GTR 80681391
Tenders Are Invited For Delivery And Installation Of Photovoltaic Installations In The Cekcyn Commune To Facilities Owned By The Commune
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
80681391
Tendering Authority
Subscribe to view
Tender No
ZP.271.9.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Delivery And Installation Of Photovoltaic Installations In The Cekcyn Commune To Facilities Owned By The Commune
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
05-06-2024
Closed
Work Detail
1. The Subject Of The Order Is The Delivery, Installation And Commissioning Of Photovoltaic Panels For The Following Public Utility Facilities Owned By The Cekcyn Commune: 1) Water Treatment Station In The Town Of Cekcynek - Photovoltaic Installation Constructed On Land With A Capacity Of 48.00 Kwp, 2) Water Treatment Station In The Town Wielkie Budziska - Photovoltaic Installation On The Ground With A Capacity Of 48.00 Kwp,3) Sewage Catchment Point In Cekcyn - Photovoltaic Installation On The Ground With A Capacity Of 31.50 Kwp,4) Sports Locker Room Building Located In Cekcyn, At Szkolna 41A Street - Photovoltaic Installation On The Roof Of The Building With A Capacity Of 24.60 Kwp,5) Rural Community Center In Brzozie - Photovoltaic Installation On The Roof Of The Building And The Ground With A Capacity Of 8.61 Kwp,6) Rural Community Center In Ludwichów - Photovoltaic Installation On The Roof Of The Building With A Capacity 15.99 Kwp,7) Social Services Center - Hopland Located In Cekcyno At 14 Wczasowa Street - Photovoltaic Installation On The Roof Of The Building With A Capacity Of 9.84 Kwp,8) Municipal Cultural Center In Cekcyna - Photovoltaic Installation Located On The Roof Of The Building With A Capacity Of 14 .76 Kwp,9) Tourist Center Jarzębina Located In Cekcyno At 17 Ogrodowa Street - Photovoltaic Installation Installed On The Roof Of A Farm Building Located Next To The Center With A Power Of 14.76 Kwp, 10) Village Community Center In Ostrów - Photovoltaic Installation Located On The Roof Of The Building With A Capacity Of 10.66 Kwp,11) Former School Building In Trzebciny - Photovoltaic Installation Located On The Ground With A Capacity Of 13.53 Kwp,12) Village Community Center In Zalesie - Photovoltaic Installation Located On The Roof Of The Building With A Capacity Of 11.89 Kwp. 2. The Order Is Co-Financed From Funds From The Polish Government Fund: Strategic Investment Program. 3. Pursuant To Art. 310 Section 1 Of The Public Procurement Act, The Ordering Party Provides For The Possibility Of Invalidating The Contract Award Procedure If The Public Funds It Intended To Use To Finance All Or Part Of The Order Are Not Awarded To It. 4. The Scope Of Work Includes: 1) Delivery And Assembly Of The Structure For Pv Panels, 2) Delivery And Installation Of Brand New Pv Panels On The Structure, 3) Delivery And Assembly Of Brand New Dc/Ac Inverters/Inverters, 4) Laying Of Cable Routes And Cables From Pv Panels To The Electrical Switchboard,5) Modernization Of The Electrical Switchboard To The Necessary Extent,6) Installation Of A Pv Switchgear For Photovoltaics (Dc And Ac Sides) Along With Grounding Of The Pv Installation,7) Carrying Out Installation Tests And Checking The Proper Operation Of The Equipment,8) Trial Commissioning Of The Photovoltaic System,9) Measurements Of Electrical Installations Required By Relevant Regulations,10) Finishing At Least In Accordance With The Original Condition Of The Areas Around The Installation Passages (Plaster/Insulation, Passages Through Walls, Ceilings, Roofs) And Effective Protection Against Weather Conditions Of Places Outside The Facility Where Assembly Works Were Carried Out,11) Configuration Of All Inverters, I.E. Connection To The Internet (Where Possible) And Integration With One System To Monitor Energy Production, Ecological Benefits And Control The Operation Of Photovoltaic Installations From The System Level,12) User Training Regarding The Principles Of Proper Operation Of The Photovoltaic Installation, Including The Development Of Operating Instructions And Their Distribution To Users, 13) Connecting The Installation To The Power Grid And Reporting The Connection Of The Installation To The Distribution Network Based On The Guidelines, 14) Preparing 1 Copy Of As-Built Documentation For Each Of The Completed Photovoltaic Installations. 5. A Detailed Description Of The Subject Of The Order Is Specified In The Technical Documentation Constituting Annex No. 7 To The Swz.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
a93d37e8-443b-4468-99f1-beb4e144e372.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.