GTR 81195757
Tenders Are Invited For Construction Of 20 M Tower Foundation, Chainlink Wire Mesh Fencing& Solar Foundation At Jaydodaysgang, Thimphu
ICB — International Competitive Bid
Closed
Southern Asia
Tender Information
GTR Reference
81195757
Tendering Authority
Subscribe to view
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of 20 M Tower Foundation, Chainlink Wire Mesh Fencing& Solar Foundation At Jaydodaysgang, Thimphu
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Southern Asia
Political Region
South Asian Association for Regional Cooperation (SAARC)
Last Date of Bid Submission
21-06-2024
Closed
Work Detail
Tenders Are Invited For Construction Of 20 M Tower Foundation, Chainlink Wire Mesh Fencing& Solar Foundation At Jaydodaysgang, Thimphu Emd Value: Nu. 103,000.00/- 20 M Tower Foundation At Jaydodaysgang 2 Ew0002 Surface Dressing Of Ground, Including Removal Of Vegetations And Inequalities < 150Mm Deep, Disposal Of Rubbish Within 50M Lead And 1.5M Lifts - Hard Soil, Sq.M 400.0 3 Ew0031 Earth Work In Excavation Over Areas, Depth >300Mm, Width >1.5M, Area >10 Sq.M On Plan, Including Disposal Of Excavated Earth Within 50M Lead And 1.5M Lift & Disposed Soil To Be Neatly Dressed - Hard Soil, Cu.M 250.0 4 Ew0032 Earth Work In Excavation Over Areas, Depth >300Mm, Width >1.5M, Area >10 Sq.M On Plan, Including Disposal Of Excavated Earth Within 50M Lead And 1.5M Lift & Disposed Soil To Be Neatly Dressed - Ordinary Rock With Or Without Blasting, Cu.M 250.0 5 Ew0106 Excavation In Foundation Trenches Or Drains Not Exceeding 1.5M In Width Or Area 10 Sq.M On Plan, Including Dressing & Ramming, Disposal Of Surplus Soil Within 50M Lead & 1.5M Lif - Hard Soil, Cu.M 81.0 6 Cw0008 Providing And Laying In Position Plain Cement Concrete Excluding The Cost Of Centering And Shuttering - All Work Upto Plinth Level. - 1:4:8 (1 Cement : 4 Sand : 8 Graded Crushed Stone 40 Mm Nominal Size), Cu.M 3.77 7 Rc0002 Providing & Laying In Position Reinforced Cement Concrete Excluding The Cost Of Centering, Shuttering And Reinforcement - All Work Upto Plinth Level - 1:1.5:3 (1 Cement : 1.5 Sand : 3 Graded Crushed Rock 20 Mm Nominal Size), Cu.M 6.09 8 Rc0083 Providing & Fixing Thermo-Mechanically Treated Reinforcement Bar (Yield Strength 500 Mpa) For R.C.C Work Including Cutting, Bending, Binding And Placing In Position Complete, Kg 680.0 9 Rc0093 Providing & Fixing Centering And Shuttering (Formwork), Including Strutting, Propping Etc. And Removal Of Formwork - Columns, Pillars, Post, Struts Etc., Sq.M 30.71 10 Ew0195 Filling Of Trenches, Sides Of Foundations Etc. In Layers <200Mm Using Selected Excavated Earth, Ramming Etc. Within Lead 50 M & Lift 1.5M, Cu.M 33.72 11 None Chain Link Fencing, - - 12 Ew0001 Surface Dressing Of Ground, Including Removal Of Vegetations And Inequalities < 150Mm Deep, Disposal Of Rubbish Within 50M Lead And 1.5M Lifts - Ordinary Soil, Sq.M 120.0 13 Ew0105 Excavation In Foundation Trenches Or Drains Not Exceeding 1.5M In Width Or Area 10 Sq.M On Plan, Including Dressing & Ramming, Disposal Of Surplus Soil Within 50M Lead & 1.5M Lif - Ordinary Soil, Cu.M 67.2 14 Sm0072 Providing And Laying Hand Packed Stone Filling Or Soling With Stones, Cu.M 9.0 15 Sm0005 Providing & Laying Random Rubble Masonry With Hard Stone In Foundation & Plinth - In Cement Mortar 1:4, Cu.M 12.06 16 Cw0003 Providing And Laying In Position Plain Cement Concrete Excluding The Cost Of Centering And Shuttering - All Work Upto Plinth Level. - 1:2:4 (1 Cement : 1.5 Sand : 3 Graded Crushed Rock 20 Mm Nominal Size, Cu.M 10.5 17 Sw0003 Steel Work In Single Section Including Cutting, Hoisting, Fixing And Applying Priming Coat Of Red Lead Paint - In Tees, Angles And Channels, Kg 1268.46 18 Ew0195 Filling Of Trenches, Sides Of Foundations Etc. In Layers <200Mm Using Selected Excavated Earth, Ramming Etc. Within Lead 50 M & Lift 1.5M, Cu.M 14.4 19 Rc0090 Providing & Fixing Centering And Shuttering (Formwork), Including Strutting, Propping Etc. And Removal Of Formwork - Foundation And Plinth Etc., Sq.M 156.0 20 Rw0213 Providing & Fixing G.I Chain-Link Mesh Including Fixing Of Post Or Struts, G.I Staples (Excluding The Cost Of Posts/Struts, Earthwork, Concrete Etc.) - 4Mm (8 Swg) X 50Mm, Sq.M 216.0 21 None Gate, - - 22 Rw0016 Earthwork In Excavation In Foundation Trenches Or Drains Including Dressing Of Sides And Ramming Of Bottom, Disposal Of Surplus Excavated Soil Within 50M Lead - Hard Soil, Cu.M 0.7 23 Cw0003 Providing And Laying In Position Plain Cement Concrete Excluding The Cost Of Centering And Shuttering - All Work Upto Plinth Level. - 1:2:4 (1 Cement : 1.5 Sand : 3 Graded Crushed Rock 20 Mm Nominal Size, Cu.M 0.4 24 Sw0021 Steel Work Welded, In Built Up Sections, Trusses, Frame-Works Including Cutting, Hoisting, Fixing And Appl. Priming Coat Of Red - In Tees, Angles And Channels, Kg 120.0 25 Rw0213 Providing & Fixing G.I Chain-Link Mesh Including Fixing Of Post Or Struts, G.I Staples (Excluding The Cost Of Posts/Struts, Earthwork, Concrete Etc.) - 4Mm (8 Swg) X 50Mm, Sq.M 3.4 26 Rc0093 Providing & Fixing Centering And Shuttering (Formwork), Including Strutting, Propping Etc. And Removal Of Formwork - Columns, Pillars, Post, Struts Etc., Sq.M 2.52 27 Sw00044 Providing & Fixing Anodised Aluminium Tower Bolt (Barrel Type) With Aluminium Screws Etc. Complete200mm, Each 1.0 28 None Solar Foundation, - - 29 Ew0031 Earth Work In Excavation Over Areas, Depth >300Mm, Width >1.5M, Area >10 Sq.M On Plan, Including Disposal Of Excavated Earth Within 50M Lead And 1.5M Lift & Disposed Soil To Be Neatly Dressed - Hard Soil, Cu.M 37.5 30 Ew0106 Excavation In Foundation Trenches Or Drains Not Exceeding 1.5M In Width Or Area 10 Sq.M On Plan, Including Dressing & Ramming, Disposal Of Surplus Soil Within 50M Lead & 1.5M Lif - Hard Soil, Cu.M 11.88 31 Cw0003 Providing And Laying In Position Plain Cement Concrete Excluding The Cost Of Centering And Shuttering - All Work Upto Plinth Level. - 1:2:4 (1 Cement : 1.5 Sand : 3 Graded Crushed Rock 20 Mm Nominal Size, Cu.M 0.74 32 Rc0002 Providing & Laying In Position Reinforced Cement Concrete Excluding The Cost Of Centering, Shuttering And Reinforcement - All Work Upto Plinth Level - 1:1.5:3 (1 Cement : 1.5 Sand : 3 Graded Crushed Rock 20 Mm Nominal Size), Cu.M 3.25 33 Rc0083 Providing & Fixing Thermo-Mechanically Treated Reinforcement Bar (Yield Strength 500 Mpa) For R.C.C Work Including Cutting, Bending, Binding And Placing In Position Complete, Kg 160.0 34 Rc0093 Providing & Fixing Centering And Shuttering (Formwork), Including Strutting, Propping Etc. And Removal Of Formwork - Columns, Pillars, Post, Struts Etc., Sq.M 30.54 35 Ew0195 Filling Of Trenches, Sides Of Foundations Etc. In Layers <200Mm Using Selected Excavated Earth, Ramming Etc. Within Lead 50 M & Lift 1.5M, Tender Link : Http://Www.Tender.Bt/
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
4492296b-ea09-4644-9ee6-e6abc455f936.htm
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.