GTR 80879666
Tenders Are Invited For Adaptation Of The Municipal Office Building At Ul. Nadgoplańska 4 To The Requirements Of Fire Safety Regulations
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
80879666
Tendering Authority
Subscribe to view
Tender No
PIFZ-Z.271.18.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Adaptation Of The Municipal Office Building At Ul. Nadgoplańska 4 To The Requirements Of Fire Safety Regulations
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
11-06-2024
Closed
Work Detail
Common Procurement Dictionary: Cpv 45343000-3 Fire Protection Installation Works. Ordering Party: Kruszwica Commune. Order Completion Date: Completion Date: 5 Months From The Date Of Conclusion Of The Contract. Subject Of The Order: The Subject Of The Investment Intention Is To Adapt The Building Of The Municipal Office In Kruszwica To The Requirements Of Fire Protection Regulations. It Is A Facility With One Underground Floor (Basement) And Three Above-Ground Floors (Ground Floor, First Floor, Attic). The Eastern Part (Segment A) Built In The Second Half Of The 20Th Century. The Western Part Of The Building (Segment B) Added In 2017. Characteristic Numerical Data Of The Building:• Volume - 10,140.40 M3• Development Area - 960.44 M2• Usable Area - 2,274.86 M2 Area Basement - 775.00 M2 Area Ground Floor - 811.27 M2 Area Floors - 688.59 M2• Internal Area - 2,502.61 M2 Area Basement - 874.87 M2 Area Ground Floor - 882.57 M2 Area Floors - 745.17 M2• Total Area - 2,777.13 M2• Building Height - 17.08 M• Building Length - 50.91 M• Building Width - 36.94 Mthe Works Constituting The Subject Of The Order Include: - Securing Wooden Elements Construction, Floor Boards Of The Non-Usable Attic Of The B Segment Accessible From The Interior With A Fire Retardant Ensuring The Reaction To Fire Class B-S2, D0, - Closing The Non-Usable Attic In The A Segment And The B Segment With Doors And An Entrance Flap Of The Class Fire Resistance Ei 30, - Replacement Of The Lighting Lamp With A Lamp With Protection Class Ip-65, - Replacement Of Rooflights No. 1 And No. Condition Of Non-Spread Of Fire For Broof Roof Coverings (T1), - Impregnation Of All Curtains In The Building Rooms, I.E. The Session Hall, Wedding Hall, With An Impregnating Agent To The Degree Of Non-Flammability, - In The Server Room (No. 1/13 And 1/30) Securing All Existing Penetrations Installations With A Diameter Greater Than 0.04 M In Walls And Ceilings Up To Fire Resistance Class Ei 60 And Equipped With Aspirating Smoke Detectors With Early Warning Class A, - Closing The Elevator Machine Room Of The Staircase K2 With Doors With Fire Resistance Class Ei 30 (Doors Existing) With The Replacement Of The Ventilation Grille With A Fire Cut-Off Flap With Fire Resistance Class Eis 30, Activated By The Fire Alarm System, Regardless Of The Thermal Trigger Used, - Enclosing The Attic Of The Unused Segment A From The Side Of The Staircase K4 With Partition Walls In Plasterboard System With Fire Resistance Class Ei 60 To The Existing Roof Covering And Closing With Doors With Fire Resistance Class Ei 30, - Door Equipment In Rooms No. 0/16, 1/30, 1/27, 2/10, 2/11 , 2/12, 2/22, 2/24, 2/27, Which, When Fully Opened, Narrow The Width Of The Escape Route With Devices That Automatically Close Them, - Closing The Basement Within The Staircases K1 And K4 With Doors Of Fire Resistance Class Ei 30 And Securing The Descent To The Basement Level From The Ground Floor In The Staircase K2 With A Movable Barrier In A Way That Prevents People From Accidentally Going Down To The Basement In The Event Of Evacuation, - Equipping All Horizontal And Vertical Escape Routes On Each Floor With Emergency Evacuation Lighting Intensity Of Not Less Than 2 Lx In The Road Axis, At Least 5 Lx In The Case Of Fire Protection Devices That Are Activated When The Electric Power Supply To The Basic Lighting Fails, With An Operating Time Of Not Less Than One Hour, - Equipping All Emergency Exits From Horizontal Escape Routes Leading To The Outside Of The Building, W1, W2, W3 And W4 With Illuminated Evacuation Signs. - Protection Of Culverts With A Diameter Larger Than 0.04 M, Passing Through The Walls And Ceilings Of The Boiler Room [Room. No. 0/13], Server Room [Room No. 1/13 And No. 1/30], And The Crane Machine Room [Room No. 0/33] To Fire Resistance Class Ei 60, - Casing Of The Electrical Switchboard At The Entrance W1 With Non-Flammable Materials, - Installation Of A Priority Valve Preventing Uncontrolled Outflow Of Water From The Installation With Water Supply From The Fire-Fighting Water Supply Network, Sanitary Utensils For The A Segment, - Installation Fire Alarm With Full Protection, With Acoustic Voice Alarms In The Corridors And Manual Fire Alarms (Rop) On Each Floor, Near The Staircases, - Ensuring The Transmission Of The Explosion Risk Alarm Signal In The Building To The Services Obliged To Take Effective Preventive Action.2. A Detailed Description And Scope Of Work Is Presented In The Design Documentation: 1) Architectural And Construction Design: Adaptation Of The Municipal Office Building At Ul. Nadgoplańska 4 In Kruszwica To The Requirements Of Fire Safety Regulations.2) Executive Design Adaptation Of The Building Of The Municipal Office At Ul. Nadgoplańska 4 In Kruszwica To The Requirements Of Fire Safety Regulations.3) Technical Specification For The Execution And Acceptance Of Works Adaptation Of The Building Of The Municipal Office At Ul. Nadgoplańska 4 In Kruszwica To The Requirements Of Fire Safety Regulations”4) Bill Of Quantities.3. Guidelines For The Contractor: A) Ordering Party Pursuant To Art. 121 Point 1 Of The Public Procurement Law Reserves The Obligation For The Contractor To Personally Perform Key Tasks, I.E. Implementation Of The Ssp Fire Alarm System. B) Indications Of The Origin Of Products Used In The Design Documentation And Technical Specifications For The Execution And Acceptance Of Works Serve To Determine The Standards Of Technical And Quality Characteristics. The Contractor May Use The Indicated Or Equivalent Other Product Meeting The Technical And Quality Requirements And Having Functional Properties Not Worse Than Those Specified In The Ordering Partys Documentation, With Preference For More Favorable Parameters Meeting The Same Quality, Functional And Technical Requirements Of The Indicated One And Having Functional Properties Meeting The Requirements Specified For The Item Described In Documentation. The Contractor Who Refers To Solutions Equivalent To Those Described By The Ordering Party Is Obliged To Demonstrate That The Supplies, Services Or Construction Works Offered By Him Meet The Requirements Specified By The Ordering Party. C) The Contractor Is Obliged To Develop And Submit To The Ordering Party A Material And Financial Schedule Specifying The Sequence Of Execution Works And The Dates Of Commencement And Completion Of Individual Elements Of The Works Within 5 Business Days From The Date Of Conclusion Of The Contract. With The Consent Of The Parties, The Schedule May Be Updated During The Implementation Of The Subject Of This Contract. D) The Contractor Is Obliged To Agree On All Aesthetic Values With The Ordering Party. E) The Contractor Is Obliged To Test The Impregnation Of The Curtains On A Small Element Before Starting The Actual Impregnation Of The Curtains. F) The Works Will Be Carried Out Located In An Operational Facility, The Contractor Will, If Possible, Carry Out The Work In A Way That Does Not Interfere With Customer Service. Before It Is Necessary To Exclude Specific Rooms From Use, The Contractor Is Obliged To Notify About This Fact 5 Days Before Starting Work In The Room. G) The Contractor Is Obliged To Secure The Place Of Work And Restore The Area To Its Previous Condition. Any Damage Resulting From Failure To Secure The Ordering Partys Property Is Borne By The Contractor.H) Detailed Information Includes Technical Documentation, Construction Designs And Technical Specifications For The Execution And Acceptance Of Works, While Bills Of Quantities Are Auxiliary Elements.I) The Ordering Party Requires The Submission Of An Offer Cost Estimate To The Contract.4. Requirements Of The Ordering Party In Connection With Art. 95. Of The Public Procurement Law: The Ordering Party Requires The Contractor Or Subcontractor To Employ, Under An Employment Contract, Persons Performing All Activities Included In The So-Called Direct Costs Under An Employment Contract. This Requirement Applies To Persons Who Perform Activities Directly Related To Construction Works In The Implementation Of The Subject Of The Order In The Number Of People Necessary To Perform The Subject Of The Order, Including: Construction Worker - Electrical Work, If The Performance Of These Activities Involves Performing Work Within The Meaning Of The Provisions Of The Labor Code, Unless These Activities Are Performed By A Person As Part Of A Business Activity. Detailed Requirements In Connection With Art. 95 Of The Public Procurement Law Were Included In §24 Of The Contract Template.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
0a6ca51f-2ad6-4863-acf0-3bce0e59537e.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.