GTR 80759202

Quotation Are Invited For Complete Overhauling Of Booster Pump For Najma Ph3 Weir Pump

ICB — International Competitive Bid Closed Asia
Tender Information
GTR Reference
80759202
Tendering Authority
Subscribe to view
Tender No
2332401248
Financer Name
Self-Funded
Work Title
Quotation Are Invited For Complete Overhauling Of Booster Pump For Najma Ph3 Weir Pump
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World,Gulf Cooperation Council GCC,Middle East,Middle East and North Africa MENA
Last Date of Bid Submission
30-05-2024 Closed
Work Detail
Quotation are invited for Complete Overhauling of Booster Pump for Najma Ph3 WEIR Pump. COMPLETE OVERHAULING OF BOOSTER PUMP FOR NAJMA PH3 WEIR PUMP.PUMP DETAILS: MAKEWEIR, MODEL-SDA 400/ 500B (HORIZONTAL), CAPACITY-52 5LIT./SEC. EQUIPMENT NUMBER 50270341 PUMP - M0722PLEASE CONTACT MR. NOOR (052-9172523) FOR FURTHER CLARIFICATION.TECHNICAL SPECIFICA TIONS1.0#INTRODUCTIONDUBAI ELECTRICITY & WATER AUTHORITY (DEWA) OWNS AND OPERATES POTABLEWATER BOOSTER PUMPING STATIONS AT VARIOUS L OCATIONS OF DUBAI. THESEBOOSTER PUMPING STATIONS ALONG WITH THEIR ACCESSORIES ARE MAINTAINEDREGULARLY AND TAKEN OUT OF SERVICE IN A PLANNED SEQUENCE MOSTLY INWINTER TO CARRY OUT THE PREVENTIVE MAINTENANCE, INSPECTIONS &OVERHAULING ETC.2.0#SCOPE OF WORKTHE SCOPE OF WORK FOR THE OVERHAUL OF BOOSTER PUMPS AND THEIRACCESSORIES OF BOOSTER PUMPING STATION.#A)#THE CONTRACTOR HAS TO TAKE THE PUMP ASSE MBLY FROM DEWA SITE TO THEIRWORKSHOP & VICE VERSA. DEWA SHALL NOT PROVIDE ANY TRANSPORT TO SHIFT THESAME. FOR LOADING & UNLOADING C ONTRACTOR CAN USE DEWA OVERHEAD CRANEAVAILABLE AT PUMPING STATIONS IN COORDINATION WITH THE DEWAREPRESENTATIVES.B)#MECHANICAL SEAL R EPLACEMENT, COUPLING BUSH RENEWAL & GLAND PACKINGRENEWAL, BEARING REPLACEMENT AS REQUIRED.C)#OVERHAULING OF PUMP (SEE ANNEXURE I & I I)D)#PAINTING OF PUMP EXTERNALLYE)#RECTIFICATION OF THE PUMP FOR ANY COMPLAINT ROSE AFTER INSTALLATION.F)#IF ANY PART IS FOUND DEFEC TIVE, THE CONTRACTOR HAS TO REPAIR/REPLACETHE SAME. AVAILABLE SPARE SHALL BE SUPPLIED BY DEWA. IF ANY SPARE IS NOTAVAILABLE WITH DEW A THE CONTRACTOR HAS TO ARRANGE THE SAME. ADDITIONALCOST OF SPARE TO BE SUBMITTED TO DEWA FOR APPROVAL BEFORE PLACING THEORDER.3.0#P RIOR TO SUBMISSION OF QUOTATION, THE FOLLOWING SHALL BE DETERMINEDCAREFULLY:A)#THE CONTRACTOR SHALL VISIT THE SITE AND MAKE HIMSELF FULLY FAMILIARWITH THE WORK SCOPE, PLANT ACCESS FACILITIES, COMPLEXITIES, ETC., BEFORESUBMITTING THE QUOTATION.B)#DEWA WILL NOT ACCE PT ANY CLAIM FOR EXTRAS BEYOND THE ORDER RATES /PRICES DURING AND AFTER THE EXECUTION OF WORK ORDERED.C)#THE CONTRACTOR WILL BE PROV IDED WITH THE EQUIPMENT SHUTDOWN PROGRAMIN COORDINATION WITH OPERATION & MAINTENANCE DEPARTMENT OF WATERDIVISION.D)# THE CONTRACTOR SHOULD SUBMIT THE TIME SCHEDULE /BAR CHARTINDICATING EACH ACTIVITY.E)#ON COMPLETION OF THE WORK, THE INSPECTION CHECKLIST OF QUALITY PROCEDURES, WHEREVER APPLICABLE SHOULD BE FILLED IN AND SUBMITTED.F)#SITE SUPERVISION, CO-ORDINATION OF FIELD ACTIVITIES, SUPPLY OFR EQUIRED TECHNICIANS, TOOLS, EQUIPMENTS, TACKLES ETC. REQUIRED FOREXECUTION OF THE CONTRACT WORKS SHALL BE SUITABLY CONSIDERED.4.0#TA KE OVERON COMPLETION OF ALL WORK WITHIN THE SCOPE OF THE CONTRACT, FORACCEPTANCE OF THE MAINTENANCE WORK, CONTRACTOR SHALL NOTIFY DE WA INWRITING. A CERTIFICATE OF COMPLETION WILL BE ISSUED BY DEWA ON FINALINSPECTION ONLY WHEN THE CONTRACT WORK IS DEEMED TO HAVE BE EN TAKEN OVERBY DEWA AFTER NECESSARY CONDITION MONITORING CHECKS WHEREVER & WHENEVERREQUIRED.5.0#WARRANTYA)#ALL THE WORK CARRIED OUT SHALL CARRY A WARRANTY FOR 8000 HOURS OFOPERATION OR 1 YEAR WHICHEVER IS EARLIER.B)#THE GUARANTEE WILL TAKE EFFECT FROM THE DATE OF TAKEOVER BY DEWA OFTHE JOB CARRIED OUT BY THE CONTRACTOR.C)#WHEN A DEFECT IS NOTICED DURING THE PERIOD OF WARRANTY, THECONTRACTOR M UST RECTIFY THE DEFECT WITHIN A REASONABLE AMOUNT OF TIMEFIXED BY DEWA WITH NO CLAIM OR COMPENSATION.6.0#DOCUMENTS:#ON SATISFACTORY COMPLETION OF THE WORK & HANDING OVER, THE CONTRACTORSHOULD SUBMIT THE FOLLOWING TO DEWA. ##A)#INSPECTION R EPORT.B)#OVERHAUL REPORT.C)#JOB COMPLETION REPORT FOR JOBS OTHER THAN ROUTINE INSPECTION &OVERHAULSD)##AS-FITTED# BILL OF MATERIALS FOR CONSUMPTION OF SPARESE)#REQUISITION FOR PLANNING OF SPARES BY DEWA BASED ON CURRENTCONDITION OF THE EQUIPMENT FOR WHICH MAINTENA NCE WORK WAS TAKEN UP.ANNEXURE Qty: 1 Complete Overhauling of Booster pump for Najma Ph3 WEIR pump. Pump Details: Make- WEIR, Model-SDA 400/ 500B (HORIZONTAL), Capacity525Lit./Sec. Equipment Number 50270341 PUMP - M0722 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332401248)/$value
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
cf92a4f2-3ba6-4bd0-8245-eabc1d824cb8.pdf
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders