GTR 81318070
Tenders Are Invited For Modernization Of Womens And Mens Swimming Pool Changing Rooms In The Swimming Pool Building Of The Sports And Recreation Center In The Żoliborz District, Ul. Potocka 1 In Warsaw.
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
81318070
Tendering Authority
Subscribe to view
Tender No
ZP-2/OSIR/2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Modernization Of Womens And Mens Swimming Pool Changing Rooms In The Swimming Pool Building Of The Sports And Recreation Center In The Żoliborz District, Ul. Potocka 1 In Warsaw.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
25-06-2024
Closed
Work Detail
The Subject Of The Order Is The Modernization Of Womens And Mens Swimming Pool Changing Rooms In The Swimming Pool Building Of The Sports And Recreation Center In The Żoliborz District, Ul. Potocka 1 In Warsaw As Part Of The Investment Project Modernization Of Swimming Pool Changing Rooms (Womens And Mens). Detailed Scope Of Construction Works: Construction Industry: - Dismantling Of Existing Small Equipment; - Dismantling Of System Cabinets And Benches; - Dismantling The Changing Room Walls; - Dismantling The Door Leaf; - Forging Steel Door Frames From The Wall; - Dismantling The Suspended Ceiling; - Dismantling The Wall Cladding Made Of Ceramic Tiles; - Dismantling The Walls Made Of Aerated Concrete Slabs; - Dismantling The Floor Made Of Tiles With Cement Mortar; - Manual Dismantling Of Concrete Structure Elements; - Dismantling Of Damp-Proof And Waterproof Insulation; - Dismantling Of Thermal Insulation And Anti-Sound Insulation Made Of Polystyrene Boards; - Waste Removal And Disposal. Walls - Erection Of A Partition Wall Made Of Aerated Concrete Blocks; - Arrangement Of Prefabricated Lintels In Partition Walls; - Execution Of Internal Plasters. Floors - Execution Of Horizontal Moisture-Proof Insulation With A Flexible Polymer Thick-Layer Coating - Execution Of Thermal Insulation And Anti-Sound Insulation Made Of Polystyrene Boards; - Making Moisture And Waterproof Insulation; - Laying A Cement Screed; - Priming Subfloors For Floor Tiles; - Sealing Wet Rooms With Sealing Foil; - Sealing The Edges Of Walls And Floors With Sealing Tapes; - Gluing Shapes - Sealing Cuffs - Into The Waterproof Coating ;- Laying The Floor With Tiles Using The Usual Method; - Supplementing The Floor After Changing The Wall Arrangement. Wall Cladding - Priming The Substrates For The Tiles; - Sealing Wet Rooms With Sealing Foil Up To The Height Of The Suspended Ceiling; - Gluing Shapes - Sealing Cuffs - Into The Waterproof Coating; - Facing The Walls With Tiles Laid Using The Usual Method; - Finishing Of Corners - Flat Corner Strip - Priming Surfaces For Painting; - Painting Internal Surfaces With Emulsion Paints; Ceilings - Laying Armstrong Suspended Ceilings. Door And Window Joinery - Installation Of Entrance Doors 90X210. Furniture And Sanitary Equipment - Installation Of Washbasin Countertops; - Installation Of A Changing Room Made Of Hpl Boards; - Installation Of System Cabinets; - Adaptation Of Existing System Cabinets To The New Arrangement; - Installation Of Hpl Benches; - Installation Of A Changing Table With Certificate; - Installation Of A Mirror With Built-In Lighting. Corridor - Installation Of An Illuminated Osir Logo - Installation Of A Deposit Cabinet. Sanitary Industry Sewerage Installation - Disassembly Of Floor Drains; - Disassembly Of A Pvc Sewage Pipeline; - Installation Of A Pvc Sewage Pipeline; - Installation Of Stainless Steel Drains; - Installation Of Fireproof Bands. Central Heating Installation - Dismantling Of The Central Heating Installation. (2 Radiators); - Distribution Of Central Heating Installations; - Installation Of Radiators; - Flushing Of Installations; - Tightness Testing Of Water Supply Installations; - Insulation Of Pipelines. Electrical Industry - Disassembly Of Lighting Fixtures; - Disassembly Of Plastic And Metal Boxes; - Disassembly Of Installation Connectors Flush-Mounted Sockets;- Disassembly Of Flush-Mounted Plug Sockets;- Disassembly Of Flush-Mounted Cables;- Mechanical Cutting Of Grooves;- Assembly Of Bakelite Boxes And Plug Sockets On A Ready-Made Surface;- Installation Of Windurope Pipes;- Mortaring Of Grooves;- Laying Of Cable Wires;- Assembly Of Skylight Fixtures On A Ready-Made Surface ;- Installation Of A Fire Detector, - Connection Of Lighting Fixtures; - Modernization Of The Electrical Board; - Checking And Measuring The Complete Single-Phase Low Voltage Electrical Circuit. Note: Sanitary Industry. The Investment Should Be Carried Out Without Unduly Disturbing The Building Elements Intended To Be Preserved, The Existing Equipment Should Be Secured, And In The Event Of Damage, Restore It. During The Works, Normal Activities Will Be Carried Out In The Existing Building. This Must Be Taken Into Account By The Organization Of The Works And The Security Of The Facilities. The Detailed Scope Of The Subject Of The Order Is Specified In The Design Documentation And The Technical Specifications For The Execution And Acceptance Of The Works. Wherever The Ordering Party Referred To Standards In The Description Of The Subject Of The Order Or In The Annexes To The Description Of The Subject Of The Order, Equivalent Solutions May Be Used. If The Contractor Offers A Solution That Does Not Directly Correspond To The Reference Standards Described In The Above-Mentioned Documents, Then The Contractor Is Obliged To Prove In The Offer, In Particular By Means Of Evidence Referred To In Articles 104-107 Of The Public Procurement Law, That The Proposed Solutions Meet The Requirements Specified In The Description Of The Subject Of The Order To An Equivalent Extent. If The Contractor Offers Solutions That Do Not Directly Correspond To The Reference Standards Described In The Description Of The Subject Of The Order Or In The Annexes (Appendix No. 6 To The Swz), The Ordering Party Requires The Submission Of The Said Evidence Along With The Offer. The Ordering Party Requires Proof In The Offer, In Particular By Means Of Evidence Referred To In Art. 104-107 Of The Public Procurement Law, That The Proposed Solutions Equally Meet The Requirements Specified In The Above-Mentioned. Documents. Pursuant To Art. 107 Of The Public Procurement Law, The Evidence In Question Is Subject To Supplementation. Requirements Related To The Execution Of The Order1. In The Proceedings In Question, The Ordering Party Applies The Social Clause Pursuant To Art. 95 Section 1 Of The Public Procurement Law. 2. The Contractor Undertakes To Ensure That Activities Related To The Execution Of The Construction Works Contract, Throughout The Entire Period Of Performance Of The Subject Of The Agreement, Will Be Performed By Persons Employed Under An Employment Contract Within The Meaning Of The Labor Code By The Contractor Or Subcontractor.3. The Condition Referred To In Section 2 Will Be Fulfilled By Employing New Employees Under An Employment Contract Or Appointing Already Employed Persons Performing Activities In The Field Of Construction Works To Carry Out The Order, In Particular Preparatory Works, Sanitary And Electrical Installation Works, Finishing Works. The Method Of Verifying The Employment Of Persons And Their Authorizations The Ordering Partys Control Of The Contractors Compliance With The Requirements Related To The Employment Of These Persons And The Sanctions For Failure To Meet These Requirements Are Specified In The Draft Provisions Of The Contract Constituting Annex No. 2 To The Swz. A Detailed Description Of The Subject Of The Order Is Set Out In Annex No. 6 To The Swz, Which Is Also Annex No. 2 To The Draft Provisions Of The Contract. And: A) Draft Provisions Of The Contract - Annex No. 2 To The Swz; B) Design Documentation - Annex No. 8 To The Swz; C) Bill Of Quantities - Annex No. 7 To The Swzd) Technical Specification For The Execution And Acceptance Of Works - Annex No. 9 To The Swz
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
3f2dbcf3-3299-40cd-b990-fe1ea982d7bd.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.