, K. Construction Of A Water Supply Connection And An External Water Supply System, Construction Of A Connection And An External Sanitary Sewage System Along With A Biological Sewage Treatment Plant And A Drainless Tank For Water Discharged From The Treatment Plant - Stage I.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
27645aed-e9e8-421c-86c2-c7bdf71c3f3c.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders