GTR 81140506

Tenders Are Invited For Modernization Of The Sports Hall At The Complex Of Educational And Upbringing Facilities

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
81140506
Tendering Authority
Subscribe to view
Tender No
WOA.272.10.2024.WI
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Modernization Of The Sports Hall At The Complex Of Educational And Upbringing Facilities
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
18-06-2024 Closed
Work Detail
1. The Subject Of The Order Is The Modernization Of The Sports Hall At The Complex Of Educational And Upbringing Facilities. Scope Of Works: 1) Disassembly Of Existing Window Joinery (Large Windows) – 7 Pieces And Door Joinery – 2 Pieces. 2) Walling Of Recesses After Dismantling The Windows - In Accordance With The Bill Of Quantities, 3) Plastering Of The Recesses After Bricking Up The Windows - In Accordance With The Bill Of Quantities, 4) Installation Of Window Joinery - Triple-Glazed Windows And Aluminum Door Joinery, 5) Replacement Of External And Internal Window Sills, 6) Dismantling , Painting And Reassembly Of Steel Elements,7) Disassembly, Renovation Of 10 Ladders And Reassembly,8) Disassembly Of 4 Existing Basketball Baskets, Reassembly Of 2 Baskets From Disassembly,9) Purchase, Delivery And Assembly Of 2 New Basketball Baskets, 10) Disassembly And Replacement Of The Parquet Floor - 50% Of The Surface To Be Replaced Was Assumed,11) Sanding And Varnishing Of The Parquet Floor Along With The Installation Of Plinth Strips And Filling The Gaps, 12) Painting The Pitch Lines,13) Dismantling And Replacement Of Radiators With Valves - In Accordance With The Bill Of Quantities,14 ) Purchase, Delivery And Installation Of Wooden Radiator Covers Made Of Solid Pine Wood. 25Mm, 15) Forging 6 Ventilation Grilles And Installing Them, 16) Partial Modernization Of The Electrical Installation With The Replacement Of The Distribution Box, Accessories And Lighting (Led Lamps Adapted For Installation In Gymnasiums), 17) Preparation Of Walls For Painting, 18) Works Painting - Emulsion Paint, Varnishing - Color To Be Agreed With The Investor At The Construction Stage,19) Bracing Cracked Walls - 10 Pieces.20) Purchase, Delivery And Installation Of Volleyball Sleeves,21) Cleaning After Completion Of Construction Works,22) Removal And Disposal Of Materials From Demolition. All Construction Works Should Be Performed In Accordance With Construction Practice And Technical Conditions To Be Met By The Buildings And Their Location. 2. A Detailed Description Of The Subject Of The Order And The Requirements For The Execution Of The Order Are Included In The Annexes To The Swz, I.E. - Annex No. 6 To The Swz - Description Of The Subject Of The Contract Along With The Bill Of Quantities, - Annex No. 7 To The Swz - Draft Provisions Of The Contract.3. Requirements Related To The Implementation Of The Order: 1) Guarantee And Warranty: The Contractor Will Provide A Warranty On The Subject Of The Order For A Period Of At Least 24 Months. The Warranty Period Starts From The Date Of Final Acceptance Of The Construction Works. The Warranty Period For The Subject Of The Contract Is The Criterion For Evaluating The Offers. The Method Of Evaluating The Offers In This Criterion Is Described In Part Xviii Of The Swz. The Contractor Will Be Liable To The Ordering Party Under The Warranty For The Subject Of The Contract For A Period Equal To The Warranty Period, Determined On The Basis Of The Contractors Offer (Within The Limits Described Above), But Not Shorter Than The Warranty Period Resulting From The Provisions Of The Civil Code. The Rules For The Use Of Guarantees And Warranties Are Specified In § 14 Of The Draft Provisions Of The Contract - Annex No. 7 To The Swz.2) Insurance: The Ordering Party Requires That The Contractor Has Valid And Paid Civil Liability Insurance For An Amount Not Lower Than The Gross Amount Throughout The Entire Order Execution Period. Remuneration Of The Contractor Under The Conditions Specified In § 13 Of The Draft Provisions Of The Contract, Constituting Annex No. 7 To The Swz.3) The Ordering Party Requires That The Contractor Has A Fleet Of Motor Vehicles (Within The Meaning Of Article 2 Point 33 Of The Act Of June 20, 1997 - Traffic Law Road) Used In The Performance Of A Public Task Had An Appropriate Number Of Electric Or Natural Gas-Powered Vehicles, Thus Meeting The Requirements Arising From The Provisions Of Art. 68 Section 3 In Connection With Art. 35 Section 2 Point 2 Of The Act Of January 11, 2018 On Electromobility And Alternative Fuels, Provided That The Execution Of The Order Requires The Use Of Motor Vehicles. The Share Of The Vehicles Referred To Above Is Calculated Using The Principle According To Which The Amount Of This Share Below 0.5 Is Rounded Downwards, And The Amount Of This Share Equal To 0.5 And Above Is Rounded Up.5. Equivalent Solutions: If The Requirements In The Description Of The Subject Of The Order Refer To A Trademark, Patent Or Origin, Source Or Specific Process That Characterizes Products Or Services Provided By A Specific Contractor, The Ordering Party Shall Indicate The Word Or Equivalent Everywhere And Allow The Possibility Of Submitting Equivalent Offers. If The Contractor Submits Proposals Equivalent To Those Described In The Description Of The Subject Of The Order (If Any), The Contractor Is Responsible For Demonstrating And Providing Proof That The Offered Supplies, Services And Construction Works Are Consistent With The Requirements Of The Ordering Party. Subject Means Of Evidence: The Ordering Party Requires The Contractor To Present In The Offer Proof Of Equivalence Confirming The Fulfillment Of The Criteria Indicated By The Ordering Party In Order To Assess The Equivalence Of The Products Or Services It Offers In Relation To Those Specified In These Studies, E.G. Technical Sheets Or Other Documents. If The Contractor Does Not Will Submit The Above-Mentioned Documents Or The Submitted Documents Are Incomplete (Thus Not Confirming The Equivalence Of The Offer In The Scope Described In The Description Of The Subject Of The Order), The Ordering Party Will Not Request Their Submission/Supplementation. If The Requirements In The Description Of The Subject Of The Order Refer To Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Or Other Reference Systems Referred To In Article 101 Section 1 Point 2 And Section 3 Of The Public Procurement Law, And Such References Were Not Accompanied By The Phrase Or Equivalent, The Ordering Party Allows Solutions Equivalent To Those Described In Each Such Standard, Technical Assessment, Technical Specification Or Technical Reference System. In Such A Case, The Contractor Will Present Proof Of Equivalence In The Offer In The Manner Specified In Art. 101 Section 5 And 6 Of The Public Procurement Law. If The Contractor Does Not Submit The Above-Mentioned Documents Or The Submitted Documents Are Incomplete (Thus Not Confirming The Equivalence Of The Offer In The Scope Described In The Description Of The Subject Of The Order), The Ordering Party Will Not Request Their Submission/Supplementation.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
63cf66a1-1e25-47a0-93a0-54ea5099b84d.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders