GTR 80918705
Tenders Are Invited For Modernization Of The Stadium In Małomice
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
80918705
Tendering Authority
Subscribe to view
Tender No
ZP.271.3.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Modernization Of The Stadium In Małomice
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
14-06-2024
Closed
Work Detail
Modernization Of The Stadium In Małomice, Involving The Use Of The Area As A Recreational And Sports Area. A 3-Track Athletics Track, 390 M Long, Should Be Constructed Around The Existing Football Pitch. A Roof Should Be Constructed Over Part Of The Existing Sports Stand, Located On The Slope On The Western Side Of The Pitch, In The Form Of A Steel Shed With A Shed Roof. In The South-Western Part Of The Area, A Football Training Pitch For Children Should Be Built. Stationary Goals With Dimensions Of 5.0 Mx2.0 M Were Designed On The Pitch. Additionally, For Childrens Games, It Will Be Possible To Purchase Portable Aluminum Goals With Dimensions Of 3.0 Mx1.55 M And Place Them In The Goal Area. In The North-Western Part Of The Plot, An Expansion And Reconstruction Of The Sports Locker Room Building Was Planned. The Expansion Involves Allocating Its Area To A Sanitary Facility Constituting Public Toilets, Which Includes A Vestibule, A Toilet And A Mens Washroom, As Well As A Toilet For Disabled People, Which Also Constitutes A Womens Toilet. The Remaining Part Of The Extension Will Include Utility And Storage Rooms Accessible From The Side Of The Existing Utility Room, Which Is The Judges Room. The Detailed Scope Of Works Is Included In The Design Documentation Attached To The Swz And In The Detailed Technical Specifications Prepared. The Bill Of Quantities Included In The Design Documentation And Attached To The Swz Is Of An Auxiliary Nature And Cannot Constitute The Only Basis For Pricing The Offer. The Contractor Is Obliged To Carefully Check And Estimate The Amount Of Required Works In Accordance With The Requirements Of The Ordering Party And The Design Documentation. The Contractor Is Obliged To Purchase A Petrol Brushcutter. Due To The Fact That The Remuneration For The Execution Of The Works Contract Will Be A Lump Sum, In The Event Of A Larger Quantity Of Specific Works Included In The Project Included In The Project In Any Bill Of Quantities Item During The Works, It Cannot Be Considered As Additional Works With Requesting Additional Remuneration. Any Lack Of Necessary Works Resulting From The Design Documentation In The Bill Of Quantities Does Not Release The Contractor From The Obligation To Perform Them Based On The Design At A Lump Sum Price. Due To The Above, The Contractor Cannot Refer To Any Deficiencies In The Bill Of Quantities And Demand An Increase In Remuneration Based On Them. If Any Discrepancies Are Noticed Between Individual Elements Of The Design Documentation, The Contractor Is Obliged To Ask The Ordering Party For Clarification Before Submitting The Offer, Because As Part Of The Remuneration Given In The Offer, The Contractor Is Obliged To Perform All Necessary Works Provided For In Any Of The Documents Constituting An Annex To The Swz. The Contractors Offer Should Include All Necessary Works To Ensure Proper Execution Of The Subject Of The Order. It Is Prohibited To Use Materials That Do Not Meet The Requirements Of Pn-En Or Equivalent And With Parameters Worse Than Those Specified In The Design; Note! The Ordering Party Reserves The Right To Invalidate The Public Procurement Procedure Entitled Modernization Of The Stadium In Małomice, In The Absence Of One Of The Two Required Valid Partial Offers. If The Ordering Party, In The Design Documentation Or In Any Other Document Relating To The Subject Of The Contract, Refers To Trademarks, Patents, The Origin Of The Product Or Its Source, Then Such Indication Is Accompanied By The Words Or Equivalent. Or Equivalent Should Be Understood As Material, Equipment, Equipment With Parameters, Quality Of Workmanship And Production Technology Not Worse Than Those In The Description Of The Subject Of The Contract Specified In The Design Documentation Constituting The Swz, And Relating To The Indicated Material, Equipment, Equipment.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
41a99b7d-4e4c-4e6d-9be6-28f8ab56e2bb.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.