GTR 80404069
Tenders Are Invited For Renovation Of Sanitary Facilities In The Teaching Building Of The Vocational And General School Complex In Biłgoraj
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
80404069
Tendering Authority
Subscribe to view
Tender No
PCUW.261.4.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Renovation Of Sanitary Facilities In The Teaching Building Of The Vocational And General School Complex In Biłgoraj
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
03-06-2024
Closed
Work Detail
1. The Subject Of The Order Is The Renovation Of Sanitary Facilities In The Teaching Building Of The Complex Of Vocational And General Education Schools In Biłgoraj.2. Construction And Installation Works Are Intended To Modernize Sanitary Facilities For Students And Adapt Them To Use By Disabled People. In Order To Reduce Inconvenience To Students And Teachers, The Renovation Will Be Carried Out During The Summer Holidays: July And August 2024. The Sanitary Facilities To Be Renovated Are Located On The First And Second Floors Of The Teaching Building Of The Vocational And General Education School Complex In Biłgoraj.3. The Scope Of Work Related To Dismantling According To The Bill Of Quantities, Including: • Removing Steel Door Frames From The Wall, • Dismantling A Brick Wall, • Dismantling The Floor Made Of Terracotta Tiles, • Tearing Off The Cement Screed, • Dismantling The Wall Covering Made Of Glazed Tiles, • Dismantling Fragments Of Partition Walls, • Chipping Away Some Of The Internal Plasters, • Removing Rubble From The Building, • Dismantling The Water And Sewage System Along With The Fittings. • Carving Horizontal And Vertical Grooves In The Brick Partition Walls, • Wiping The Existing Internal Plasters And Scraping Off The Paint On The Ceilings, • Completing Brick Walls, • Facing Walls With Glazed Tiles, • Priming Substrates, • Plastering (Plaster) On Walls And Ceilings, • Performing Moisture-Proof Insulation.4. Scope Of Renovation Works - Works Related To Assembly According To The Bill Of Quantities, Including: • Laying Of Pvc Sewage Pipelines, • Filling Of Drains, • Installation Of Washbasins, Toilets With A Compact Toilet Flusher, • Installation Of Washbasin Faucets, • Installation Of Cement Floors And Internal Plasters, Laying Tiles On Floors And Walls, Installing Door Frames And Installing Door Leaves, • Painting, Modernization Of Lighting, Connection Of Fans.5. In Order To Correctly Price The Subject Of The Order, The Organizational Unit Recommends That The Contractor, Before Preparing And Submitting The Offer, Conducts A Local Inspection Of The Renovated Rooms And The Surroundings Of The Building At His Own Expense In Order To Estimate All Data That May Be Necessary To Prepare The Offer.6. All Works Included In The Scope Of The Subject Of The Order Must Be Performed In Accordance With Applicable Regulations And The Principles Of Construction Practice, Use Materials And Construction Products In Accordance With Applicable Standards And Having Valid Certificates And Approvals Allowing For Use By The Building Research Institute.7. All Materials Used By The Contractor During The Implementation Of The Subject Of The Contract Should Be Brand New And Meet, In Terms Of Quality, The Requirements Of Products Approved For Trading And Use In Construction In Accordance With Art. 10 Of The Act Of July 7, 1994 Construction Law (Consolidated Text: Journal Of Laws Of 2023, Item 682, As Amended) And The Qualitative And Specific Requirements Specified In The Description Of The Subject Of The Contract, Which Include: Architectural And Construction Design, Bill Of Quantities And Detailed Technical Specifications.8. Construction Works Must Meet The Requirements Of The Organizational Unit, Described In The Procedure Documentation, Detailed Technical Specifications, In Accordance With All Applicable Legal Acts Relevant To The Subject Of The Order.9. The Contractor Is Obliged In Particular To: A) Apply The Act Of July 7, 1994 - Construction Law (Consolidated Text: Journal Of Laws Of 2023, Item 682, As Amended), B) Apply The Regulation Of The Minister Of Infrastructure Of June 23, 2003 On Information Regarding Health And Safety And The Health And Safety Plan (Journal Of Laws Of 2003, No. 120, Item 1126), C) Application Of Other Provisions Aimed At Maintaining Occupational Health And Safety And Health And Life Protection When Performing The Works Covered By This Order, Including In Particular The Regulation Of The Minister Of Labor And Social Policy Of September 26, 1997. On General Occupational Health And Safety Regulations - (Journal Of Laws Of 2003, No. 169, Item 1650, As Amended), D) Ensuring Proper Law And Order During Construction On The Construction Site Within The Limits Provided By The Organizational Unit, Compliance With Occupational Health And Safety Regulations, E) Allowing Employees Of State Construction Supervision Authorities To Enter The Construction Site And Providing Them With The Necessary, Required Documents, F) In The Event Of Damage Or Destruction Of The Completed Works, Repair Them And Restore Them To Their Previous Condition Without Requesting Additional Remuneration. G) Produce Them Upon Request Organizational Unit (Supervision Inspector) Safety Certificate, Declaration Of Compliance Or Certificate Of Compliance With The Polish Standard Or Technical Approval In Relation To The Indicated Materials Or Devices.10. Colors Of Materials Agreed With The Organizational Unit.11. The Contractor Is Obliged To Secure The Renovation Work Area And Other Rooms Made Available By The Organizational Unit For The Needs Of Work Organization Against Unauthorized Persons. The Contractor Also Undertakes To Secure The Used Premises, Installations And Devices That Are Not The Subject Of The Contract, And Undertakes To Repair Any Damage To Elements Not Covered By The Order At Its Own Expense.12. The Subject Of The Order Also Includes The Removal Of Unnecessary Post-Demolition Materials And Current Renovation And Construction Waste. The Contractor Undertakes To Transfer The Waste Generated To An Entity Authorized To Dispose Of This Type Of Pollution. A Detailed Description Of The Subject Of The Order Is Included In Annex No. 7 To The Swz.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
f03a2571-2a17-40e5-9582-c78426c62e15.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.