GTR 81241848
Tenders Are Invited For Renovation Of The Salt Warehouse Located On The Road And Bridge Circuit No. 3 In Poczesna.
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
81241848
Tendering Authority
Subscribe to view
Tender No
PZD.262.25.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Renovation Of The Salt Warehouse Located On The Road And Bridge Circuit No. 3 In Poczesna.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
24-06-2024
Closed
Work Detail
The Subject Of The Order Is The Renovation Of A Salt Warehouse Located On The Road And Bridge Circuit No. 3 In Poczesna Ul. Bociana Górka 19, 42-262 Poczesna. Existing Condition: Salt Storage Building With A Steel Frame Structure, Single-Story, 19.10 M Long, 12.65 M Wide. The Height Of The Building At The Ridge Is 7.85 M, At The Eaves 5.70 M. The Load-Bearing Core Of The Steel Hall Is Made Of Steel Frames Spaced Approximately Every 4.60 M. Supporting Structure - Columns And Transoms, Made Of Ipe 300 Rolled Profiles, Reinforced With Buttresses Made Of Ipe 140 Profiles. Built On Reinforced Concrete Foundations. Additional Columns For The Support Of The Internal Casing Were Made Of Ipe 300 Profiles. Wall Transoms Were Made Of C100 Profiles To Fasten The External Casing. The Roof Purlins Were Made Of C140 Profiles. The Roof And Wall Bracing In The Extreme Spans Of The Hall Are Made Of Round Bars. Hall Casing – Light, Made Of Trapezoidal Sheet Metal T 35X188s. From The Inside, The Walls Were Made Of Railway Sleepers Covered With Roofing Felt And Covered With Boards. Roof Covering - Trapezoidal Sheet T 55X188d. A Gate With A Built-In Wicket, Dimensions Approx. 4.0 X 4.0 M, Made Of Square Pipes 60X60x4. The Gate Is Covered With Trapezoidal Sheet Metal T35x188s. There Are Two Steel-Framed Windows In The Gable Walls. There Is A Room In The Building, Separated By Brick Walls Made Of Foam Concrete Blocks And A Wooden Ceiling, For The Installation Of A Brine Generator. Entrance To The Room Through A Steel Gate. The Building Is Equipped With Electricity And Water Connections. Note: The Salt Storage Building Is Equipped With An Electrical Lighting And Power Supply Installation For The Brine Generator, Which Is Operational. All Works Related To Securing The Electrical Installation During Renovation Works Or Replacing Its Elements Damaged During Renovation Works Should Be Performed By A Person With Appropriate Professional Qualifications And Authorization To Work On Such Installations And Performed At The Expense And Risk Of The Renovation Contractor. Scope Works: As Part Of The Planned Renovation Of The Salt Warehouse, The Following Works Are Planned To Be Performed: • Disassembly Of The External Wall Casing And The Gate Made Of Trapezoidal Sheet Metal In A Way That Allows For Re-Building, • Demolition Of The Walls Of A Room Separated Inside The Warehouse, • Removal Of Damaged Steel Elements Of The Structure - Transoms, • Cleaning Of The Steel Structure Supporting Structure Including Degreasing, • Replacing Damaged Structural Elements, • Painting The Steel Structure, • Covering The Outside Of The Wall Casing With Railway Sleepers, • Renovating The Gate Rollers, • Reassembling The External Casing Sheets After Cutting, • Cleaning And Glazing The Windows, • Making Gutters With Downpipes, 1. A Detailed Description Of The Subject Of The Order, I.E. The Type Of Works To Be Performed Under The Order, Is Specified In The Bill Of Quantities And The Description Of The Subject Of The Order (Opz) Constituting Annex No. 1 To Swz.2. In The Event Of Changes To The Applicable Quality Standards During The Term Of The Contract, The Contractor Will Be Obliged To Adapt The Quality Of Works Performed On The Subject Of The Order To The New Standards.3. Additional Conditions Regarding The Subject Of The Order: 3.1. The Contractor Undertakes To Provide The Ordering Party With A Quality Guarantee Of Min. 12 Months.3.2. The Order Must Be Carried Out Based On The Standards And Instructions Applicable In Construction.3.3. The Contractor Is Recommended To Obtain All Information That May Be Necessary To Prepare The Offer And Sign The Contract.3.4. The Ordering Party Requires That The Contractor In The Fleet Of Motor Vehicles (Within The Meaning Of Article 2 Point 33 Of The Act Of 20 June 1997 - Road Traffic Law) Used In The Performance Of A Public Task Has An Appropriate Number Of Electric Or Natural Gas-Powered Vehicles, Thus Meeting The Provisions Art. 68 Section 3 In Connection With Art. 35 Section 2 Point 2 Of The Act Of January 11, 2018 On Electromobility And Alternative Fuels, Unless The Execution Of The Order Requires The Use Of Motor Vehicles.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
a3dd77e3-3b3f-469c-8dc0-83fff3ed7620.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.