GTR 80849831

Tenders Are Invited For Reconstruction Of The Primary School Building In Koźminiec Along With The Location Of Kindergarten Classes

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
80849831
Tendering Authority
Subscribe to view
Tender No
ZPI.271.1.3.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Of The Primary School Building In Koźminiec Along With The Location Of Kindergarten Classes
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
11-06-2024 Closed
Work Detail
The Subject Of The Order Is The Reconstruction Of The Primary School Building In Koźminiec, Including The Location Of Kindergarten Classes. The Subject Of The Order Is The Reconstruction Of The Existing Building Of The Public School Complex In Koźminiec, Including The Reconstruction Of The Staircase, Ceilings And Internal Walls In Order To Adapt The Unused Attic Into 2 Classrooms And Create 2 Kindergarten Classes On The Ground Floor. Building. The Investment Is Located In Koźminiec, On Geodetic Plot No. 217/1. The Plot Has Access To Public Road No. 204 Through The Existing Exit To The Plot. A Gymnasium Building With A Connector Is Currently Under Construction On The Investment Site, According To A Separate Study. As Part Of The Task, The Contractor Will Perform, Among Others: A) Construction Works Attic Ceiling Rei60 Designed Protection Of The Ceiling Above The Attic With Housing Elements Up To The Fire Resistance Class Rei60.Strop Designed Prefabricated, Sectional, Beam-And-Slab Alloy. Reinforced Concrete Stairsdesigned Monolithic Reinforced Concrete Stairs.Windows - Non-Openable Slotsit Is Planned To Replace The Existing Windows In The Fire Separation Walls At The Border Of The Plot With Non-Opening Transoms. External Wooden/Aluminum Window Joinery - Colors Consistent With The Existing Ones. Total Heat Transfer Coefficient Not Greater Than U= 0.9 W/M2k. Door Joineryinterior Doors - Pvc Joinery And Panel Doors, Non-Rebated Door Frame; Stainless Steel Door Handles And Patent Inserts - As Agreed By The Investor. Exterior Sills According To The Selected Window System, E.G. Made Of Galvanized And Coated Steel Sheet With Soundproofing. Interior Sills Mdf, Smooth, White, Matte With Rounded Edge. Staircase Railings And Wall Handles Balustrades, 1.10 Cm High. Basic Load-Bearing Elements And Balustrade Handrails Made Of Steel Pipes With A Diameter Of 50 Mm, With Filling Meeting The Conditions For Transferring Horizontal And Other Forces Specified In The Pn. The Filling And Balustrade Structure Are Powder-Coated In A Color Consistent With The Adopted Color Scheme. Sanitary Cabin Construction In Bathrooms, Cabins Made Of System Aluminum Profiles For Toilet Cabins Filled With Waterproof Hpl Boards, Finished With System Accessories. Cabins Equipped With Accessories Ensuring A Safe Finger System. The Height Of The Cabins Should Be Adjusted To The Needs Of Pre-School Children. B) Electrical Installations Change Of Power Supply To Existing Switchgears, Emergency Lighting, Evacuation Lighting, Turn Signals) Sanitary Installationsinternal Water Installation. - Kan.Installation Of Mechanical Ventilation. The Investment Will Take Place On The Premises Of An Operating Educational Facility, During The School Year. The Contractor Is Obliged To Make Every Effort To Secure The Construction Site And Technical Facilities Against Uncontrolled Intrusion By Unauthorized Persons, Especially Children. Equipment Elements, I.E. Staircases With Handrails, Gymnastic Ladders, Etc., Which Will Be Dismantled As Part Of The Investment Should Be Protected Against Destruction And Placed On The Plot Where The Investment Is Being Implemented In The Place Indicated By The Ordering Party. The Required Warranty Period Granted By The Contractor For Construction Works Must Be At Least 36 Months From The Acceptance Of The Construction Works By The Ordering Party And The Signing Of The Final Protocol. Warranty For The Device - According To The Manufacturers Guidelines. The Contractor Will Perform The Subject Of The Contract In Accordance With The Design Documentation And The Construction Permit Constituting Annexes No. 10, 11 And 13 To The Swz. The Ordering Party Additionally Provides The Bill Of Quantities And The Offer Cost Estimate In Annexes No. 12 To The Swz, But Also Provides The Basis For Calculating The Offer Constitutes Project Documentation, As The Remuneration Is A Lump Sum. All Construction Works Must Be Carried Out In Accordance With The Technical Conditions And Health And Safety Rules Applicable In Construction, And The Area Must Be Secured Against Unauthorized Access And A Construction Information Board Must Be Placed In A Visible Place. The Required Warranty Period Granted By The Contractor For Construction Works Must Be At Least 36 Months From The Acceptance Of The Construction Works By The Ordering Party And The Signing Of The Final Protocol. Warranty For The Device – According To The Manufacturers Guidelines.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
7c3df45b-eff0-4714-ad5c-c180272bdac5.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders