GTR 80879540

Tenders Are Invited For Investor Supervision Over The Investment Titled Carrying Out Post-Consolidation Development As Part Of The Implementation Of The Operation Titled Consolidation Of Land In The Antopol District, Podedwórze Commune, ... - Construction Of An Additional Road

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
80879540
Tendering Authority
Subscribe to view
Tender No
AZ-VII.272.12.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Investor Supervision Over The Investment Titled Carrying Out Post-Consolidation Development As Part Of The Implementation Of The Operation Titled Consolidation Of Land In The Antopol District, Podedwórze Commune, ... - Construction Of An Additional Road
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
04-06-2024 Closed
Work Detail
1. The Scope Of The Order Includes Supervision Of Construction Works Consisting In The Construction Of Municipal Roads And Agricultural Transport, Together With The Construction And Reconstruction Of Culverts, Desilting And Clearing Drainage Ditches (Drainage Devices). The Task Is Related To The Implementation Of Post-Consolidation Land Development As Part Of The Consolidation Of Land In The Antopol District, Commune. Podedwórze, Parczew County, Lublin Voivodeship - Construction Of An Additional Road. The Detailed Scope Of Works Subject To Supervision Is Included In Annex No. 1 To Swz. The Scope Of Supervision Will Include: A) Verification Of The Design Documentation And Its Possible Changes And Additions During The Implementation Of The Works, Its Completeness, Mutual Compliance, Verification Of The Results Of Control Calculations In Order To Find Possible Errors Before Commencing Construction Works, And Its Possible Changes And Additions During The Implementation Of The Works, B) Arriving At Each Justified Request Of The Ordering Party Or The Contractor Of The Works Subject To Supervision And Visiting The Construction Site In During The Physical Implementation Of Construction Works At Least Once A Week, C) Representing The Ordering Party On The Construction Site By Checking The Compliance Of Its Implementation With The Project, Regulations And Applicable Standards And Principles Of Technical Knowledge, And Checking The Quality Of The Works Performed, Built-In Products, And In Particular Preventing The Use Of Defective Products And Not Approved For Trading And Use In Construction, D) Checking And Acceptance Of Works That Are Covered Or Disappearing And Participation In The Activities Of Acceptance Of Finished Building Structures And Putting Them Into Use, E) Confirmation Of Actually Performed Works And Removal Of Defects, As Well As Controlling Construction Settlements, F ) Issuing Instructions To The Construction Manager, Confirmed By An Entry In The Construction Log, Regarding: Removal Of Irregularities Or Threats, As Well As Works Or Hidden Elements Requiring Discovery, And Presenting Expert Opinions On The Ongoing Construction Works And Evidence Of Approval For The Use Of Construction Products In Construction, G) Suspending Construction Works In The Event Of Conducting Them Contrary To The Contract And Occupational Health And Safety Regulations And Immediately Notifying The Ordering Party Of This Fact, H) Approving Materials Consistent With The Requirements Of Stwior From Sources Indicated By The Contractor Of Construction Works, I) Deciding On The Approval Of The Use Of Materials Certified By The Manufacturer, J) Controlling The Method Of Storage And Storage Of Materials And Tidying Up Storage Areas After Completion Of The Works, K) Participation In Measurements, Tests And Sampling Confirmed In The Sampling Or Testing Protocols; Assessing The Results Of Tests And Measurements And Providing Written Confirmation Of Compliance With Stwior By The Supervision Inspector Competent For A Given Industry, L) Requesting The Construction Manager To Make Corrections Or Re-Performing Defectively Performed Works, As Well As Suspending Further Construction Works If Their Continuation Could Cause A Threat Or Cause Unacceptable Non-Compliance With The Design Or Construction Permit, M) Verification Of The Contractors Cost Estimate Settlements In Terms Of Valuation Principles And Methods, N) Control Of Measurements And Their Confirmation, O) Ensuring That The Construction Site Is Secured By The Contractor Of Construction Works In The Event Of Withdrawal From The Contract For Construction Works, P) Immediately Informing The Ordering Party About Any Claims Of The Construction Contractor, Events On The Construction Site Regarding, E.G. Health And Safety, Q) Making Entries In The Construction Log, R) Participating In The Work Of The Final Acceptance Committee, Inspections Carried Out By Construction Supervision And Other Bodies Authorized To Inspection And Ensuring The Implementation Of The Findings And Decisions Made During The Inspection, S) Organizing Technical/Construction Councils, At Least Once A Month (In Which The Works Are Carried Out), T) Monitoring The Timeliness Of The Works, Informing The Ordering Party About The Progress Of Construction Works And Immediately Informing The Ordering Party About Any Circumstances That May Affect The Extension Of The Investment Implementation Deadline, Changes Or The Need To Perform Works That May Have Economic Consequences For The Ordering Party, U) If Necessary, At The Request Of The Ordering Party, Preparing Photographic Documentation (In Digital Technology) Of The Progress Of Work, V ) Giving Opinions On The Need To Perform Works And Possible Alternative, Additional Or Complementary Solutions, W) Preparing, In Consultation With The Ordering Party, Reports On The Need To Perform Additional, Supplementary Or Replacement Works And, If Necessary, Developing The Necessary Executive Documentation, X) Participating In Committees, Meetings And Conferences In During The Implementation Of The Works And During The Warranty And Guarantee Period, Y) Coordination Of Contacts Between The Ordering Party And The Contractor Of Construction Works, Z) Carrying Out Current Inventories, Aa) Confirming The Date Of Completion Of The Works, Bb) Monitoring The Execution And Checking The As-Built Documentation.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
dd3d7292-d916-4e5a-a338-8991305b18cf.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders