GTR 80799031
Tenders Are Invited For Modernization Of The Sewage Treatment Plant In Straszków And The Water Treatment Plant In Kłodawa
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
80799031
Tendering Authority
Subscribe to view
Tender No
RZP.271.5.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Modernization Of The Sewage Treatment Plant In Straszków And The Water Treatment Plant In Kłodawa
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
10-06-2024
Closed
Work Detail
1. The Subject Of The Order Is The Preparation Of Complete Design Documentation Along With Construction Works For The Sewage Treatment Plant In Straszków And The Water Treatment Plant In Kłodawa As Part Of The Task Titled: Modernization Of The Sewage Treatment Plant In Straszków And The Water Treatment Plant In Kłodawa.2. The Investment Will Be Implemented In The Design And Build Formula.3. The Scope Of The Contractors Services Includes: 1) Development Of Design Documentation In Accordance With The Functional And Utility Program - Hereinafter Referred To As Pfu (Appendix No. 7 To Swz), Containing A Construction Design Developed In Accordance With The Act Of July 7, 1994, Construction Law (Consolidated Text: Journal Of Laws Of 2024). R., Item 725), Regulation Of The Minister Of Infrastructure Of September 11, 2020 On The Detailed Scope And Form Of The Construction Project (Consolidated Text: Journal Of Laws Of 2022, Item 1679, As Amended) And In Accordance With The Regulation Of The Minister Of Development And Technology Of December 20, 2021 On The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Functional And Utility Program (Journal Of Laws Of 2021, Item 2454) - In Paper Form (4 Copies) And In Electronic Form On A Cd/Dvd (2 Copies) And On A Pendrive (2 Copies);2) Obtaining All Legally Required Decisions, Opinions, Arrangements And Checks Of Project Documentation, To The Extent Resulting From The Provisions Of The Act, Including: Of: July 20, 2017, Water Law (Consolidated Text: Journal Of Laws Of 2023, Item 1478, As Amended), April 27, 2001, Environmental Protection Law (Consolidated Text: Journal Of Laws Of 2024, Item 54) , Construction Law, Together With Implementing Acts And All Other Not Mentioned, But Necessary And Necessary For The Proper Implementation Of The Order For The Planned Project; 3) Obtaining A Building Permit Or Reporting The Intention To Perform Construction Works (In Accordance With The Conditions Arising From The Construction Law); 4) Performance Of Construction Works Based On Design Documentation Developed In Accordance With The Ffu;5) Provision Of Surveying Services;6) Obtaining On Behalf Of The Ordering Party A Permit To Use The Completed Investment, All Other Decisions, Arrangements And Notifications Necessary For The Operation And Operation Of Facilities, Devices And Installations;7) Staff Training.4. Technological Elements Included In The Scope Of Work: 1) Water Treatment Plant In Kłodawa - Stage Ia) Demolition Works - Demolition Of Elements Inside The Existing Four Reinforced Concrete Open Chambers With Dimensions Of 5 X 8 M In Plan And A Height Of 2.7 M Each, B) Construction Of A New Settling Tank Inside Existing Chambers - Four Open, Reinforced Concrete Chambers With Internal Dimensions Of 7.6 M X 4.6 M And A Height Of 2.5 M, C) The Required Total Capacity Of The Rinsing Water Settler After Construction Is To Be 87.4 M3 Of One Chamber, While The Total Capacity Of The Entire Clarifier - 350 M3, D) The Above-Defined Capacity Of One Chamber Results From The Need To Ensure The Discharge Of Rinse Water From Rinsing Two Filters At The Same Time, E) Disassembly And Installation Of New Fittings - Gate Valve On The Inlet Pipelines Dn 250 With An Electric Drive - 4 Pieces Installed In Concrete Wells And A Dn 250 Gate Valve With An Electric Drive On The Outflow From Each Chamber - 4 Pieces Installed In Concrete Wells, A Dn 250 Flanged Gate Valve Installed In A Concrete Well, F) Replacement Of Pipelines, Inlet Pipe Made Of Pvc-U Dn 250 On The Section From The W-0 Junction For Each Settling Tank Chamber And Drainage Pipelines With A Length Of Approximately 55 M, G) Replacement Of A Section Of The Drain Water Pipeline From Dn 250 Contact Tanks Made Of Pvc-U Sn 8 Pipes With A Length Of Approximately 25 M Along With The Installation Of A Dn 250 Flanged Gate Valve In A Concrete Well, H ) Disassembly Of Dn 250 Gate Valves Installed In The Ground On Drain Water Pipelines From Contact Tanks K1 - K7, I) Installation Of Dn 250 Flanged Gate Valves K1 - K7 In Concrete Wells, J) Construction Renovation Of The Staircase With Hall, Entrance Corridor And Hall Of The First Floor Consisting Of Painting The Walls, Covering The Floor And Stairs With Terracotta, Replacing The Railings On The Stairs, K) Replacing The Doors Between The Corridor And The Staircase Hall. Removal Of Glazing On A Steel Structure, Building A Wall And Installing A Door With A Width Of Min. 1.5 M, L) Replacement Of Lighting (Lamps), M) Demolition Of Existing Casings At The Entrance To Brick Expansion Tanks With Dimensions Of 2.5 X 1.5 M And A Height Of 2.5 M, N) Construction Of New Concrete Entrance Casings With Dimensions 2.5 X 1.5 M And Height 2.5 M With Moisture-Proof Insulation, Insulation, Plastering And Painting, Installation Of Entrance Doors With Anti-Burglary Protection, Gravity Ventilation,O) Replacement Of Ladders Inside The Tanks (2 Pcs.),P) Replacement Of Hatches Aisi 316 Stainless Steel,Q) Replacement Of Electrical Installations In These Housings,R) Demolition Of Entrance Stairs On The Slope To Each Tank,S) Construction Of New Concrete Stairs With A Width Of 1.2 To 2.0 M Along With Stainless Steel Barriers With An Estimated Length 2 X 16 M, T) Execution Of Sheet Metal Work On The Suw Building, U) Demolition Works - Demolition Of Existing Entanglements With Dimensions Of Approx. 13.5 M X 9.0 M With A Wall Thickness Of 0.1 M (Road Slabs Arranged Horizontally And L- Ki Vertically),V) Construction Of New Concrete Boxes For Loose Materials With Dimensions: 5.5 X 12.0 X 2.0 - 2 Pcs.2) Sewage Treatment Plant In Straszkówa) Disassembly Of Pumps, Mixers And Fittings Inside The Pumping Station Tank With Cleaning Of The Pressure Pipelines, B) Cleaning Of The Pumping Station Tank, C) Ensuring Temporary Pumping Of Sewage From The Basket Grate Chamber Directly To The Biological Reactor With A Bypass Of The Pumping Station For The Duration Of The Works, D) Installation Of Pumps, Mixers, Pipelines And Fittings Inside The Tank, E) Installation Of A New Power Supply And Control Box, F) Installation Of A Float Sewage Level Sensor, G) Replacement Of The Arc Grate In The Chamber At The Reactor Crown, H) Purchase And Delivery Of The Arc Grate, I) Purchase And Delivery Of Containers For Screenings And Sand With A Capacity Of 240L - 2 Pcs.,J) Disassembly And Assembly Of The Overlying Water Pump In The Thickener,K) Replacement Of Mixers In The Reactor - 2 Pcs.,L) Replacement Of The Flow Meter,M) Disassembly Of The Existing Blowers In The Room Along With Control Cabinets With Inverters,N) Delivery And Installation Of New Blowers - 2 Pieces, Including Existing Pipelines Into The System, O) Purchase Of Containers For Screenings And Sand - Formed 1100 L - 2 Pcs, P) Purchase, Installation And Replacement Of The Ssp Network Measurement System, Q) Control Of Fans In Technological Rooms (Generator Room, Blowers) With A Separate Temperature Controller.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
55459fae-6c9b-4f25-8e6d-6800437de965.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.