GTR 80565503
Tenders Are Invited For Execution Of Construction Works Related To The Construction Of A Road With Led Street Lighting On Ul. Diamentowa As Part Of The Investment Project Entitled: Construction Of Diamentowa Street In Dzierżoniów.
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
80565503
Tendering Authority
Subscribe to view
Tender No
ZI-1.271.61.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Execution Of Construction Works Related To The Construction Of A Road With Led Street Lighting On Ul. Diamentowa As Part Of The Investment Project Entitled: Construction Of Diamentowa Street In Dzierżoniów.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
06-06-2024
Closed
Work Detail
1.1. The Subject Of The Order Is The Performance Of Construction Works Related To The Implementation Of The Investment Task Entitled: Construction Of Ul. Diamentowa In Dzierżoniów”.1.2. The Scope Of The Subject Of The Order Referred To Above, Which Concerns The Performance Of Construction Works Related To The Construction Of Ul. Diamentowa Together With Lighting, Based On The Design Documentation Possessed By The Ordering Party, For Which The Building Permit Decision No. 1264/2020 Of December 18, 2020 Was Issued By The Starosta Of Dzierżoniów, Includes: 1) Construction Of A Road With Resistors And A Structure With A Surface Of Gray Concrete Cubes;2) Construction Of A Pedestrian Route With Edges And A Structure With A Surface Made Of Gray Concrete Cubes;3) Construction Of Entrances To The Property Together With A Structure With A Graphite-Colored Concrete Cube Surface;4) Construction Of Roadsides With The Structure With A Surface Made Of Openwork Slabs;5) Construction Of Led Street Lighting With Cabling;6) Introduction And Maintenance Of Permanent Traffic Organization;7) Regulation Of All Existing Devices (E.G. Gate Valves, Wells) Located In The Area Of The Works To The Designed Elevations Works Including The Replacement Of Well Rings And Covers With Inrun Ones;8) Accompanying Works Related To The Construction Of Ul. Diamentowa, Its Connection With The Existing Neighboring Akacjowa Street, Sidewalks, Accesses To Buildings, Etc. The Contractor Should Adjust And, If Necessary, Rebuild All Access Roads, Entrances, Fences, Etc. To The New Grade Of The Completed Road Surfaces, Sidewalks, Bicycle Paths, Roadsides, Etc. With Appropriate Rainwater Drainage. In The Event Of Interference With Or Damage To Adjacent Structures, Their Repair, Addition, Height Adjustment, Etc. Should Be Taken Into Account.1.3. The Detailed Scope Of The Order Was Specified In: 1) Building Permit Decision No. 1264/2020 Of December 18, 2020, Issued By The Starosta Of Dzierżoniów; 2) Construction Project Entitled: Construction And Reconstruction Of Road Infrastructure In The Estate. Tęczowy W Dzierżoniów” - Road Part;3) Construction Project Entitled: Construction And Reconstruction Of Road Infrastructure In The Estate. Tęczowy W Dzierżoniów - Road Lighting; 4) Construction Project Entitled: Construction And Reconstruction Of Road Infrastructure In The Estate. Tęczowy W Dzierżoniów” - Land Development, Road And Electrical Part; 5) Executive Design Entitled: Construction And Reconstruction Of Road Infrastructure In The Estate. Tęczowy W Dzierżoniów - Road Part; 6) Executive Design Entitled: Construction And Reconstruction Of Road Infrastructure In The Estate. Tęczowy W Dzierżoniów” - Road Lighting;7) Target Traffic Organization Project Titled: Construction And Reconstruction Of Road Infrastructure In The Estate. Tęczowy W Dzierżoniów;8) Technical Specification For Execution And Acceptance Entitled: Construction And Reconstruction Of Road Infrastructure In The Estate. Tęczowy In Dzierżoniów”.1.4. The Contractor Is Obliged To Perform The Scope Of Works Indicated In The Draft Contract, In The Design Documentation, Including The Land Development Design And Detailed Design, Which Is Specified In The Form Of A Technical Description Or Drawings Or Simultaneously In The Description And Drawings. Both The Technical Description And Drawings (Graphic Part) Of The Projects Are Equivalent And Describe The Subject Of The Order.1.5. The Contractor Is Obliged To Perform Construction Works In Accordance With Construction Practice, Investor Supervision Recommendations, And The Documentation Mentioned Above, Taking Into Account The Elimination Of Architectural Barriers For People With Disabilities.1.6. The Contractor, Apart From The Above-Mentioned Obligations Arising From The Obligation To: 1) Take Over The Construction Site, Secure It And Properly Mark It, And Apply To The Network Operators For A Protocol Transfer Of The Devices For The Duration Of The Works, And After Completion Of The Works, A Protocol Transfer Of Them To The Owners, As Well As Making The Construction Site Available To The Network Operators For The Purpose Of Carrying Out Renovation Works On Their Own Resources If Necessary; 2) Ensuring, During The Works, Access To And Access To Properties Located Within The Investment, Including Access For Rescue Services; 3) Organization Of Construction Facilities And Social And Sanitary Rooms For Employees And Places Where Materials Are Stored; 4) Ensuring The Supply Of Necessary Utilities To Carry Out The Works And Payment For Their Delivery. The Contractor Shall Provide The Necessary Utilities On Its Own To Ensure The Proper Performance Of The Works; 5) Bear All Costs Related To The Implementation, Supervision And Fulfillment Of All Obligations Arising From The Decision On The Construction Permit And Obligations Arising From The Decisions, Arrangements And Opinions Obtained And Those That The Contractor Is Obliged To Obtained During The Implementation Of Construction Works;6) Carrying Out Examinations, Tests And Measurements During The Performance Of Construction Works And Acceptance Tests In Accordance With The Technical Specification And Construction Knowledge And Practice; 7) Providing The Ordering Party, Before Signing The Contract, With Declarations On The Assumption Of Duties By The Construction Manager And Work Managers As Well As Documents Resulting From The Terms Of Reference; 8) On-Going Cleaning Of The Surface Of The Adjacent Area And Streets In The Event Of Fertilizing Mud From The Construction Site On The Wheels Of Machines, Cars And Other Devices Technical;9) Tidying Up The Construction Site And Restoring The Adjacent Area To Its Original Condition After Completion Of The Works;10) Removing Demolition Material And Debris, Unnecessary Materials And Unnecessary Equipment To The Landfill And Incurring The Costs Of Their Storage And Disposal;11) Surveying Services During Implementation Construction Works, As Well As To Perform Post-Construction Geodetic Measurement Together With A Title Page And Legend In Paper And Electronic Form On A Cd; 12) Protection Of Geodetic Control Points, And In The Event Of Their Destruction Or Damage Or The Need To Transfer The Order To An Authorized Geodetic Contracting Entity, Their Reconstruction Or New Assumptions;13) Implementation Of The Safety And Health Protection Plan;15) Participation Of The Construction Manager And Industrial Works Managers In Construction Councils Held At Least Once A Week;16) Ongoing Preparation Of Construction Settlements And Invoices According To The Ordering Partys Recommendations;17) Other Necessary Activities Required By Law And Related To The Implementation Of The Subject Of The Order; 18) Performing Coordination Functions In Relation To Works Carried Out By Subcontractors; 19) Fulfilling The Obligations, Including Those Of The Investor (Municipality), Resulting From The Opinions, Arrangements, Permits And Decisions Contained In Construction Project (M. Incl. Decision 1264 Of December 18, 2020), As Well As Those That Will Be Issued In The Course Of The Works;20) (If Necessary) Replacing The Soil, Drainage Of Excavations And Performing Any Temporary Works Necessary To Secure The Construction Site And Adjacent Areas Against Damage Or Contamination;21) Be Liable For Any Damage Occurring On The Construction Site From The Date Of Its Acceptance;22) Obtain A Certificate Of Completion Of Construction Works In Accordance With Art. 54 Of The Prbud Act, Including The Preparation Of All Documents Necessary To Obtain This Certificate. For This Purpose, At The Request Of The Contractor, The Ordering Party Will Grant Appropriate Powers Of Attorney.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
09772ce7-5372-4529-b714-e921d44d0e4a.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.