GTR 81542620

Tenders Are Invited For Preparation Of Design Documentation For The Task Titled: Reconstruction Of District Road No. 1130W In Stromiec, Ul. Warecka

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
81542620
Tendering Authority
Subscribe to view
Tender No
PZDP.271.19.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Preparation Of Design Documentation For The Task Titled: Reconstruction Of District Road No. 1130W In Stromiec, Ul. Warecka
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
21-06-2024 Closed
Work Detail
Ii. Description Of The Subject Of The Order: Development Of Design Documentation For The Task Titled: Reconstruction Of District Road No. 1130W In The Town Of Stromiec, Ul. Warecka1.Description Of The Existing Conditiondistrict Road No. 1130W Between Stromiec And Wyborów Ul. Warecka In Stromiec Is A Through Road With A Road Cross-Section With Shoulders On Both Sides, And In The Part Before The Beginning Of The Development There Is A Pedestrian Sidewalk Directly Adjacent To The Road, 2.00 M Wide And With A Cobblestone Surface. It Is Located In A Partially Built-Up Area. On The Right Side, Before The Beginning Of The Development, There Is A Pedestrian Crossing. Bituminous Road Surface, 5.50 M Wide, In Good Technical Condition, Dirt Shoulders On Both Sides, 0.75 M Wide. On The Section Planned For Reconstruction, The District Road Has One Intersection With A Paved Municipal Road (End Of Study). There Is Technical Infrastructure In The Road Area. Attachment No. 1 Shows The Route Of The Road To Be Designed.2. Assumptions For Design2.1. Design Data: 2.1.1 As Part Of The Reconstruction, A Pedestrian Sidewalk Should Be Designed Located Directly Next To The Road, Separated From The Road Edge By A Light Curb Placed On A Concrete Footing. From The Outside, There Is A Concrete Rim With A Thickness Of 8Cm Placed On A Concrete Bench. Planned Width Of The Sidewalk - Minimum In Accordance With Applicable Regulations. Sidewalk Surface Made Of Asphalt Concrete, Thickness: 5 Cm, Surface Of Exits Made Of Asphalt Concrete, Thickness. 5Cm. Road Drainage Should Be Designed Within The Road Area. 2.1.2 Road Drainage:1. Due To Existing Road Ditches, Drainage Should Be Planned Using Them. - If It Is Not Possible To Drain Water In The Above-Mentioned Manner, Other Technical Solutions Should Be Proposed.2.2 The Documentation Should Be Prepared In Accordance With Applicable Regulations And Principles Of Technical Knowledge.2.3 The Design Documentation Should Be Complete In Terms Of The Purpose It Is To Serve.2.4 Documentation Design Will Be The Basis For The Implementation Of Construction Works.2.5 Design Documentation, Bill Of Quantities And Technical Specification For The Execution And Acceptance Of Works Should Be Developed In Accordance With The Principles Set Out In The Regulation Of The Minister Of Infrastructure, Development And Technology Of December 20, 2021 On The Detailed Scope And Form Of Design Documentation, Specifications Technical Execution And Acceptance Of Construction Works And The Functional And Utility Program. The Bill Of Quantities Should Take Into Account The Maximum Possible Consolidation Of Individual Construction Works. At The Stage Of Preparing The Bill Of Quantities, It Is Required To Make Arrangements With The Ordering Party Regarding The Form, Scope Of The Bill Of Quantities And The Method Of Consolidating The Bill Of Quantities Items.2.6. The Investors Cost Estimate Should Be Prepared In Accordance With The Regulation Of The Minister Of Infrastructure, Development And Technology Of December 20, 2021 On Determining The Methods And Basis For Preparing The Investors Cost Estimate, Calculating The Planned Costs Of Design Works And The Planned Costs Of Construction Works Specified In The Functional And Utility Program.2.7 Water Law Report (About As Necessary) For The Designed Drainage Should Be Performed In Accordance With Art. 408 Of The Act Of July 20, 2017 - Water Law (Journal Of Laws Of 2022, Item 2625) And Obtain A Water Permit For Specific Use Of Water. The Water Law Report Should Be Prepared In A Descriptive And Graphic Form, As Well As On It Data Carriers As A Text Document, And The Graphic Part Of The Report Should Be Prepared In The Form Of Raster Files (Pdf) Or Files In The Vector Spatial Data Format, Mapped In One Of The Applicable Geodetic Coordinate Systems. It Must Contain All The Necessary Elements Specified Above. The Act And The Implementing Acts Issued On This Basis - If It Is Necessary For The Implementation Of The Subject Of The Order.2.8 The Decision To Exclude Agricultural Land Intended For Roads From Agricultural Production - If It Is Necessary For The Implementation Of The Subject Of The Order.2.9 The Design Documentation Should Meet All The Requirements Needed For Effective Notification Construction Works Or Obtaining A Decision On A Building Permit.2.10 When Developing The Project, The Contractor Agrees On The Project On An Ongoing Basis And Informs The Ordering Party About The Progress Of The Work. Before The Contractor Submits The Project To The District Office, The Employers Approval Must Be Obtained.3. Scope Of The Study.3.1. A Set Of Design Documentation In Accordance With Current Legal Requirements For Reporting Construction Works Or Obtaining A Building Permit, I.E. • Appropriate Sketches Or Drawings, As Well As Permits, Arrangements And Opinions Required By Separate Regulations; • Updated Map For Design Purposes - According To Design Needs; • Specification Technical Execution And Acceptance Of Construction Works, Bioz Information;• Bill Of Quantities;• Investors Cost Estimate;• Agreeing The Project With Network Administrators And Road Managers• Before Preparing The Documentation, Boundaries Should Be Indicated;• Reconstruction Or Protection Of Devices And Networks That Conflict With The Reconstruction In Question Should Be Designed Roads.• Certificate Of The Authors Of The Project About Belonging To The Appropriate Trade Chamber And The Designers Declaration That The Project Was Prepared In Accordance With Applicable Regulations And Principles Of Construction Knowledge;• Any Other Documents If Necessary For The Execution Of The Subject Of The Order, E.G. An Extract From The Land Register, Geological Research, Decision On The Exclusion From Agricultural Production Of Agricultural Land Occupied For Roads,
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
351dd18f-dc94-4c66-ac4c-c3d3a0e6da8e.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders