GTR 80629936

Tenders Are Invited For Providing Investor Supervision Services For The Reconstruction Of The Cloakroom In The Building Of The Secondary School. Maria Konopnicka In Legionowo

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
80629936
Tendering Authority
Subscribe to view
Tender No
ZPU.272.22.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Providing Investor Supervision Services For The Reconstruction Of The Cloakroom In The Building Of The Secondary School. Maria Konopnicka In Legionowo
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
29-05-2024 Closed
Work Detail
1. The Subject Of The Order Is The Provision Of Investor Supervision Services For The Reconstruction Of The Cloakroom In The Building Of The Secondary School. Maria Konopnicka In Legionowo.2. Detailed Scope Of Investor Supervision: 1) Supervision Over The Correct Implementation Of The Investment, 2) Checking The Compliance Of The Works With The Project, Regulations And Applicable European And Polish Standards And Principles Of Technical Knowledge, 3) Checking The Quality Of The Works Performed, Built-In Construction Products, And In Particular Preventing The Use Defective Construction Products And Not Approved For Use In Construction, 4) Checking And Acceptance Of Construction Works That Are Covered Or Disappearing, 5) Giving Opinions On Material Applications (Submitted By Construction Contractors) In Terms Of Compliance With The Assumptions Of The Design Documentation For Materials To Be Incorporated, 6 ) Participation In Acceptance And Preparation And Participation In Acceptance Activities Of Completed Construction Works And Their Submission For Final Acceptance By The Ordering Party, 7) Participation In Committees Appointed By The Ordering Party, 8) Confirmation Of Completed Works And Removal Of Defects, As Well As, At The Request Of The Ordering Party, Controlling Construction Settlements, 9) Issuing Instructions To The Construction Manager: To Remove Irregularities Or Threats, To Perform Tests Or Examinations, Including Those Requiring The Discovery Of Works Or Hidden Elements, And To Present Expert Opinions On The Construction Works Carried Out, Evidence Of Approval For Marketing And Use Of Construction Products And Technical Devices In Construction, 10) Requesting The Construction Manager To Make Corrections Or Re-Perform Defective Works, As Well As To Suspend Further Construction Works In The Event That Their Continuation Could Pose A Threat Or Result In Non-Compliance With The Design Or Construction Permit, 11) Control Of The Timeliness Of The Works In Relation To The Schedule, 12) Protection The Interests Of The Ordering Party In The Field Of Technical And Economic Matters Under The Design Documentation, Construction Law And Contract For The Implementation Of Construction Works, 13) Travel To And Stay At The Construction Site In The Amount Necessary For Proper Supervision, Starting From The Date Of Commencement Of The Service - The Presence Of At Least 2 People Is Required Times A Week And At Each Request Of The Ordering Party In Matters Requiring Immediate Action By The Investors Supervision, 14) Notifying The Ordering Party Immediately (No Later Than Within 24 Hours) Of Irregularities Occurring On The Construction Site, 15) Participating In The Protocol Handover Of The Construction Site To The Contractor, 16) Informing The Ordering Party About Any Circumstances That May Affect The Timeliness And Correctness Of The Works Carried Out By The Contractor And About The Occurrence Of Circumstances Unforeseen In The Design Documentation, 17) Keeping Documentation Of The Supervisions Carried Out In The Form Of Reports For The Ordering Party, 18) Reporting To The Designer Any Reservations Of The Construction Contractor Or The Ordering Party Regarding The Documentation Design And Making Appropriate Arrangements Or Providing Explanations, 19) Preparation And Participation In Acceptance Activities, Including In Particular Receiving From The Contractor Of Construction And Installation Works Complete Certificates, Attestations, Guarantees And Confirmation In The Construction Documentation Of The Completion Of All Works Covering The Subject Of The Order, Constituting The Basis For Signing Final Acceptance Report By The Investor.3. The Subject Of The Investment Is The Reconstruction Of The Locker Room To The Extent Enabling It To Be Equipped With Individual Lockers For 1,154 Students, As Part Of The Task Titled: Development Of Design Documentation And Reconstruction Of The Locker Room At The Secondary School. M. Konopnicka In Legionowo.”4. A Detailed Description Of The Works That Will Be Supervised Under This Order Is Included In The Design Documentation, Which Consists Of A Technical Design, Technical Specifications For The Execution And Acceptance Of Works, And Bills Of Quantities Constituting Auxiliary Material In The Preparation Of The Offer.5. The Scope Of The Order Will Include The Following Works: 1) Reconstruction Of Selected Rooms, 2) Dismantling Of Locker Rooms, 3) Removal Of Existing Floors And Construction Of A New Floor With Stoneware Tiles, 4) Painting Of Walls And Rooms Covered By The Study, 5) Installation Of A Ceiling Casing For Electrical Cabling In The Ceiling System Suspended,6) Construction Of 2 Pieces Of Ventilation Grilles,7) Installation Of Door Joinery In Accordance With The Design,8) Installation Of Two-Part Lockers In The Number Of 576 Pieces In The Locker Room And Next To The Gymnasium And 2 Pieces Of Cabinets Adapted To The Needs Of Disabled People.6 . The Contractor Will Provide A Warranty For A Period Of 60 Months From The Date Of Acceptance Of The Construction Works And A Warranty For The Warranty Period.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
aa8ecdfd-876e-4050-b012-a1f6d001958e.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders