GTR 81140669

Tenders Are Invited For Modernization Of The Building Of The School And Kindergarten Complex In Głuszyn - Stage I - Development Of Design Documentation

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
81140669
Tendering Authority
Subscribe to view
Tender No
ZP.271.83.2024.KK
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Modernization Of The Building Of The School And Kindergarten Complex In Głuszyn - Stage I - Development Of Design Documentation
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
13-06-2024 Closed
Work Detail
The Subject Of The Order Is The Development Of Design Documentation For The Modernization Of The Building Of The School And Kindergarten Complex In Głuszyn To The Extent Resulting From The Attached Technical Expert Opinion On The Fire Protection Condition. Technical Solutions Ensuring Fire Protection Of The Facility. The Scope Of The Subject Of The Order Includes In Particular: 1) Obtaining All Information Necessary For The Proper Design Process; 2) Obtaining The Necessary Arrangements And Opinions For The Implementation Of The Investment, Including Possible Deviations From The Technical And Health And Safety Conditions, In Particular Arrangements With The Fire Protection Expert; 3) Preparing An Inventory Of The Premises Of The Kindergarten Building, The Connector Building And The School Building; 4) Preparation Of Main Views, Possibly Other Necessary Sketches And Drawings Presenting The Adopted Design Solutions In The Field Of The Designed Fire Alarm System, Emergency Lighting, Smoke Removal System For Staircases And Horizontal Escape Route, Fire-Fighting Water Supply System, Provision Of Hand-Held Fire-Fighting Equipment And Installation And Construction Works Consisting Of, Among Others, On: Replacement Of Doors In Classes Ei60 And Ei30 And Windows (Fixed Glazing Or Glass Windows) In Class Ei 60 In The Kindergarten Rooms And The Connector, Plastering On A Mesh With A Thickness Of Min. 1.5 Cm On The Ceilings In The Basement Rooms Of The Kindergarten, Sectional Replacement Of The Buildings Insulation From Styrofoam With Mineral Wool, Installation Of The Eis 120 Fire Protection Cut-Off Flap On The Ventilation Duct In The Ceiling Between The Basement And The First Floor, Installation Of Installation Penetrations For Technical Installations In The Ei 120 Class Between Basement And The First Floor And Ei 60 Between The First And Second Floors; 5) Development Of A Complete Project For The Modernization Of The Kindergarten Building In Głuszyn In The Scope Of The Adopted Technical Solutions Ensuring Fire Protection, In Four Copies In Paper Form, In One Copy In Electronic Form On A Cd-R Disc In Word Or Pdf Format, In One Copy In Editable Form; 6) Selection Of Fire-Fighting Devices And Hand-Held Fire-Fighting Equipment Ensuring Fire Protection. According To The Solutions Proposed In The Technical Expertise;7) Development Of Fire Safety Instructions; 8) Preparation Of Investor Cost Estimates And Bills Of Quantities Divided Into Accepted Industries, Prepared In Accordance With Currently Applicable Legal Regulations, In Two Copies In Paper Form, In One Copy In Electronic Form On A Cd-R Disc In Pdf Format And In One Copy In An Editable Version In Ath Format; 9) Development Of Technical Specifications For The Execution And Acceptance Of Works In All Industries, Prepared In Accordance With Currently Applicable Legal Regulations In Two Copies In Paper Form, In One Copy In Electronic Form On A Cd-R Disc In Pdf Format And In One Copy In An Editable Version. The Documentation Must Include The Adopted Solutions At Scales Enabling The Presentation Of Details And Technical Solutions. Installation And Construction Drawings Must Have The Necessary Developments And Detailed Sections To Clearly Determine The Course Of The Installation In Space. The Contractor Should Ensure Inter-Industry Coordination Of All Projects. The Contractor Declares That The Documentation Will Be Agreed With The Ordering Party, Including At The Concept Stage, In Terms Of Functional, Material And Cost Solutions. The Contractor Ensures That The Documentation Will Not Infringe The Copyrights Of Other Persons Or Entities, And Will Also Be Free From Other Legal And Legal Defects. Physical, Which Could Result In The Ordering Partys Liability. The Ordering Party Gives The Contractor The Opportunity To Get Acquainted With The Area Where The Works Will Be Carried Out. The Design Documentation Must Include Information Whether The Description Of The Subject Of The Order Includes Social, Environmental Aspects Or Labels In Accordance With Art. 100 Section 1, 101 Section 1 And 104 Of The Act Of September 11, 2019, Public Procurement Law (Journal Of Laws Of 2023, Item 1605, As Amended). The Design Documentation Should Include Accessibility Requirements For People With Disabilities. The Subject Of The Order Should Be Performed In Particular In Accordance With: The Description Of The Subject Of The Order Specified In This Specification, The Act Of July 7, 1994 Construction Law (Journal Of Laws Of 2024, Item 725), The Act Of August 24, 1991. On Fire Protection (Journal Of Laws Of 2024, Item 275), Regulation Of The Minister Of Internal Affairs And Administration Of June 7, 2010 On Fire Protection Of Buildings, Other Buildings And Areas (Journal Of Laws Of 2023 Item 822), Regulation Of The Minister Of Internal Affairs And Administration Of July 24, 2009 On Fire-Fighting Water Supply And Fire Roads (Journal Of Laws Of 2009, Item 1030), Regulation Of The Minister Of Infrastructure Of April 12, 2002 On The Technical Conditions To Be Met By Buildings And Their Location (Journal Of Laws Of 2022, Item 1225), Regulation Of The Minister Of Development Of September 11, 2020 On The Detailed Scope And Form Of The Construction Project (Journal Of Laws Of 2022, Item 1679), Regulation Of The Minister Of Development And Technology Of December 20, 2021 On The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Functional And Utility Program (Journal Of Laws Laws Of 2021, Item 2454), Regulation Of The Minister Of Development And Technology Of December 20, 2021 On Determining The Methods And Basis For Preparing An Investors Cost Estimate, Calculating The Planned Costs Of Design Works And The Planned Costs Of Construction Works Specified In The Functional And Utility Program (Journal Of Laws Of 2021 Item 2458), Technical Expertise On The State Of Fire Protection For The Kindergarten Building Located In Głuszyn At Ul. Główna 115 By Janusz Krupa, Leszek Chirnowicz And Dariusz Bajno, Drawings, All Necessary Regulations In The Field Of Construction Law, Occupational Health And Safety As Well As Fire Protection And Environmental Protection And Applicable Standards, Applicable Polish Standards And The Principles Of Modern Technical Knowledge. Reasons For Not Dividing The Contract Into Parts: Excessive Technical Difficulties, Excessive Costs Of Contract Execution And Difficulties In Coordinating The Activities Of Various Contractors Implementing Individual Parts Of The Contract, Which Could Seriously Jeopardize The Proper Performance Of The Contract.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
22faf397-cbfc-45bf-b163-aa271d1b0070.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders