GTR 80565311

Tenders Are Invited For Development Of The Area Around The Hospital Buildings As Part Of The Creation Of A Provincial Care Center For The Elderly In Opole Lubelskie, Stage Ii

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
80565311
Tendering Authority
Subscribe to view
Tender No
IGM.272.6.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Development Of The Area Around The Hospital Buildings As Part Of The Creation Of A Provincial Care Center For The Elderly In Opole Lubelskie, Stage Ii
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
04-06-2024 Closed
Work Detail
I. The Subject Of The Order Is The Development Of The Area Around The Hospital Buildings As Part Of The Creation Of A Provincial Center For Care For The Elderly In Opole Lubelskie, Stage Ii. The Investment Is A Continuation/Second Stage Of The Task Construction Of A Hospital Pavilion Of A Care And Treatment Facility In Opole Lubelskie. The Works Include Comprehensive Development Of The Plot. Internal Roads, Including Fire Protection Ones In The Hospital Complex And Parking Spaces, Are To Be Implemented. For People Staying In The Area, Sidewalks And Ramps Are Planned To Be Reconstructed In Order To Adapt And Improve Functionality For People With Special Needs. As Part Of The Revitalization Of Green Areas, New Plantings And The Creation Of Resting Places - Benches Are Planned. The Area Will Be Illuminated With New Park Lamps. As Regards The Facilities Accompanying The Hospital Pavilion, Work To Be Carried Out In The Building Is Related To Securing The Hospital Facilities With An Additional Source Of Water, An Additional Source Of Energy And The Construction Of A Photovoltaic Installation On The Supporting Structure. In Terms Of Underground Infrastructure, The Project Includes The Expansion And Modernization Of Sections Of The Internal Water Supply Network, Sanitary Sewage System, Electricity System And Rainwater Sewage System. The Implementation Of This Investment Will Enable The Putting Into Use Of The Hospital Pavilion Of The Care And Treatment Facility In Opole Lubelskie, Which Is Currently Under Construction. The Development Of The Plot Area Will Significantly Affect The Quality Of Life Not Only Of The Inhabitants Of Opole Lubelskie, But Of The Entire Opole District. This Investment Will Contribute To A Significant Improvement In The Lives Of The Inhabitants Of The Entire District, In Which The Liquidated State Agricultural Enterprise Operated. Ii. The Proceedings Concern Stage Ii Of The Investment, Which Includes: 1. Summary List Of Works:1). Land Development: A. Construction Of New Hardenings, Sidewalks, Roads With Retaining Walls And Parking Lots, Along With Renovation Of Existing Internal Roads And Sidewalks, Drainage Strips. B. Execution Of Area Lighting Installation - Replacement Of Existing Lighting Poles, Installation Of New Ones With Cabling, Installation Of Cable Power Supply For Two Cameras, Low Voltage Power Lines Zol-Barrier, Zol-Brama.C. Tree Felling According To Pzt, Including Tidying Up Green Areas, Installing Small Architecture Elements, Fencing And Balustrades, As Well As Maintaining The Existing Tree Stand With Felling According To Separate Study. D. Construction Of A Rainwater Sewage Connection With An External Sanitary Sewage System, Stage Ii, In The Adjacent Areas According To Pzt.E. Renovation Of The Sidewalk In Ul. Szpitalna And Construction Of A Regular Exit From The District Road On Plot 24/2. 2). Reconstruction Of External Stairs And Ramps For Disabled People At The Building Of Specialist Clinics: A. Reconstruction Of External Stairs And Ramps For Disabled People On The Southern Façade Of The Building Of Specialist Clinicsb. Reconstruction Of The External Stairs On The Eastern Façade Of The Specialist Clinic Building. Replacing The Casing Of The Power Connector At The Stairs And Installing An Internal Power Supply Line To The Buildingd. Outbuildings.3). Reconstruction And Renovation Of The Technical Building With Infrastructure: A. Construction Of A Water Supply And Sewage Connection To The Hydrophore Building And An External Water Supply System Constituting A Second Source Of Power For The Buildings On The Hospital Premisesb. Execution Of An External Sanitary Sewage System To The Sewage Chamber Of Stage 1.C. Construction Of Power Cable Lines From The Generator To The Zol Building And The Existing Rg.D. Renovation And Reconstruction Of The Building In The Scope Of General Construction And Installation Works Related To The Installation Of A Water Reserve Tank And A Generator Along With Electrical, Sanitary And Ventilation Installations. 4). Construction Of A Steel Structure With Installation Of A Photovoltaic Installation Up To 50 Kwp Along With Infrastructure: A. Construction Of A Steel Structureb. Execution Of A Photovoltaic Installation On The Roof Of A Steel Structure Up To 50 Kwpc. Installation Of Two Inverters For Photovoltaic Panelsd. Construction Of A Cable Line To Power The Inverters Of Photovoltaic Panels. Construction Of A Power Supply Line For Parking Space Lighting On A Steel Structure From Pole No. O3/7 To Structure F. Construction Of A Control Cable Line To Zolg. Construction Of A Charging Station For Electric Vehicles With Power Supply.H. Construction Of Parking Spaces Along With Hardening And Drainage – According To Road Project,2. In Terms Of The Subject Of The Order, The Contractor Is Obliged To: 1). To Carry Out Construction Works Under The Supervision Of Persons With Appropriate Construction Qualifications In Construction, Sanitary And Electrical Specialties, I.E. Construction Manager And Work Managers.2). For Surveying Services Of Performed Works And Their Inventory.3). To Conduct Research In The Form Of Archaeological Supervision Based On The Decision Of The Conservator Of Monuments By A Person With Appropriate Authorizations.4). Work On The Historic Greenery Must Be Carried Out By A Person With Appropriate Qualifications.5). Preparing Fire Safety Instructions For A Technical Building, Including Markings And Providing The Necessary Equipment. 6). Preparation Of An Energy Certificate For A Technical Building.7). Preparation Of Documentation For The Acceptance Of The Tank By The Office Of Technical Inspection, Documentation For The Acceptance Of Photovoltaic Panels, Commissioning Of The Generator, Covering The Costs Of Acceptance And Commissioning.8). Preparation Of Operating Instructions For Installed Devices.3. Note: Stage I Is Underway: Construction Of A Fully Turnkey Hospital Pavilion. Construction Works In The First Stage Involve The Construction Of A Two-Story Building With An Attic Connected To The Existing Hospital Pavilion Via An Overhead Connector. Execution Of External Water Supply And Sanitary Sewage Connections And Installations, Including The Removal Of Conflicts With Technical Utilities And Rainwater Drainage Systems Located Directly Next To The Building. Carrying Out Construction, Demolition, Modernization And Assembly, Internal Installation And Finishing Works Related To The Construction Of The Hospital Pavilion Connected By A Connector. Iii. Detailed Conditions For The Implementation Of The Agreement And Its Scope Of Work Are Specified In The Documentation And Draft Agreement - Annex No. 1 To The Swz.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
eb739676-fd8d-46bc-9953-5738347a31de.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders