GTR 81238517

Tenders Are Invited For Modernization Of Existing Public Buildings With Optimization Of Energy Production For Own Needs.

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
81238517
Tendering Authority
Subscribe to view
Tender No
ZP-I.272.20.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Modernization Of Existing Public Buildings With Optimization Of Energy Production For Own Needs.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
21-06-2024 Closed
Work Detail
The Subject Of The Order Is The Design And Execution Of Construction Works Related To The Implementation Of The Investment Task: Modernization Of Existing Public Buildings With Optimization Of Energy Production For Own Needs. As Part Of The Order, Photovoltaic Roofs With An Integrated Photovoltaic Installation In The Roof Covering Should Be Designed And Constructed On 10 Facilities And Properties In The District. Przysuskiego Located In 6 Locations According To The List Below: Location 1: School Complex No. 2 Im. Ludwika Skowyra In Przysuchaaddress: Ul. Warszawska 28, 26-400 Przysucha1a - School Building + Gymnasium1b - Dormitory Building Location 2: School Complex. Dr. Helena Spoczyńska In Lipiny2a - Boarding School Building2b - Boarding School Building2c - Gymnasium Buildinglocation 3: Complex Of Resocialization And Sociotherapy Facilities In Goździkowoaddress: Ul. Główna 1, 26-434 Gielniówmain Buildinglocation 4: Youth Educational Center In Kolonia Ossaaddress: Kolonia Ossa 40, 26-425 Odrzywółmain Buildinglocation 5: Youth Educational Center In Rusinów Koneckimaddress: Rusinów Konecki 32, 26-422 Rus Inów Koneckimain Buildinglocation 6: Youth Education Center In Kolonia Szczerbackiejad Address: Kolonia Szczerbacka 37, 26-400 Przysucha6a - School Building6b - Dormitory Buildingthe Scope Of Works To Be Carried Out In Accordance With The Study In Question Includes: - Performing An Inventory Of The Existing Condition Affecting The Design And Implementation Of The Investment, Including Underground Infrastructure, Paved Surfaces, Facilities Volumes, Installations, Etc.;- Obtaining A Building Permit For Photovoltaic Installations Above 150Kwp For Location 1, Total Installation Power 169.925Kwp. The Facilities Are Located On One Plot. (Installations Below 150 Kwp Do Not Require A Building Permit); - Obtaining A Building Permit In The Case Of A Roof Extension By Constructing A Roof Truss For Structures 1A, 1B, 2A, 2C, 3, 4, 5, 6A And 6B (Not Required In The Case Of Structure 2B Building Permit For Roof Replacement); - Preparation Of Design Documentation In The Form Of A Construction, Executive And Technical Design, Stwiorb, Bills Of Quantities And Investor Cost Estimates For All Facilities, Along With The Required Opinions And Arrangements; Insulation; - Taking Into Account The Current Condition Of The Roof Truss For Structure 2B In The Scope Of Renovation, If Required; - Elevating Chimneys Beyond The Roof, If Required, Strengthening The Chimney Walls Above The Roof; - Sheet Metal Processing Of The Designed Roof, Chimneys And Roof Hatches; - Construction Of A Drainage Installation (Gutters And Downpipes);- Installation Of Integrated Roofs With Photovoltaic Modules;- Installation Of Power Optimizers For Photovoltaic Modules;- Installation Of A Fire Safety Switch System. For Safe Disconnection Of Panels From The Rest Of The Dc Installation, If Required; - Installation Of Cabling On The Dc And Ac Sides, Including The Construction Of Cable Routes And Wlz Lines And Connection To The Existing Electrical Installation. - Installation Of Inverters With Powers Matched To The Installed Panels. Installation Of A Switchboard With Surge Arresters And Protections For The Dc And Ac Parts.- Installation Of Energy Storage Facilities;- Implementation Of An Energy Management System For Heating Domestic Hot Water For Locations 2, 3, 4, 5 And 6. For Location 1, It Is Not Possible To Install Heaters.- Construction Of Earthing And Lightning Protection Installations. All Supported By Calculations. - Delivery Of Software/Application Along With Installation, Commissioning And Training For The Investors Representatives, Which Will Enable Remote Monitoring, Visualization Of Processes And Reading Of The Parameters Of Each Photovoltaic Installation Via The Internet. - Connection Of Photovoltaic Installations To The Power Grid And Carrying Out All Related Activities. Related Procedures Up To The Assembly And Installation Of New Measurement Systems By The Distribution Company And Handing Over The Installation For Operation To The Investor. - Preparation For The Investor Of A Notification To The State Fire Service About The Readiness For Use Of The Photovoltaic Installation In Accordance With Joke. 56 Of The Construction Law And Obtaining Occupancy Permits When Required. Applies To All Facilities Listed In The Fup; - Performing A Set Of Measurements And Preparing Protocols For The Investor; - Preparing As-Built Documentation Along With Device Certificates, Warranty Cards, Technical And Operational Instructions For The Installed Devices. Preparation For Acceptance – Final Acceptance And Obtaining Occupancy Permits When Required. Applies To All Facilities Listed In The Ffu; It Is Planned To Install Energy Storage Facilities With An Energy Management System With A Total Capacity Of 409.4 Kwh. The Contractor Will Also Be Obliged To Verify The Capacity Of Warehouses Based On The So-Called 15 Minutes (Which It Will Obtain From Pge At Its Own Expense) And The Actual Demand For Power Consumed By Individual Facilities And Present The Conclusions To The Ordering Party. It Is Planned To Build Steel Roofs Integrated With Photovoltaic Installations On 10 Public Utility Facilities, In Accordance With The List Of Locations Of Public Utility Facilities Specified In The Functional And Utility Program (Ffu), Which Includes, Among Others: The Ordered Power Of The Facilities Was Determined. The Installations Will Be Located On Roofs, And The Installation Of A New Lightning Protection System Should Be Taken Into Account. The Contractors Offer Should Include All Services, Supplies And Construction Works Necessary For The Proper Performance Of The Subject Of The Order And The Implementation Of The Project, Until It Is Handed Over To The Ordering Party. The Ordering Party Indicates That The Document That Proves The Completion Of The Project (Separately For Each Facility) Is The Confirmation Issued By Pge Of The Possibility Of Providing Electricity Distribution Services And Specifying The Technical Parameters Of The Supply, Parameterization Of The Meter For The Photovoltaic Installation And Commissioning Of The Installation (Including Turning On The Inverter) And Submitting Appropriate Notification About The Launch Of The Installation To The State District Fire Brigade Headquarters And Obtaining Operating Permits, If Necessary. Based On Article. 29 Section 4 Points 3 Letter C), Pursuant To Art. 56 Section 1A Of The Construction Law Act (Consolidated Text: Journal Of Laws Of 2020, Item 1333, As Amended), There Is An Obligation To Notify The State Fire Service About The Commencement Of Operation Of A Photovoltaic Installation With A Capacity Above 6.5 Kw, All Installations With A Capacity Above 6.5 Kw Must Be Agreed With A Fire Protection Expert. And Notify The State Fire Service About The Implementation Of The Pv Installation. The Works Should Be Performed In Accordance With The Functional And Utility Program, Building Permit Decisions, Design Documentation, Technical Specification For The Execution And Acceptance Of Construction Works, In Accordance With Construction Practice And Applicable Standards And Legal Regulations. Detailed Description The Subject Of The Order Is The Functional And Utility Program (Ffu) - Annex No. 6 To The Swz And The Draft Contract. Bills Of Quantities Are Only Supporting Documents For Calculating The Offer Price. Allowing The Submission Of An Offer Containing Equivalent Materials Or Devices.1) The Ordering Party Has Made Every Effort To Include In The Description The Subject Of The Order Did Not Include The Trade Name Of The Company, Goods Or Product. If The Documents Constituting The Description Of The Subject Of The Order Include The Trade Name Of The Company, Goods Or Product, It Is For Information Purposes Only2) If Any Indications Of Trademarks, Patents Or Origin Appear In The Description Of The Subject Of The Order, They Determine The Minimum Quality Standard Of Materials Or Devices Accepted For Valuation. Any Materials Or Devices From Specific Manufacturers Constitute Only A Quality Standard Of The Subject Of The Order. The Use Of Exemplary Manufacturers Names Is Only Intended To Clarify The Level Of The Ordering Partys Expectations In Relation To A Specific Solution, Quality, Technical And Functional Standards. 3) Ordering Party, In Accordance With Art. 99 Section 5 Of The Ppl Allows The Contractor To Offer Materials And Devices Equivalent To Those Indicated In The Description Of The Subject Of The Contract Provided That They Ensure Technical Parameters Not Worse Than Those Assumed.4) In The Event Of Offering An Equivalent Material Or Device, The Contractor Is Obliged To Submit The Subject Matter Together With The Offer. Evidence Confirming That The Offered Materials And Devices Or Construction Works Meet The Equivalence Requirements, I.E.: A List Of Materials And Devices Other Than Those In The Swz And Their Technical Parameters, Catalog Cards Or Similar Documents. 5) The Obligation To Demonstrate The Equivalence Of The Offer Rests With The Contractor Under Pain Of Rejection Pursuant To Art. 226 Section 1 Point 5 Of The Public Procurement Law.6) If The Contractor Fails To Submit The Evidence Or The Evidence Submitted Is Incomplete, The Ordering Party Will Call On The Contractor To Submit Or Supplement It Within The Prescribed Period Pursuant To Art. 107(2) Of The Public Procurement Law. The Ordering Party Requests The Contractor To Indicate In The Offer Form For The Parts Of The Order The Performance Of Which The Contractor Intends To Entrust To Subcontractors And The Contractors Indication Of The Subcontractors Companies, If Known. The Ordering Party Does Not Reserve The Obligation For The Contractor To Personally Perform Key Parts Of The Contract For Construction Works Or Services.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
b1c8223a-ce2e-48fa-9541-dc18cd4cf145.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders