GTR 80730612
Tenders Are Invited For Reconstruction Of A Fragment Of Fire Access Road No. 61 In The Martew Forest District In The Tuczno Forest District
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
80730612
Tendering Authority
Subscribe to view
Tender No
S.270.1.1.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Of A Fragment Of Fire Access Road No. 61 In The Martew Forest District In The Tuczno Forest District
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
10-06-2024
Closed
Work Detail
1. The Subject Of The Order Is: Reconstruction Of A Fragment Of The Fire Access Road No. 61 In The Martew Forest District In The Tuczno Forest District. The Subject Of The Order Is The Reconstruction Of A Fragment Of The Road - Fire Access Road No. 61 In The Martew Forest District On Plots No. 8271, 8272, 8273, Martew District, Tuczno Commune . The Section Of The Road To Be Reconstructed Is 499.7 M Long And 3.0-3.5 M Wide And Has A Dirt Surface. Based On The Geotechnical Tests Performed, It Was Found That Fine Sands And Clayey Sands Were Present In The Subsoil, And No Groundwater Was Found. The Existing Subsoil Was Classified To The Load Capacity Group G2 And Was Classified As Simple Conditions And The First Geotechnical Category. As A Result Of The Reconstruction, A Fragment Of The Road Will Be Created That Will Meet Technical Parameters In Accordance With The Regulation Of The Minister Of Infrastructure Of June 24, 2022 On Technical And Construction Regulations Regarding Public Roads (Journal Of Laws Of 2022, Item 1518, As Amended). A Road Structure Was Designed With A Surface Made Of Concrete Multi-Hole Slabs With A Road Width Of 3.0 M And Shoulders Reinforced With Crushed Aggregate, 2 X 0.25 M Wide. Exits With A Surface Made Of Crushed Aggregate. The Scope Of Construction Works Includes: I. Preparatory Works:1. Measurement Works For Linear Earthworks - Road Routes In Hilly Terrain.2. Mechanical Clearing Of Bushes And Undergrowth. Ii. Earthworks:3. Earthworks In Category Iv Soil Performed With Backhoe Excavators With A Bucket Capacity Of 0.6 M3 And Transport Of Excavated Material With Self-Unloading Vehicles Of 5-10 T Capacity Over A Distance Of Up To 1 Km.4. Supplementary Expenditure To Tables 0201-0213 For Each Further 0.5 Km Of Transport Distance Of Category Iii-Iv Soil Using Self-Unloading Vehicles Of 5-10 T For A Distance Of Over 1 Km On Paved Roads - Further 5 Km.5. Forming And Compacting Embankments Of Category I-Ii Soil With Bulldozers Up To 3 M High (55 Kw Crawler Bulldozer (75 Kw), The Contractor Will Purchase Sand For The Entire Embankment).6. Making A 30 Cm Thick Geosynthetic Mattress.7. Compaction Of Embankments Made Of Loose Soil Of Categories I-Iii With Compactors. Iii. Subbases And Pavement Layers:8. Profiling And Mechanical Compaction Of The Subgrade For Pavement Construction Layers In Soil Categories I-Iv.9. Aggregate Foundations, Bottom Layer, Layer Thickness After Compaction 25 Cm.10. Construction Of Surfaces From Multi-Hole Reinforced Concrete Slabs With An Area Of Up To 1.0 M2.Iv. Exits/Crossings:11. Excavations And Trenches In Category Iii Soil Were Carried Out Using Backhoe Excavators With A Bucket Capacity Of 0.40 M3 (Photo Of The Fertile Soil Layer).12. Profiling And Mechanical Compaction Of The Subgrade For Construction Layers On The Surface In Soil Categories I-Iv.13. Surface Made Of Crushed Aggregates, Layer Thickness After Compaction 25 Cm14. Roadside Surface Made Of Crushed Aggregate, Upper Layer, Layer Thickness After Compaction 12.5 Cm.V. Finishing Works:15. Topsoiling Of Slopes With Sowing. The Task Entitled: Reconstruction Of A Fragment Of The Fire Access Road No. 61 In The Martew Forest District In The Tuczno Forest District Is A Task For Which A Building Permit Was Obtained On The Basis Of Decision 49/2024 Of March 8, 2024 Issued By The Starosta Of Wałecki . (Ref. Ab.6740.24.2024.Dd). Due To The Above, The Contractor Will Be Obliged To Carry Out The Task In Accordance With The Procedures Required For The Building Permit, Such As Notifying The Commencement And Completion Of Construction To The District Construction Supervision Inspectorate In Wałcz, Making Entries In The Construction Log By Authorized Persons, Preparing Full Surveying Documentation And Submitting It To The Relevant Institutions As Soon As Possible. A Detailed Description Of The Subject Of The Order Is Included In Annexes No. 8-12 To The Swz, Which Includes: Bid Cost Estimate - Annex No. 8, Technical Specification For The Execution And Acceptance Of Works - Annex No. 9, Construction Design - Annex No. No. 10, Technical Design – Annex No. 11, Bill Of Quantities – Annex No. 12.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
25138c60-936f-44eb-8f7d-e0b9cc0ffeea.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.