GTR 80565424
Tenders Are Invited For 41.24 Performance Of Construction Works As Part Of The Investment Project Titled Improvement Of Health Protection Through Modernization, Reconstruction And Additional Equipment Of The Hospital Emergency Department...
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
80565424
Tendering Authority
Subscribe to view
Tender No
SzP.ZP.271.41.24
Financer Name
Self-Funded
Work Title
Tenders Are Invited For 41.24 Performance Of Construction Works As Part Of The Investment Project Titled Improvement Of Health Protection Through Modernization, Reconstruction And Additional Equipment Of The Hospital Emergency Department...
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
06-06-2024
Closed
Work Detail
1. The Subject Of The Order Includes The Performance Of Construction Works As Part Of The Investment Task Titled: Improving The State Of Health Protection Through Modernization, Reconstruction And Additional Equipment Of The Hospital Emergency Department At The Specialist Hospital. Edmund Biernacki In Mielec In The Scope Of: Construction Works: A) Demolition Of Walls, Cutting Door Openings, B) Dismantling Of Existing Doors And Internal Glazing, C) Removal Of Existing Interior Finishing Elements: Wall Cladding; Carpets And Floor Tiles, Suspended Ceilings, D) Construction Of Partition Walls, E) Construction Of Steel Structures For The Installation Of Medical Devices, F) Installation Of Doors, G) Construction Of Interior Finishing Elements: Painting, Puttying, Wall Cladding; Carpets And Floor Tiles, Suspended Ceilings, H) Installation Of Screen Systems, Signage System For Disabled People With Special Needs, Information Boards, Handles, Handrails, I) Delivery And Assembly Of Furniture For Medical Rooms, Modernization Of Internal Installations In The Building: A) Disassembly And Installation Of Washbasins, Toilet Bowls, Urinals, Shower Trays, B) Disassembly, Storage And Reassembly Of Shadowless Operating Lamps With Power Supplies, C) Modernization Of The Central Heating Installation: Disassembly Of Existing Radiators - Installation Of Hygienic Radiators, D) Modernization Of Cold And Hot Water Installations - Disassembly Of The Existing Installation - Installation Of A New Installation, E) Modernization Of The Sanitary Sewage System - Dismantling Of The Existing Installation, Installation Of A New Installation, F) Modernization Of Mechanical Ventilation, Installation Of The Ventilation Installation With A Ventilation Unit, G) Modernization Of The Chilled Water Installation Along With With A Refrigeration Unit, H) Modernization Of Air Conditioning, Installation Of Air Conditioning Installations Together With Refrigeration Units And Internal Units, I) Modernization Of Lighting Installations, Including Emergency And Evacuation Lighting, J) Modernization Of Power Installations And Plug Sockets, K) Modernization In The Field Of Fire Protection Devices, Fire Dampers, Hydrant Installation, L) Modernization In The Field Of Ssp Installations And Devices, M) Modernization In The Scope Of Structured And Telephone Cabling Installations, N) Modernization In The Scope Of Access Control Installations, O) Modernization In The Scope Of Monitoring Installations Cctv, P) Modernization Of Medical Monitoring Installations, Q) Modernization Of Medical Gas Installations: Oxygen; Compressed Air; Vacuum, Gas Extraction, R) Delivery And Installation Of Medical Columns And Medical Panels, S) Modernization Of The Topsor System, Expansion Of The System, T) Modernization Of The Paging Installation, Installation Of The Installation, 2. The Basis For The Execution Of The Subject Of The Order Is: A) Architectural Design - Construction, B) Detailed Construction Design, C) Electrical Installation Design, D) Sanitary Installation Design, E) Traffic Organization Change Design, F) Technological And Visualization Design, G) Bill Of Quantities, H) Specifications For The Execution And Acceptance Of Works. The Documents Constitute Annex No. 9 To The Swz. 3. Construction Works Should Be Divided Into Two Stages With Appropriate Tight Protection - Separating The Rooms With Plasterboard Walls. A Covered Temporary Driveway For Ambulances Should Be Organized And Marked In Accordance With The Traffic Organization Change Project. 4. Construction Works Should Be Carried Out In Such A Way As Not To Interfere With Areas Excluded From The Scope Of Works (Operating Room, Paks Room), Except For The Installation Of Ssp In Them After Prior Arrangements With Users. 5. Training Of Staff In The Use Of Technical Equipment And Modernized Installations. Preparation Of Operating Instructions For Individual Installations, Systems And Devices. 6. Preparation Of As-Built Documentation In Graphic And Descriptive Form In Paper Version (2 Copies) And Electronic Version (2 Copies) For Works Where Changes Were Introduced That Differ From The Designs Previously Agreed With The Ordering Party And The Designer.7. Providing As-Built Documentation Of The I&C Installation For The Installed Mechanical Ventilation And Air Conditioning Systems. 8. The Contractor Will Perform All Maintenance And Operational Activities In Accordance With The Developed Operating Instructions During The Warranty Period Without Any Costs Incurred By The Ordering Party. 9. Conditions For Medical Gas Installations: A) In Accordance With The Act On Medical Devices Of May 20, 2010 (Journal Of Laws No. 107, Item 679 Of 2010) And The Medical Directive 93/42/Eec And In Accordance With The Regulation Of The Minister Of Health Of November 5, 2010 (Journal Of Laws No. 215, Item 1416 ) Pipeline System For Medical Gases Is A Class Iib Medical Device. Like Any Medical Device, In Order To Be Put Into Use, In Accordance With Art. 11 Of The Medical Devices Act, It Must Be Marked With The Ce Mark And In Accordance With Art. 58 Of The Act On Medical Devices Must Be Reported To The Register Of Medical Devices. B) The Contractor Must Have A Current Iso 13485:2016 Certificate In The Field Of Design And Development, Manufacturing, Distribution, Installation And Servicing Of Medical Gas Pipeline Systems Issued By An Accredited Notified Body, Which Authorizes The Certification Of The Completed Installation As A Medical Device And Marking It With The Ce Mark.C) After Completing The Installation, An Acceptance Procedure Must Be Carried Out, Which Involves Checking The Installation, Carrying Out Detailed Tests And Examinations, Marking The Installation, Cross Connections, Clinical And Operational Alarms, Contamination, Mechanical Strength And Tightness Of Pipeline Systems, Zone Shut-Off Valves, And Medical Gas Consumption Points. The Acceptance Procedure Will Be Performed In Accordance With The Applicable Standard Pn-En Iso 7396 Pipeline Systems For Medical Gases And Vacuum. D) The Installation Must Be Ce Marked As A Medical Device And Receive Its Identification Number And Declaration Of Conformity. An Individual Instruction Manual Must Be Prepared For The Medical Gas Pipeline System And Complete As-Built Documentation Must Be Provided. 10. The Contractor Is Obliged To Provide The Ordering Party With A Warranty For The Subject Of The Order: - Min. 60 Months – Max. 84 Months
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
716b9780-1f6b-40f7-83bb-acd931bb55f8.html
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.