GTR 80498670

Tenders Are Invited For Acting As An Inspector Of Investor Supervision Over The Implementation Of The Task: Post-Merger Development Of The Village Of Strzelce Wielkie, Szczurowa Commune

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
80498670
Tendering Authority
Subscribe to view
Tender No
ABR.272.7.2024.MS
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Acting As An Inspector Of Investor Supervision Over The Implementation Of The Task: Post-Merger Development Of The Village Of Strzelce Wielkie, Szczurowa Commune
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
24-05-2024 Closed
Work Detail
1. The Subject Of The Order Is To Act As An Investors Supervision Inspector For The Implementation Of The Task: Post-Consolidation Development Of The Village Of Strzelce Wielkie, Szczurowa Commune.2. The Scope Of Construction Works Of The Investment To Be Supervised Includes In Particular: Roads Newly Designed For Construction (Ballast Surface). Km 8,496 Roads Newly Designed For Construction (Soil Surface). Km 10,664 Newly Designed Roads For Construction With Drainage (Rubbery Surface). Km 1,283 Roads Newly Designed For Construction With Drainage (Soil Surface). Km 0.833Roads To Be Reconstructed (Rubble Surface). Km 4,398Roads To Be Reconstructed (Soil Surface). Km 2.895Roads To Be Reconstructed With Drainage (Improvement Of The Crushed Stone Surface). Km 0.436Roads To Be Reconstructed With Drainage (Improvement Of The Parameters Of Drainage Ditches). Km 1,781Ditches In Agricultural Areas To Correct The Course And Improve Technical Parameters. Km 43.958Ditches In Forest Areas To Correct The Course And Improve Technical Parameters. Km 6.471Improvement Of Technical Parameters Of Water Drainage Devices By Cutting Out Bushes. Km 3.801 Land Recultivation In Connection With Closed Roads. Ha 2,568 Area Reclamation In Connection With Liquidated Ditches. Ha 0.24 Reclamation Of The Area In Connection With The Conditions Of Taking Possession. Ha 46,577Construction Of Culverts. Art 102Planned Trees And Shrubs (Rows Of Trees). Art 98Planned Trees And Shrubs (Buffer Zone). Ha 0.39 Note! The Detailed Scope Of Construction Works That Are Subject To Supervision Is Included In The Design Documentation Constituting Annex No. 2 To The Swz. Investor Supervision Is Carried Out On Behalf Of And For The Benefit Of The Ordering Party And Includes Duties Related To Professional And Comprehensive Supervision And Control Of The Investment Task And Includes In Particular: A) All Activities Provided For By The Supervisory Inspector Under Art. 25 - 27 Of The Act Of July 7, 1994 - Construction Law. B) Substantive Analysis Of Technical Documentation For Proper Implementation In Terms Of The Sequence Of Works, Materials Used And Technical Solutions, C) Supervision Of Compliance Of The Workmanship With The Design Documentation And The Contract For The Performance Of Construction Works The Requirements Of The Ordering Party And Applicable Regulations, Technical Knowledge And Construction Art In The Field Of Functional, Utility, Technical, Technological And Material Solutions, Quality, Durability And Aesthetics Of Workmanship, D) Checking The Correctness Of Keeping The Construction Log And Making Entries In It Stating All Circumstances Relevant To The Proper Construction Process E) Requesting Construction Contractors To Make Corrections Or Re-Perform Defectively Performed Works, As Well As Suspending Further Construction Works If Their Continuation Could Pose A Threat Or Cause Unacceptable Non-Compliance With The Design Documentation, F) Checking The Quality Of The Works Performed And Installed Devices, Delivered And Incorporated Products, And In Particular Preventing The Use Of Construction Products, Devices, Systems And Equipment Not Approved By The Ordering Party, Inconsistent With The Design Documentation Or Defective And Not Approved For Use, G) Checking And Acceptance Of Construction Works That Are Covered Or Disappearing, Participating In Tests And Measurements , Technical Inspections And Acceptances, H) Giving Opinions - In The Case Of Proposals To Introduce Alternative Solutions To Those Provided For In The Design Documentation In The Field Of Materials, Structures, Devices, Equipment, Technical, Technological And Utility Solutions, But Of A Quality And Standard Not Lower Than Provided For In The Design Documentation, I) Checking The Documents Presented By The Contractor Regarding Trials, Tests And Checks Required By Regulations Regarding The Completed Construction Works, Confirming The Correctness Of Their Execution, Achieving The Assumed Parameters, Assessing Safety In Operation And Use, And Participating In And Supervising The Tests And Tests Networks, Installations, Devices And Systems, Including Commissioning And Commissioning, J) Initiating And Participating In Meetings And Technical Committees, K) Carrying Out Acceptance Of Works, L) Preparing Acceptance Reports Of Actually Performed Works, With An Estimate Of The Material And Financial Scope In A Given Settlement Period, Constituting The Basis For Issuing Invoices, M) Checking Samples Provided By The Contractor Of Construction Works Or Documentation Confirming The Acceptability Of Materials, Devices, Systems And Elements For Use, In Terms Of Compliance With The Design Documentation And The Requirements Of The Ordering Party, N) Performing Any Other Supervision Activities , Assessments And Checks Regarding The Execution Of Construction Works, Ensuring Safety When Performing Work In An Active Facility, The Method Of Conducting And Coordinating Work With External Entities, O) Checking As-Built Documentation And Other Documents Required By Law In Terms Of Completeness And Correctness, And Recording Changes Introduced During Implementation Of Construction Works, Before The Final Acceptance, P) Informing The Ordering Party About The Progress Of The Works And Signaling - In Advance - About Any Events Affecting The Implementation Of The Task, Including Its Timely Completion, Q) At The Request Of The Ordering Party, Checking And Controlling The Settlements Of The Task ) Confirmation Of The Readiness Of The Contractor Of The Task For Final Acceptance And Participation In The Final Acceptance Of The Task, S) Organizing And Participating In Inspections During The Warranty Period And In The Procedure For Removing Defects Occurring During This Period, With The Participation Of The Ordering Party And The Contractor Of Construction Works, T) Close Cooperation With The Ordering Party And Providing Providing The Ordering Party With Information On The Progress Of The Works.U) Participation In Committees Appointed To Identify Defects Discovered During The Warranty And Warranty Period Granted By The Contractor Of Construction Works, Enforcing Their Removal And Preparing Appropriate Protocols.3. If, During The Period Of Execution Of The Works, There Is A Need To Perform Additional Works Not Provided For In The Contracts Concluded With The Contractors, The Contractor Should Immediately Notify The Ordering Party About It In Order To Decide Whether To Commission Them To The Contractor.4. The Contractor Is Obliged To Come To The Construction Site At Every Request From The Ordering Party.5. The Contractor Will Perform Investor Supervision, Participating In Activities Requiring Supervision, Where: A) Stay Means Exercising Investor Supervision On The Construction Site, B) Stays Should Take Place At Least Once In 2 Weeks, Each Stay Must Be Confirmed By An Entry In The Log. Construction, 6. The Ordering Party Has The Right To Submit Comments And Reservations Regarding The Investment Process At Any Time, Which The Contractor Is Obliged To Immediately Analyze And Take Into Account, Notifying The Ordering Party About The Actions Taken And Their Effects. 7. The Contractor Provides A Warranty For The Subject Of The Contract For A Period Of 24 Months From The Date Of Fault-Free Final Acceptance Of The Works.8. The Contractor Provides Warranty For Defects In The Subject Of The Contract For A Period Of 24 Months From The Date Of Fault-Free Final Acceptance Of The Works.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
ebc38e4e-7bb5-4711-88c7-172aae5ea693.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders