GTR 80404087
Tenders Are Invited For Reconstruction Of The Kitchen In The Village Hall In Solec Along With Changing The Use Of Utility Rooms Into Kitchen Facilities
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
80404087
Tendering Authority
Subscribe to view
Tender No
RI.271.11.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Of The Kitchen In The Village Hall In Solec Along With Changing The Use Of Utility Rooms Into Kitchen Facilities
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
05-06-2024
Closed
Work Detail
3.1. The Subject Of The Order Is Reconstruction Of The Kitchen In The Village Hall In Solec Along With Changing The Use Of Utility Rooms Into Kitchen Facilities. The Investment Is Planned To Be Implemented In The Town Of Solec, Commune. Przemęt On Plot No. 419/2. The Planned Works Are Intended To Improve The Functionality Of The Facility And Adapt The Rooms To Currently Applicable Regulations. Currently, The Building Contains Rooms Partially Sunken Into The Ground, Constituting The Basement Level. As A Result Of The Reconstruction Of The Kitchen, On The Ground Floor There Will Be A Kitchen, A Scullery And A Communication Room, While On The Basement Level There Will Be A Communication Area, A Cloakroom, A Toilet, A Peeling Room And Another Communication Area. As Part Of The Reconstruction, The Installations And Building Elements Will Be Replaced And Renovated, Such As Covering The Walls With Ceramic Tiles. , Replacement Of Joinery, Replacement Of Floors, Replacement Of Electrical And Water And Sewage Installations. In The Existing Part Of The Building. As Part Of The Kitchen Renovation, New Sanitary Installations Will Be Built: Water, Sanitary Sewage, Ventilation. In Addition, As Part Of The Investment, Rooms In The Building Will Be Equipped With Equipment, Devices And Furniture Depending On The Functions Performed (According To The Construction Design). The Investment In Question Includes: - Demolition Works Consisting Of On The Demolition Of Partition Walls And Concrete Floor Coverings, Dismantling Of Internal Windows And Doors, Demolition Of Internal And External Stairs, Dismantling Of The Inter-Story Ceiling, Construction Of New Load-Bearing And Partition Walls, Internal Foundation Walls, Walls In The Dry Construction System As Fire Protection Separation Walls. , Insulating The Existing External Walls With Mineral Wool, Insulating The Existing Foundation Walls With Styrodur And Making A Facade With Mineral Plaster With A Sheep-Like Structure, Constructing New Internal Stairs And Stairs To The Stage And Rebuilding The Existing External Stairs, Constructing Suspended Ceilings, Demolition Of All Concrete Floors And After Laying The Sanitary Installations, Execution Of New Ones With Ceramic Tiles, Installation Of New Windows And Doors, Roofing At The Entrance, Execution Of Sheet Metal Work And Gutters, Moisture And Thermal Insulation, In All Rooms Where Wall Tiles Will Not Be Covered, Wall Tiles Will Be Covered. Gypsum Plasters On Existing Plasters.3.2. A Detailed Description Of The Subject Of The Order Is The Design Documentation Prepared By: Firma Usługowo Handlowa A. Wojciechowski - Annex No. 9 To The Swz. 3.3. The Contractor Will Make The Subject Of The Order From Its Own Materials.3.4. The Scope Of The Subject Of The Order Also Includes Post-Construction Geodetic Inventory.3.5. The Scope Of The Subject Of The Order Includes Making All Required Notifications/Acceptances By Relevant Organizational Units/Services (E.G. Sanitary And Epidemiological Station, Fire Brigade, Chimney Sweep) In Order To Obtain A Permit To Use The Facility Being The Subject Of The Investment, Along With Preparing An Application For Obtaining A Permit To Use With The Appropriate Annexes Resulting From Construction Law (Including Energy Certificate).3.6. The Contractors Obligations Include Carrying Out All Necessary Tests And Bearing All Related Costs, As Well As Installing And Maintaining Signage For The Duration Of The Works.3.7. The Contractor Is Obliged To Provide Its Own Source Of Electricity For The Duration Of The Investment. If It Is Not Possible To Use Its Own Source Of Electricity, The Ordering Party, Under The Agreement, Will Provide An Energy Consumption Point And Charge The Contractor With The Costs According To The Agreed Principles.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
22505b85-8126-4053-8ea5-0cc0efd05e8b.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.