GTR 81318408

Tenders Are Invited For Execution Of Post-Consolidation Development As Part Of The Task Entitled: Consolidation Of Land In The Districts Of Wola Korybutowa First, Wola Korybutowa Drugi And Wola Korybutowa-Kolonia, Siedliszcze Commune, Chełm County, Lublin Voivodeship

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
81318408
Tendering Authority
Subscribe to view
Tender No
OG.272.1.40.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Execution Of Post-Consolidation Development As Part Of The Task Entitled: Consolidation Of Land In The Districts Of Wola Korybutowa First, Wola Korybutowa Drugi And Wola Korybutowa-Kolonia, Siedliszcze Commune, Chełm County, Lublin Voivodeship
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
25-06-2024 Closed
Work Detail
1. The Subject Of The Order Includes The Execution Of Construction Works Consisting Of: A) Construction Of Municipal Road No. 115409L From Km 0+000 To Km 1+715.19 And Construction Of An Internal Road From Km 0+002.97 To Km 0+223.70 (Marked In Post-Merger Development No. I) Along With The Construction Of An Exit To The Provincial Road No. 838, B) Construction Of Municipal Road No. 104570L From Km 0+001.90 To Km 0+762.39 (Marked In Post-Merger Development No. V), C) Reconstruction Of The Road Municipality Marked In The Post-Consolidation Development No. Ix On The Section From Km 0+006.49 To Km 0+623.20 Along With The Construction Of An Exit To The District Road No. 1809L, D) Land Reclamation On Plot No. 324, 321, 325, 322, 323, 326, 327, 328, 329, Wola Korybutowa-Kolonia District As Part Of The Implementation Of The Investment Project Titled Consolidation Of Land In The Districts Of Wola Korybutowa First, Wola Korybutowa Drugi, Wola Korybutowa-Kolonia, Siedliszcze Commune, Chełm County, Lublin Voivodeship.2. The Scope Of The Planned Works Includes, Among Others: 1) In The Scope Of The Road Marked No. I: A) Preparatory Works On A Section With A Length Of 1,942 Km, B) Cutting Down Trees And Bushes Together With Grubbing Up Tree Trunks, C) Demolition Works, D) Earthworks, E) Drainage Of The Road Body, F) Construction Of The Substructure, G) Construction Of The Surface From Mineral-Bituminous Mixtures, H) Construction Of Roadsides, I) Finishing Works, J) Road Marking. 2) In The Scope Of The Road Marked No. V: A) Preparatory Works On Section With A Length Of 0.762 Km, B) Cutting Down Trees And Bushes Together With Grubbing Up Tree Trunks, C) Demolition Works, D) Earthworks, E) Drainage Of The Road Structure, F) Construction Of Sub-Base, G) Construction Of Surfaces From Mineral-Bituminous Mixtures, H) Construction Of Roadsides,I) Finishing Works,J) Road Marking.3) In The Scope Of The Road Marked No. Ix:A) Preparatory Works On A Section With A Length Of 0.626 Km,B) Cutting Down Trees And Bushes Along With Grubbing Up Stumps,C) Demolition Works,D ) Drainage Of The Road Body, E) Mechanical Leveling And Replenishment Of The Soil, 4) In The Field Of Land Reclamation Including The Liquidation Of Old Roads: A) Measurement Works Over A Length Of 0.256 Km, B) Clearing Bushes - Area 1,069 M2, C) Land Leveling (Cutting Copper) - Area 128 M2, D) Leveling The Area (Fertilizing The Land Ensuring The Possibility Of Agricultural Cultivation) - 320.7 M3.3. The Scope Of The Planned Works Includes, Among Others:5) In The Scope Of The Road Marked No. I:K) Preparatory Works On A Section With A Length Of 1,942 Km,L) Cutting Down Trees And Bushes Together With Grubbing Up Tree Trunks,M) Demolition Works,N) Earthworks, O) Drainage Of The Road Body,P) Construction Of The Substructure,Q) Construction Of The Surface From Mineral-Bituminous Mixtures,R) Construction Of Roadsides,S) Finishing Works,T) Road Marking.6) In The Scope Of The Road Marked No. V:K) Preparatory Works On Section With A Length Of 0.762 Km,L) Cutting Down Trees And Bushes Together With Grubbing Up Tree Trunks,M) Demolition Works,N) Earthworks,O) Drainage Of The Road Structure,P) Construction Of Sub-Base,Q) Construction Of Surfaces From Mineral-Bituminous Mixtures,R) Construction Of Roadsides, S) Finishing Works, T) Road Marking. 7) In The Scope Of The Road Marked No. Ix: F) Preparatory Works On A Section With A Length Of 0.626 Km, G) Cutting Down Trees And Bushes Together With Grubbing Up Stumps, H) Demolition Works, I ) Drainage Of The Road Body, J) Mechanical Leveling And Filling Of The Soil, 8) In The Field Of Land Reclamation Including The Liquidation Of Old Roads: E) Measurement Works Over A Length Of 0.256 Km, F) Clearing Bushes - Area 1,069 M2, G) Leveling The Area (Cutting Copper) - Area 128 M2, H) Leveling The Area (Fertilizing The Land Ensuring The Possibility Of Agricultural Cultivation) - 320.7 M3.4. A Detailed Description Of The Subject Of The Order Is Included In The Design Documentation Constituting Annex No. 8 To The Swz, Which Consists Of: 1) Construction Designs Or Road Designs, Including: A) Land Development Designs, B) Architectural And Construction Designs, C) Appendices To The Design Construction, D) Inventory Of Greenery Intended For Felling, E) Technical Designs, F) Road Designs (Within The Scope Of Roads Subject To Mechanical Leveling), G) Land Reclamation Design, H) Designs Of Exits At Junctions To Public Roads, 2) Technical Specifications Of Construction And Acceptance Of Construction Works (Stwior),3) Permanent Traffic Organization Designs,4) Bills Of Quantities.4. The Length Of The Quality Warranty Period For Completed Construction Works And Delivered And Incorporated Materials Is Min. 60 Months From The Date Of Final Acceptance Of Construction Works And Constitutes A Criterion For Evaluating Offers. The Ordering Party Specifies It For A Period Ranging From 60 Months (Minimum Term) To 84 Months (Maximum Term). The Quality Guarantee Covered By The Offer Evaluation Criterion Does Not Cover The Following Minimum Warranty Periods: A) Thick-Layer Horizontal Markings, Markings With Tapes And Reflective Point Elements - The Guarantee Is 60 Months, B) Supporting Structure For Gate And Boom Road Signs - The Warranty Is Issued Individually For Each Supporting Structure. The Minimum Durability Period Of The Supporting Structure Is 10 Years, C) Posts For Vertical Warning, Prohibition, Order And Information Signs With Standard Dimensions And In The Case Of Elements Used To Attach Signs To Other Objects Or Structures, A Warranty May Be Issued For A Delivery Batch And Is 60 Months. The Ordering Party Does Not Require The Contractor To Submit The Said Evidence Along With The Offer.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
e605b384-71b6-450f-9454-1f78b3f7bec3.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders