GTR 81008387
Tenders Are Invited For Expansion And Reconstruction Of The Water Treatment Plant In Gorłówka Along With The Construction Of Water Supply Networks In The Stare Juchy Commune
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
81008387
Tendering Authority
Subscribe to view
Tender No
SG.271.3.1.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Expansion And Reconstruction Of The Water Treatment Plant In Gorłówka Along With The Construction Of Water Supply Networks In The Stare Juchy Commune
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
17-06-2024
Closed
Work Detail
The Subject Of The Order Was Divided Into Two Parts. Part I - Expansion And Reconstruction Of The Water Treatment Plant In Gorłówka. Part Ii - Construction Of Water Supply Networks In The Stare Juchy Commune (2 Sections Of The Water Supply Network)1) Construction Of The Stare Juchy - Orzechowo Water Supply Network2) Construction Of The Bałamutowo - Laśmiady Water Supply Network Note: The Subject Of The Order Should Be Performed As Follows: Part I Of The Subject Of The Order In The Design And Build System. Part Ii Of The Subject Of The Order In The Design And Build System. The Subject Of The Order Is The Preparation Of Complete Construction Design Documentation And Then The Performance Of Construction Works For The Investment Project Entitled: Expansion And Reconstruction Of The Water Treatment Plant In Gorłówka Together With The Construction Of Water Supply Networks In The Stare Juchy Commune (For Part I And Part Ii) In The Scope Of All Industries Along With The Required Arrangements And Permits, Preparation Of An Application For A Building Permit And Obtaining On Its Basis In On Behalf Of The Ordering Party, A Building Permit Or Application In The Scope Of: A) Design - I.E., As Part Of The Contract Price, The Contractor Will Prepare For Each Of The Tasks: - Concept, - Construction Design (Pzt, Pa-B, Pt) Along With Obtaining A Building Permit/Application Works, Other Studies Required To Obtain A Building Permit/Notification, Approval Of Works, If Required By Law, Including: • Decision On The Environmental Conditions Of The Project, • Decision On The Location Of A Public Purpose Investment, • Water Law Permit For The Construction Of Water Facilities, Water Intake, Discharge Of Rinsing And Drainage Water (If Required), • Change Of The Decision Determining The Intake Resources, • Soil And Water Tests In The Investment Area, • Maps For Design Purposes, • Inventories And Expert Opinions On The Technical Condition Of The Rebuilt Facilities, • Energy Characteristics Of The Facilities , Making All Arrangements, Obtaining Opinions And Decisions On Behalf Of The Ordering Party, Together With A Building Permit, Necessary For The Design, Construction, Commissioning And Commencement Of Operation Of The Subject Of The Order, Operating And Commissioning Instructions, Safety And Health Protection Plan, Substantive Schedule -Financial Including The Selection Of Materials, The Sequence Of Works, Photographic Documentation Of The Area Transferred Before The Start Of The Works And The Areas Restored To Their Original State. B) Construction Of The Facility, Part I - Construction And Reconstruction Of The Water Treatment Plant In Gorłówka: The Scope Of Works Of The Construction Part At The Water Treatment Plant Area Includes : Separating A Chlorinator Room In The Technological Building, Construction Of A Foundation For A New Retention Tank, Construction/Installation Of A Foundation For The Existing External Power Generator, Construction Of A Shelter Over The Power Generator, Land Development: Access Roads, Access Roads, Fencing, Greenery. Scope Of Works For The Sanitary Part On The Premises Of The Water Treatment Plant Includes: - Construction Of External Technological Installations, - Installation Of A Steel Above-Ground Retention Tank For Treated Water With A Capacity Of 50M3 - 1 Pc., Replacement Of Deep-Well Pumps, Discharge Risers And Covers Of Above-Ground Casings For 2 Wells, Replacement Of Water Treatment System Elements, - Installation Of A System For Monitoring And Visualization Of Water Treatment Station Equipment, The Scope Of Works Of The Electrical Part In The Wwtp Area Includes: - Possible Adaptations Power Ordered Up To The Designed Value, Construction Of External And Internal Electrical Power Supply, Control And Lighting Installations, Construction Of Lightning Protection And Equalizing Installations, Use Of The Existing Generating Set From The Szr For The Needs Of The Rebuilt Station. Part Ii - Construction Of Water Supply Networks In The Stare Juchy Commune. Construction Of The Water Supply Network Stare Juchy – Orzechowo Water Supply Network Made Of Pe100rc Pipes Dn110 – L = 3,142.M. Water Supply Gate Valve Ø100 – 6 Pcs. Fire Hydrant – 2 Pcs. The Place Of Connection Of The Planned Water Supply Network In Stare Juchy Is The Existing Water Supply Network Ø100 In The Municipal Road. Plot No. 109 (Node W1). In The Town Of Orzechowo, Connection To The Ø100 Water Supply In Private Plot No. 161/10 (Node W2). Three Bolts Should Be Used In Both Nodes. The Network Should Be Equipped With A Column-Type Aeration And Venting Valve To Remove Unwanted Air From The Water Supply Network. Construction Of The Bałamutowo - Laśmiady Water Supply Network Pe100rc Pipeline Ø110x6.6 Sdr17 * L=794 Mb Gate Valve Ø100 * Pcs. 2 Connection To The Existing Water Supply Network Designed In Plot No. 31 (Node W1) And In Plot No. 11 (Node W2). The Designed Water Supply Network Should Be Made Of Pe100rc Pipes Ø110x6.6 (Blue) Connected By Welding. Fittings And Fittings Should Be Designed From Ductile Cast Iron With Flange Connections With A Seal Reinforced With A Steel Insert (Intended For Water). Connections Above Elements Should Be Made Using Universal Pipe And Flange Connectors Or Flange Sleeves. Screws, Nuts, Washers Made Of Stainless Steel. Installation And Construction Of A Section Of The Water Supply Network Under The Ditch Should Be Carried Out Using The Drilling Technology Guided By A Conduit Pipe. The Cover Of The Water Pipeline Should Be 1.80 M. The Water Supply Network Should Be Permanently Marked In The Trench With A Blue Warning Tape Placed 30 Cm Above The Designed Pipeline. The Route Of The Planned Network In Accordance With The Graphic Attachment. C) Ensuring Authors Supervision - I.E. Providing Authors Supervision By Designers (Design Authors) Throughout The Duration Of The Investment, In Particular Through: Possible Participation Of Designers In Working Meetings During The Implementation Of Construction Works (On The Construction Site), Entries In The Construction Log, Verification As-Built Documentation In Terms Of Its Compliance With The Actual Execution Of Works. Verification Of The Documentation Will Be Confirmed By A Statement From The Designers - Authors Of The Project, Attached To The As-Built Documentation. A Detailed Description Of The Subject Of The Order Is Included In Annex No. 12 To The Swz - Documentation.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
24e25583-96b2-4c49-8dfd-6622b2388b2e.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.