GTR 80263261
Tenders Are Invited For Expansion Of The Water Supply Network In The City Of Myszkowa - Ul. Pawia.
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
80263261
Tendering Authority
Subscribe to view
Tender No
ZP.271.10.2024.JG
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Expansion Of The Water Supply Network In The City Of Myszkowa - Ul. Pawia.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
27-05-2024
Closed
Work Detail
1. The Subject Of The Order Is The Construction Of A Water Distribution Network In Ul. Pawia In Myszków. Due To The Complicated Nature Of The Works, The Design Documentation Was Divided Into Two Stages, I.E.: Stage In Open Areas At Ul. Pawia And A Stage In Closed Pkp Areas In Ul. Pawia. The Water Supply Network Under Construction Was Designed With Pipes With Diameters Of Ø 125, Using Materials Included In The Description Of The Subject Of The Order And In The Design Documentation. Length Of The Section Under Construction For Open Areas In Ul. Pawia Is 684.66 M, While The Length Of The Section Under Construction For Closed Pkp Areas In Ul. Pawia Is 310.16 M. The Total Length Of The Water Supply Network Under Construction Is 994.82 M. The Planned Water Supply Will Be Connected At Point W1 At The Height Of The Property At Ul. Nowowiejska 145 To The Existing Pvc Distribution Water Pipeline With A Diameter Of 160 Mm. The Water Supply Network Under Construction Will Include 8 Dn 80 Above-Ground Hydrants With Double Closures, Whose Task Will Be To Vent And Drain The Constructed Section Of The Network. The Ordering Party Allows Construction Works To Be Performed Using The Open Excavation Method Or The Directed Drilling Method, However, The Section Of The Water Supply Network Running Under The Pkp Railway Tracks Should Be Performed Only Using The Directed Drilling Method. If Construction Works Are Carried Out Using The Directed Drilling Method, Three-Layer Rc Pipes With Diameters Consistent With The Design Should Be Used. The Passage Under The Railway Line Should Be Made Using The Drilling Method Guided By A Pe Sdr11 Dn 225 Drilling (Cover) Pipe At An Angle Of 90° To The Track Axis. The Drilling Should Be Performed With One Pe Pipe 225 X 20.5 Mm, 38.04 M Long, On The Section Of Railway Line No. 1 Warszawa Katowice In The Myszków Nowa Wieś Location At 258 Km Of The Track. On The Section From Point W1 To Point W2 (Section Of The Passage Under The Railway Tracks), Material For The Construction Of The Water Pipeline Should Be Used In Accordance With The Design, I.E. Pipes With Socket Connections, Made Of Ductile Cast Iron Ggg 40 According To Pn-En 545:2010. Before Commencing The Works, The Contractor Must Notify The Users Of The Network And Other Utilities With Which The Constructed Water Supply Network May Interfere During The Works. In Connection With The Contract No. Knka7.6141.124.2020/36 Signed By The Commune Of June 28, 2022 Regarding The Permit To Carry Out Works On Pkp Land, The Contractor Should Pay A One-Off Fee For Placing And Leaving The Infrastructure In The Ground On Real Estate With Registration Number 750/ 9 And 1256, Nowa Wieś District, No Later Than 21 Days Before The Commencement Of Construction Works, In The Amount Of Pln 2,172.18 Gross. Additionally, The Contractor Is Obliged To Sign An Agreement With Pkp Polskie Linie Kolejowe S.A. To Make The Property Available For The Purpose Of Carrying Out Works And To Pay Fees For Occupying The Area Of Pkp Land. 2. The Subject Of The Order Has Been Comprehensively Described In Annex No. 1 To The Swz - Description Of The Subject Of The Order And In Annex No. 2 To The Swz - Documentation For The Execution Of The Order.3. The Execution Of The Subject Of The Order In Accordance With Annexes No. 1 And 2 To The Swz Will Enable Potential Users - Recipients Of Drinking Water - To Be Connected To The Water Supply Network. The Designed Water Supply Network Does Not Constitute Barriers For People With Disabilities In The Above-Mentioned Areas. Scope.4. Type Of Order: Construction Work.5. Cpv Codes:1) Main Cpv Code: 45000000-7: Construction Works;2) Additional Cpv Codes: In Swz.6. In Each Case When The Description Of The Subject Of The Contract Refers To The Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Section 1 Point 2 And Section 3 Of The Public Procurement Law, The Ordering Party Allows Solutions Equivalent To Those Described, And Such A Reference Is Accompanied By The Words Or Equivalent.7. The Ordering Party Does Not Reserve The Obligation For The Contractor To Personally Perform Key Tasks, In The Manner Specified In Art. 121 Of The Public Procurement Law. 8. The Contractor May Entrust The Execution Of Part Of The Order To A Subcontractor. The Ordering Party Requests That The Contractor Indicate In The Offer The Parts (Scopes) Of The Order The Performance Of Which He Intends To Entrust To Subcontractors, And That The Contractor Provide The Names Of Any Subcontractors, If They Are Already Known. For This Purpose, The Contractor Should Provide Appropriate Information In The Offer Form, Which Constitutes Annex No. 3 To The Swz. If The Contractor Does Not Intend To Perform The Order With The Participation Of Subcontractors, Please Enter Not Applicable Or Other Similar Wording In The Appropriate Place In The Offer Form Table.9. Entrusting The Performance Of Part Of The Order To Subcontractors Does Not Release The Contractor From Responsibility For Proper Performance Of The Order.10. In These Proceedings, The Ordering Party Does Not Allow The Submission Of Partial Offers.11. Reasons For Not Dividing The Awarded Contract Into Lots. The Ordering Party Divided The Contract Into Parts By Awarding The Contract In Three Separate Procedures. The Ordering Party Believes That Further Division Of The Awarded Contract In The Proceedings In Question Will Not Be Made For Technical, Organizational And Economic Reasons. Considering The Fact That The Task To Be Performed Is Technically Difficult And Its Division Would Increase The Difficulty In Its Implementation, E.G. In The Coordination Of Works In Open Areas At Ul. Pawia With Closed Pkp Areas In Ul. Pawia, Speed In Carrying Out Earthworks And Assembly Works, Temporary Change In The Organization Of Car Traffic, And As A Result, The Intended Final And Material Effect Would Be Disrupted.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
bf5f1b9d-c56f-419b-a6ca-951d059a2b69.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.