GTR 80849842
Tenders Are Invited For Renovation Of Ul. Stefana Jaracza On The Section From Ul. Jana Kilińskiego To Ul. Eastern Together With The Intersection Divided Into 2 Tasks
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
80849842
Tendering Authority
Subscribe to view
Tender No
ZIM-DZ.2620.45.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Renovation Of Ul. Stefana Jaracza On The Section From Ul. Jana Kilińskiego To Ul. Eastern Together With The Intersection Divided Into 2 Tasks
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
11-06-2024
Closed
Work Detail
1. The Subject Of The Order Is The Performance Of Construction Works Consisting In The Renovation Of The Street Surface. Stefana Jaracz On The Section From Ul. Jana Kilińskiego To Ul. Eastern Together With The Intersection In Łódź.2. In The Scope Of Construction Works Covered By The Subject Of The Order, The Following Scope Of Work Should Be Specified: Task 1: Renovation Of Ul. Stefana Jaracz On The Section From Ul. Jana Kilińskiego To Ul. Eastern Without An Intersection 1. Linear Measurements During Earthworks, 2. Maintenance Of Public Traffic And Maintenance Of Existing Facilities During The Contract Implementation Period Until The Final Acceptance Of The Works, 3. Manual Demolition Of Clinker Cubes Along With Cleaning And Palletizing For Re-Installation, 4. Manual Demolition Granite Cubes Along With Cleaning And Palletizing For Re-Installation, 5. Manual Dismantling Of Granite Slabs Along With Cleaning And Palletizing For Re-Installation, 6. Mechanical Dismantling Of The Aggregate Sub-Base, 7. Mechanical Dismantling Of The Binder-Stabilized Sub-Base, 8. Dismantling Of The Improved Substrate From The Unbound Mixture , 9. Dismantling Stone Retainers On A Cement-Sand Base, 10. Removing Road Sign Boards, 11. Protection Of Trees And Bushes During Construction, 12. Mechanical Profiling And Compaction Of The Subgrade For The Construction Layers Of The Pavement, 13. A Layer Of Improved Subgrade Made Of Cement-Stabilized Aggregate , 14. Base Layer Of Cement-Stabilized Aggregate, 15. Base Layer Of Cement Concrete Of Strength Class C30/37 With Dispersed Reinforcement, 16. Construction Of The Surface From Clinker Cubes, 17. Construction Of The Surface From Granite Cubes, 18. Construction Of The Surface From Granite Slabs, 19. Execution Of Expansion Joints, 20. Execution Of Expansion Joints For Cast Iron Elements With Bituminous Tape, 21. Arrangement Of Retainers And Construction Of Concrete Footings, 22. Execution Of Traffic Safety Elements And Separators, 23. Reconstruction Of Induction Loops, 24. Vertical Adjustment Of Manholes And Rainwater Inlets , 25. Post-Construction Measurement Of Completed Road Structures, Task 2: Renovation Of The Intersection Of Ul. Stefan Jaracz From Ul. Eastern” 1. Linear Measurements During Earthworks, 2. Maintenance Of Public Traffic And Maintenance Of Existing Facilities During The Contract Implementation Period Until The Final Acceptance Of The Works, 3. Manual Demolition Of Cut And Split Granite Cubes Along With Cleaning And Palletizing For Re-Building, 4. Demolition Manual Removal Of Basalt Cubes Along With Cleaning And Palletizing For Re-Installation, 5. Mechanical Dismantling Of The Aggregate Sub-Base, 6. Mechanical Dismantling Of The Binder-Stabilized Sub-Base, 7. Dismantling Of The Improved Substrate Made Of Unbound Mixture, 8. Dismantling Of Stone Retainers On Cement-Sand Sub-Base, 9. Removal Of Road Sign Boards, 10. Protection Of Trees And Bushes During Construction, 11. Mechanical Profiling And Compaction Of The Subgrade For The Construction Layers Of The Pavement, 12. A Layer Of Improved Subgrade Made Of Cement-Stabilized Aggregate, 13. A Layer Of Basic Foundation Made Of Cement-Stabilized Aggregate, 14. Layer Basic Foundation Made Of Cement Concrete Of Strength Class C30/37 With Dispersed Reinforcement, 15. Construction Of The Surface From Cut-And-Split Granite Cubes, 16. Construction Of The Surface From Basalt Cubes, 17. Construction Of Expansion Joints, 18. Construction Of Expansion Joints For Cast Iron Elements With Bituminous Tape, 19. Arrangement Of Resistors And Construction Of Concrete Footings, 20. Construction Of Traffic Safety Elements, 21. Reconstruction Of Induction Loops, 22. Vertical Adjustment Of Manholes And Rainwater Inlets, 23. Post-Construction Measurement Of Completed Road Structures, 3. The Order Must Be Completed In Accordance With The Design And Description Of The Subject Of The Order And On The Terms Specified In The Contract Template Constituting An Annex To The Swz. The Bill Of Quantities Is An Auxiliary Document Enabling Contractors To Calculate The Price For Construction Works That Are The Subject Of The Contract. The Lists Included In The Bill Of Quantities Illustrate The Scale Of Construction Works And Constitute Assistance In Estimating The Subject Of The Contract. 4. If The Trade Names Of Materials Are Used In The Procedure Documents (In Particular In The Bills Of Quantities), The Ordering Party Allows The Use Of Other Materials With The Same Or Better Quality Parameters As Those Specified By The Ordering Party. 5. The Execution Of The Order Is Subject To Polish Law, In Particular The Act Of July 7, 1994 Construction Law (Consolidated Text: Journal Of Laws 2023, Item 682), The Act Of April 23, 1964 Civil Code (Consolidated Text: Journal Of Laws .2023 Item 1933). 6. As Part Of The Order, The Contractor Will Be Obliged To Perform The Works In Accordance With The Attached Design And Bills Of Quantities Constituting An Annex To The Swz, Technical Requirements Included In State Standards And Other Regulations Regarding The Execution Of Works And Their Final Acceptance, Technical Specifications For The Execution And Acceptance Of Construction Works. 7. In The Subject Of The Contract, The Ordering Party Will Require The Contractor To: Carry Out Construction Works Under The Strict Supervision Of Authorized Persons With Construction Qualifications To Manage Construction Works Without Restrictions In The Road Engineering Specialty Specified In The Swz And Belonging To The Appropriate Chamber Of Professional Self-Government And With The Participation Of The Investors Supervision Inspector Appointed By The Ordering Party, The Use Of Materials And Products Approved For Trading And Use In Construction, The Warranty Period For The Completed Construction Works Min. 60 Months, Responsibility For Compliance With Occupational Health And Safety Regulations When Performing Construction Works - In Accordance With The Regulation Of The Minister Of Infrastructure Of February 6, 2003 On Occupational Health And Safety During The Performance Of Construction Works (Journal Of Laws No. 47, Item 401, As Amended). Amended), Responsibility For The Quality Of The Works Performed And Their Compliance With The Documentation, Responsibility For Compliance With Fire Protection Regulations, Liability For All Damages Resulting From The Works Carried Out, Compliance With The Rights Of Third Parties, As Any Disputes Arising Therefrom May Be Resolved On The Basis Of Judicial Proceedings In Common Courts. Work Schedule The Contractor Is Obliged To Submit A Material And Financial Schedule For The Scope Of The Project To The Ordering Party For Approval Within 14 Days From The Date Of Conclusion Of The Contract. Details Regarding The Form And Scope Of The Material And Financial Schedule Are Included In The Contract Template Which Is An Annex To The Swz. Details Regarding The Form And Scope Of The Material And Financial Schedule Are Included In The Contract Template Which Is An Annex To The Swz... (Continued In Swz, Chapter I, Section 1, Point 4.7) The Ordering Party Described The Subject Of The Order Using Design Documentation And Technical Specifications For The Execution And Acceptance Of Construction Works (Stwiorb) Constituting Annex No. 1 To The Swz (Opz) And The Contract Template Constituting Annex No. 2 To The Swz.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
dabb82e6-86cf-4abb-88d1-5f31fb848d36.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.